  2717   Tuesday, November 12, 2024, 12:30 Frank SongITWStandard OperationTM4UCx#46Module Connection

 TM4 with new target UCx#46 was moved from TCS to ITW and has been re-connected right after. see attachment pls.

Attachment 1: TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf
TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf
  2719   Thursday, November 21, 2024, 14:11 Frank Song5 Shielding BlocksStandard OperationTM4UCx#46shielding blocks transfer

 Shielding blocks have been moved from ITE to ITW and MAA is secured.

  2721   Tuesday, November 26, 2024, 13:03 Frank SongSouth Hot-CellStandard OperationTM3UCx#47electrical check/leak check

An electrical check and leak check had been done after new target UCx47 was installed on TM3 in SHC. see attachment pls.

Attachment 1: TM3_with_new_target_UCx#47_electrical_check_on_SHC_2024-11-26.pdf
TM3_with_new_target_UCx#47_electrical_check_on_SHC_2024-11-26.pdf
  2725   Tuesday, December 03, 2024, 10:10 Frank SongITEStandard OperationTM2Ta#68module disconnection

TM2 with spent target TA#68 was disconnected  in ITE and is being moved to SHC. All water lines are purged for module storage.

Attachment 1: TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf
TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf
  2729   Wednesday, December 04, 2024, 08:05 Frank SongITEStandard OperationTM3UCx#47Module Connection

TM3 with new target UCx#47 was connected in ITE right after be moved from TCS. 

Attachment 1: TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf
TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf
  2735   Monday, December 09, 2024, 13:10 Frank Song5 Shielding BlocksStandard OperationTM3UCx#47shielding blocks transfer

 5 Shielding Blocks have been transferred from ITW to ITE. MAA is secured after moving.

  2740   Friday, January 03, 2025, 12:34 Frank Song5 Shielding BlocksMaintenance UCx#47shielding blocks moving

 Five shielding blocks are moved from ITE to storage area ( one of them is sitting on B2 as limit of room) for target stations maintenance in 2025 winter shut down .

  2741   Monday, January 06, 2025, 08:38 Frank SongITWStandard OperationTM4UCx#46module disconnection

 TM4 WITH UCx#46 was disconnected in 2025-01-02 in ITW. Forms attached.

Attachment 1: TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf
TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf
  2747   Monday, January 13, 2025, 10:36 Frank SongITEStandard OperationTM3UCx#47module disconnection

 TM3 with spent target UCx#47 was disconnected in ITE and will be moved to SHC.

Attachment 1: TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf
TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf
  2753   Wednesday, January 22, 2025, 10:29 Frank SongFaraday CageMaintenance  Annual clean up for ITE/ITW Faraday cages

 David and I cleaned both cages in ISAC1 electric room, all done.

  2787   Tuesday, April 01, 2025, 09:47 Frank SongNorth Hot-CellRepair  Two NHC light bulbs replacement

2 broken lights of NHC were replaced in Target Hall. see pics attached.

Attachment 1: Image_(3).jpg
Image_(3).jpg
Attachment 2: Image_(4).jpg
Image_(4).jpg
Attachment 3: Image_(5).jpg
Image_(5).jpg
Attachment 4: Image_(6).jpg
Image_(6).jpg
Attachment 5: Image_(7).jpg
Image_(7).jpg
  2792   Thursday, April 24, 2025, 11:13 Frank SongNorth Hot-CellStandard OperationTM4UCx#48electrical check/leak check

 TM4 with new target UCx#48 installed was E/L checked on the top of NHC, see attachment uploaded with pls.

Attachment 1: TM4_electric_and_leak_checked_after_UCx#48_IG-LIS_installed_in_NHC_2025-04-23.pdf
TM4_electric_and_leak_checked_after_UCx#48_IG-LIS_installed_in_NHC_2025-04-23.pdf TM4_electric_and_leak_checked_after_UCx#48_IG-LIS_installed_in_NHC_2025-04-23.pdf
  2800   Tuesday, May 06, 2025, 09:18 Frank SongITEStandard OperationTM4UCx#48Module Connection

 TM4 with first target UC#48 of this year has been connected in ITE. see attachment please.

Attachment 1: TM4_with_UC#48_connection_in_ITE_2025-05-01.pdf
TM4_with_UC#48_connection_in_ITE_2025-05-01.pdf TM4_with_UC#48_connection_in_ITE_2025-05-01.pdf TM4_with_UC#48_connection_in_ITE_2025-05-01.pdf TM4_with_UC#48_connection_in_ITE_2025-05-01.pdf
  2801   Tuesday, May 06, 2025, 14:40 Frank SongNorth Hot-CellStandard OperationTM2UC#49electrical check/leak check

 TM2 with new target UC#49 installed is E/L checked on the flange of NHC in TH. see attachment for detail.

Attachment 1: TM2_with_UC#49_electric_check_on_NHC_2025-05-06.pdf
TM2_with_UC#49_electric_check_on_NHC_2025-05-06.pdf
  2512   Thursday, December 21, 2023, 09:37 Ferran Boix PamiesITEDevelopment  Rewiring of TC multiping wires
Thursday, December 21, 2023, 09:36. ITE multipin wires 12-13-14-15 were rewired from the RF driver box to a TC datalogger inside the HV cage. A webcam was also installed to monitor the TC values during operation. This is only a temporary setup to be upgraded during shutdown.
  2552   Thursday, March 21, 2024, 11:35 Ferran Boix PamiesITEDevelopment  Wiring of new thermocouple PLC module

 Thursday, March 21, 2024, 11:33 Three channels are available now for thermocouple readouts from the Target multipin. Wiring from the PLC modules to the connection terminal blocks and labeling done.

  2503   Monday, November 20, 2023, 12:28 Eric LaheSouth Hot-CellMaintenance  Light Bulb Replacement - South Hot Cell roof lights

 3 light bulbs replaced in the ISAC South Hot Cell - North West light, South west light, and South East light bulbs. Northeast light currently still working.

 

The South East light is not working after bulb replacement. This bulb was tested using the wires from the Northeast light station and the bulb is working properly. Electrical services is being contacted to troubleshoot the cable issues. 

  2584   Tuesday, May 07, 2024, 12:39 Eric LaheSpent Target VaultRepair  ISAC Storage Vault Re-alignment

 

ISAC Storage Vault Door Re-alignment (April-May 2024) 

Issue

  • Rollers gouging and marking on roller supports, testing shows door shifts at least 185 thou on structural beam when fully open vs. fully closed
  • door misaligned: 1/4" laterally, slight rotation (~1/16" difference across closed door gap).

 

Repair

  • Moved left structural beam (facing front of door) inward 1/4" at post.
  • Loosened drive system to shift door over via crane to average laterally (1/8" shift) towards center,
  • Attempted to fix door rotation with crane, door would not settle down perfectly flush, but got slight improvement 
  • Adjusted limit switches for fully open and closed (due to the adjustments made previously, needed to realign limit switches) - adjusted flag for final close back by ~1/4"; adjusted limit switch at back of vault forward ~1/4" 

 

Verification 

  • Unloaded vault door actuation tested multiple times with no issues, door returned to same position every cycle, no interferences during travel
  • Vault Door actuation tested with trays 4 and 6 engaged, no issues
  • All pails accessible when open
  • Tested open and closed limit switches: the open limit switches are working properly; the closing soft and hard limit switches are slightly close together, causing the door to just "bump" the vault when closing, The scale of this is OK for current operation, will be adjusted when the ISAC Target Hall Controls Overhaul is done
  • Tested and reset Emergency override mechanism - works properly

 

Outstanding Tasks

  • Will paint marks on structural supports to track if problem reoccurs - update ELog when complete 

 

System State: Operational

See attached file for details

 

 

Attachment 1: Testing_and_updates_to_storage_vault_2024-05-01.pdf
Testing_and_updates_to_storage_vault_2024-05-01.pdf Testing_and_updates_to_storage_vault_2024-05-01.pdf Testing_and_updates_to_storage_vault_2024-05-01.pdf Testing_and_updates_to_storage_vault_2024-05-01.pdf Testing_and_updates_to_storage_vault_2024-05-01.pdf Testing_and_updates_to_storage_vault_2024-05-01.pdf Testing_and_updates_to_storage_vault_2024-05-01.pdf Testing_and_updates_to_storage_vault_2024-05-01.pdf
  26   Thursday, September 01, 2011, 09:11 Don JacksonITWStandard OperationTM1UCx#2Argon Venting West Station

West target station is setup to use argon for tank venting.  There is 1200 PSI remaining on argon bottle in electrical room.  That is sufficent for venting west target station to atmosphere twice.  ISAC Operations has been previousily contacted and their procedures for venting remain the same except that they can not rely on ITW:CG4S to determine when at atmospheric pressure.  I have asked them to contact me if an unscheduled vent is required.

  122   Friday, June 08, 2012, 15:00 Don JacksonSouth Hot-CellStandard OperationTM1Nb#6Electrical Check Nb#6 at end of run

Megger check values were low but still within operational range.

Attachment 1: Nb#6_End_of_Run.JPG
Nb#6_End_of_Run.JPG