Tuesday, November 12, 2024, 12:30, Frank Song, ITW, Standard Operation, TM4, UCx#46, Module Connection
|
TM4 with new target UCx#46 was moved from TCS to ITW and has been re-connected right after. see attachment pls. |
Thursday, November 21, 2024, 14:11, Frank Song, 5 Shielding Blocks, Standard Operation, TM4, UCx#46, shielding blocks transfer
|
Shielding blocks have been moved from ITE to ITW and MAA is secured. |
Tuesday, November 26, 2024, 13:03, Frank Song, South Hot-Cell, Standard Operation, TM3, UCx#47, electrical check/leak check
|
An electrical check and leak check had been done after new target UCx47 was installed on TM3 in SHC. see attachment pls. |
Tuesday, December 03, 2024, 10:10, Frank Song, ITE, Standard Operation, TM2, Ta#68, module disconnection
|
TM2 with spent target TA#68 was disconnected in ITE and is being moved to SHC. All water lines are purged for module storage. |
Wednesday, December 04, 2024, 08:05, Frank Song, ITE, Standard Operation, TM3, UCx#47, Module Connection
|
TM3 with new target UCx#47 was connected in ITE right after be moved from TCS. |
Monday, December 09, 2024, 13:10, Frank Song, 5 Shielding Blocks, Standard Operation, TM3, UCx#47, shielding blocks transfer
|
5 Shielding Blocks have been transferred from ITW to ITE. MAA is secured after moving. |
Friday, January 03, 2025, 12:34, Frank Song, 5 Shielding Blocks, Maintenance, , UCx#47, shielding blocks moving
|
Five shielding blocks are moved from ITE to storage area ( one of them is sitting on B2 as limit of room) for target stations maintenance in 2025
winter shut down . |
Monday, January 06, 2025, 08:38, Frank Song, ITW, Standard Operation, TM4, UCx#46, module disconnection
|
TM4 WITH UCx#46 was disconnected in 2025-01-02 in ITW. Forms attached. |
Monday, January 13, 2025, 10:36, Frank Song, ITE, Standard Operation, TM3, UCx#47, module disconnection
|
TM3 with spent target UCx#47 was disconnected in ITE and will be moved to SHC. |
Wednesday, January 22, 2025, 10:29, Frank Song, Faraday Cage, Maintenance, , , Annual clean up for ITE/ITW Faraday cages
|
David and I cleaned both cages in ISAC1 electric room, all done. |
Tuesday, April 01, 2025, 09:47, Frank Song, North Hot-Cell, Repair, , , Two NHC light bulbs replacement    
|
2 broken lights of NHC were replaced in Target Hall. see pics attached. |
Thursday, April 24, 2025, 11:13, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#48, electrical check/leak check
|
TM4 with new target UCx#48 installed was E/L checked on the top of NHC, see attachment uploaded with pls. |
Tuesday, May 06, 2025, 09:18, Frank Song, ITE, Standard Operation, TM4, UCx#48, Module Connection
|
TM4 with first target UC#48 of this year has been connected in ITE. see attachment please. |
Tuesday, May 06, 2025, 14:40, Frank Song, North Hot-Cell, Standard Operation, TM2, UC#49, electrical check/leak check
|
TM2 with new target UC#49 installed is E/L checked on the flange of NHC in TH. see attachment for detail. |
Tuesday, May 13, 2025, 13:12, Frank Song, MAA, Repair, , , Swap out the target hall alpha CAM.
|
|
Tuesday, May 13, 2025, 13:13, Frank Song, MAA, Repair, , , Swap out the target hall alpha CAM.
|
AlphaCAM has been replaced and tested by RPG in MAA target hall. (per Document-154779)
WorkPermit # I2025-05-13-3 |
Thursday, December 21, 2023, 09:37, Ferran Boix Pamies, ITE, Development, , , Rewiring of TC multiping wires
|
Thursday, December 21, 2023, 09:36. ITE multipin wires 12-13-14-15 were rewired from the RF driver box to a TC datalogger inside the HV cage. A
webcam was also installed to monitor the TC values during operation. This is only a temporary setup to be upgraded during shutdown. |
Thursday, March 21, 2024, 11:35, Ferran Boix Pamies, ITE, Development, , , Wiring of new thermocouple PLC module
|
Thursday, March 21, 2024, 11:33 Three channels are available now for thermocouple readouts from the Target multipin. Wiring from the PLC modules
to the connection terminal blocks and labeling done. |
Monday, November 20, 2023, 12:28, Eric Lahe, South Hot-Cell, Maintenance, , , Light Bulb Replacement - South Hot Cell roof lights
|
3 light bulbs replaced in the ISAC South Hot Cell - North West light, South west light, and South East light bulbs. Northeast light currently still
working.
|
Tuesday, May 07, 2024, 12:39, Eric Lahe, Spent Target Vault, Repair, , , ISAC Storage Vault Re-alignment
|
ISAC Storage Vault Door Re-alignment (April-May 2024) |
|