2717
|
Tuesday, November 12, 2024, 12:30 |
Frank Song | ITW | Standard Operation | TM4 | UCx#46 | Module Connection | TM4 with new target UCx#46 was moved
from TCS to ITW and has been re-connected
right after. see attachment pls. |
|
2719
|
Thursday, November 21, 2024, 14:11 |
Frank Song | 5 Shielding Blocks | Standard Operation | TM4 | UCx#46 | shielding blocks transfer | Shielding blocks have been moved
from ITE to ITW and MAA is secured. |
|
2721
|
Tuesday, November 26, 2024, 13:03 |
Frank Song | South Hot-Cell | Standard Operation | TM3 | UCx#47 | electrical check/leak check | An electrical check and leak check had
been done after new target UCx47 was installed
on TM3 in SHC. see attachment pls. |
|
2725
|
Tuesday, December 03, 2024, 10:10 |
Frank Song | ITE | Standard Operation | TM2 | Ta#68 | module disconnection | TM2 with spent target TA#68 was disconnected
in ITE and is being moved to SHC. All water
lines are purged for module storage. |
|
2729
|
Wednesday, December 04, 2024, 08:05 |
Frank Song | ITE | Standard Operation | TM3 | UCx#47 | Module Connection | TM3 with new target UCx#47 was connected
in ITE right after be moved from TCS. |
|
2735
|
Monday, December 09, 2024, 13:10 |
Frank Song | 5 Shielding Blocks | Standard Operation | TM3 | UCx#47 | shielding blocks transfer | 5 Shielding Blocks have been transferred
from ITW to ITE. MAA is secured after moving. |
|
2740
|
Friday, January 03, 2025, 12:34 |
Frank Song | 5 Shielding Blocks | Maintenance | | UCx#47 | shielding blocks moving | Five shielding blocks are moved from
ITE to storage area ( one of them is sitting
on B2 as limit of room) for target stations |
|
2741
|
Monday, January 06, 2025, 08:38 |
Frank Song | ITW | Standard Operation | TM4 | UCx#46 | module disconnection | TM4 WITH UCx#46 was disconnected
in 2025-01-02 in ITW. Forms attached. |
|
2747
|
Monday, January 13, 2025, 10:36 |
Frank Song | ITE | Standard Operation | TM3 | UCx#47 | module disconnection | TM3 with spent target UCx#47 was
disconnected in ITE and will be moved to
SHC. |
|
2753
|
Wednesday, January 22, 2025, 10:29 |
Frank Song | Faraday Cage | Maintenance | | | Annual clean up for ITE/ITW Faraday cages | David and I cleaned both cages in
ISAC1 electric room, all done. |
|
2787
|
Tuesday, April 01, 2025, 09:47 |
Frank Song | North Hot-Cell | Repair | | | Two NHC light bulbs replacement | 2 broken lights of NHC were replaced in
Target Hall. see pics attached. |
    |
2792
|
Thursday, April 24, 2025, 11:13 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#48 | electrical check/leak check | TM4 with new target UCx#48 installed
was E/L checked on the top of NHC, see attachment
uploaded with pls. |
|
2800
|
Tuesday, May 06, 2025, 09:18 |
Frank Song | ITE | Standard Operation | TM4 | UCx#48 | Module Connection | TM4 with first target UC#48 of this
year has been connected in ITE. see attachment
please. |
|
2801
|
Tuesday, May 06, 2025, 14:40 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UC#49 | electrical check/leak check | TM2 with new target UC#49 installed
is E/L checked on the flange of NHC in TH.
see attachment for detail. |
|
2804
|
Tuesday, May 13, 2025, 13:12 |
Frank Song | MAA | Repair | | | Swap out the target hall alpha CAM. |
|
|
2805
|
Tuesday, May 13, 2025, 13:13 |
Frank Song | MAA | Repair | | | Swap out the target hall alpha CAM. | AlphaCAM has been replaced and tested by
RPG in MAA target hall. (per Document-154779)
WorkPermit # I2025-05-13-3 |
|
2512
|
Thursday, December 21, 2023, 09:37 |
Ferran Boix Pamies | ITE | Development | | | Rewiring of TC multiping wires | Thursday, December 21, 2023, 09:36.
ITE multipin wires 12-13-14-15 were rewired
from the RF driver box to a TC datalogger |
|
2552
|
Thursday, March 21, 2024, 11:35 |
Ferran Boix Pamies | ITE | Development | | | Wiring of new thermocouple PLC module | Thursday, March 21, 2024, 11:33 Three
channels are available now for thermocouple
readouts from the Target multipin. Wiring |
|
2503
|
Monday, November 20, 2023, 12:28 |
Eric Lahe | South Hot-Cell | Maintenance | | | Light Bulb Replacement - South Hot Cell roof lights | 3 light bulbs replaced in the ISAC
South Hot Cell - North West light, South
west light, and South East light bulbs. Northeast |
|
2584
|
Tuesday, May 07, 2024, 12:39 |
Eric Lahe | Spent Target Vault | Repair | | | ISAC Storage Vault Re-alignment |
|
|