ID Date Authordown Category Type Module Target/Number Subject
  2691   Tuesday, September 24, 2024, 09:37 Frank SongITE/ITWStandard Operation  shielding blocks transfer

 5 shielding blocks have been moved from ITE to ITW.

  2695   Tuesday, October 01, 2024, 09:16 Frank SongITEStandard OperationTM2Ta#67module disconnection

 TM2 with spent target Ta#67 was disconnected in ITE. see attachment pls.

  2701   Wednesday, October 09, 2024, 14:04 Frank SongITEStandard OperationTM2Ta#68Module Connection

 TM2 with new target Ta#68 installed is connected in ITE. Pls see form attached.

  2706   Tuesday, October 15, 2024, 12:57 Frank SongITW/ITEStandard Operation  shielding blocks transfer

 5 shielding blocks are transferred from ITW to ITE, Target Area is secured again after moving.

  2710   Tuesday, November 05, 2024, 09:49 Frank SongITWStandard OperationTM4TiC#9 module disconnection

 TM4 with spent target TiC#9 was disconnected in 29-10-2024 and it is being moved from ITW to SHC.

  2711   Tuesday, November 05, 2024, 11:04 Frank SongSouth Hot-CellStandard Operation TiC#9 electrical check with the spent target

 David made electrical check right after TM4 is moved from ITW to SHC. see attachment pls.

  2717   Tuesday, November 12, 2024, 12:30 Frank SongITWStandard OperationTM4UCx#46Module Connection

 TM4 with new target UCx#46 was moved from TCS to ITW and has been re-connected right after. see attachment pls.

  2719   Thursday, November 21, 2024, 14:11 Frank Song5 Shielding BlocksStandard OperationTM4UCx#46shielding blocks transfer

 Shielding blocks have been moved from ITE to ITW and MAA is secured.

  2721   Tuesday, November 26, 2024, 13:03 Frank SongSouth Hot-CellStandard OperationTM3UCx#47electrical check/leak check

An electrical check and leak check had been done after new target UCx47 was installed on TM3 in SHC. see attachment pls.

  2725   Tuesday, December 03, 2024, 10:10 Frank SongITEStandard OperationTM2Ta#68module disconnection

TM2 with spent target TA#68 was disconnected  in ITE and is being moved to SHC. All water lines are purged for module storage.

  2729   Wednesday, December 04, 2024, 08:05 Frank SongITEStandard OperationTM3UCx#47Module Connection

TM3 with new target UCx#47 was connected in ITE right after be moved from TCS. 

  2735   Monday, December 09, 2024, 13:10 Frank Song5 Shielding BlocksStandard OperationTM3UCx#47shielding blocks transfer

 5 Shielding Blocks have been transferred from ITW to ITE. MAA is secured after moving.

  2740   Friday, January 03, 2025, 12:34 Frank Song5 Shielding BlocksMaintenance UCx#47shielding blocks moving

 Five shielding blocks are moved from ITE to storage area ( one of them is sitting on B2 as limit of room) for target stations maintenance in 2025 winter shut down .

  2741   Monday, January 06, 2025, 08:38 Frank SongITWStandard OperationTM4UCx#46module disconnection

 TM4 WITH UCx#46 was disconnected in 2025-01-02 in ITW. Forms attached.

  2747   Monday, January 13, 2025, 10:36 Frank SongITEStandard OperationTM3UCx#47module disconnection

 TM3 with spent target UCx#47 was disconnected in ITE and will be moved to SHC.

  2753   Wednesday, January 22, 2025, 10:29 Frank SongFaraday CageMaintenance  Annual clean up for ITE/ITW Faraday cages

 David and I cleaned both cages in ISAC1 electric room, all done.

  2787   Tuesday, April 01, 2025, 09:47 Frank SongNorth Hot-CellRepair  Two NHC light bulbs replacement

2 broken lights of NHC were replaced in Target Hall. see pics attached.

  2792   Thursday, April 24, 2025, 11:13 Frank SongNorth Hot-CellStandard OperationTM4UCx#48electrical check/leak check

 TM4 with new target UCx#48 installed was E/L checked on the top of NHC, see attachment uploaded with pls.

  2800   Tuesday, May 06, 2025, 09:18 Frank SongITEStandard OperationTM4UCx#48Module Connection

 TM4 with first target UC#48 of this year has been connected in ITE. see attachment please.

  2801   Tuesday, May 06, 2025, 14:40 Frank SongNorth Hot-CellStandard OperationTM2UC#49electrical check/leak check

 TM2 with new target UC#49 installed is E/L checked on the flange of NHC in TH. see attachment for detail.