ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1107   Tuesday, October 20, 2015, 10:18 Travis CaveITWStandard OperationTM2SiC#32Module movedTM#2 with SiC#32 has been moved from the
south hot cell to the west target station.
  
  1111   Wednesday, October 21, 2015, 11:58 Anders MjosSouth Hot-CellDevelopmentTM2ZrC#7Extraction Electrode inspectionThe failed extraction electrode was inspected
in the hot cell this morning by Anders and
Chad. The following electrical measurements
  
  1158   Thursday, February 25, 2016, 09:27 David WangITWStandard OperationTM2 TM2 has been disconnected in ITWTM2 has been disconnected in ITW (except
vacuum lines). The vacuum system is still
operating.
  
  1160   Wednesday, March 02, 2016, 09:51 David WangITWStandard OperationTM2 all water lines on TM2 and TM4 are purged.All water lines on TM2 and TM4 are purged
for upcoming water lines helium pressure
test.
  
  1161   Wednesday, March 02, 2016, 10:04 David WangITWStandard OperationTM2 Leak check on ITW and TM2.Dan and I leak checked TM2 and ITW primary
vacuum vessel. It was found a 1X E-7 atm.cc/sec
leak on top T flange seal between TM2 and
  
  1165   Monday, March 14, 2016, 15:22 David WangConditioning StationStandard OperationTM2 2016 Winter Shut Down Target Hall Scheduleupdate schedule according to change. See
attachment 1,2
 
 2016_winter_shut_down__target_hall_schedule.pdf2016_winter_shut_down__target_hall_schedule.mpp 
  1166   Wednesday, March 16, 2016, 09:20 Travis CaveITEStandard OperationTM2SiC#32module movedTM#2 with SiC#32 has been moved from the
west station to the south hot cell.
  
  1167   Wednesday, March 16, 2016, 14:23 chad fisherSouth Hot-CellStandard OperationTM2SiC#32SiC#32 removal Target Module InspectionSiC#32 has been removed from TM2. Quick
inspection shows some troubling discoloration
on the water cooled connection blocks of
 20160316_141127.jpg20160316_141146.jpg 
  1168   Thursday, March 17, 2016, 14:57 David WangSouth Hot-CellRepairTM2 TM2 first round leak check in SHCChad and I finished the first round check
on Tm2 water lines.  The lines and spots
checked are: Target oven + and - (front side
  
  1169   Friday, March 18, 2016, 08:34 Travis CaveConditioning StationStandard OperationTM2no targetmodule movedTM#2 with no target has been moved to the
conditioning station from the south hot cell.
  
  1170   Friday, March 18, 2016, 09:34 David WangConditioning StationStandard OperationTM2 Target Hall schedule for beam schedule 130 (Apr- Sep)I would like to post the spreadsheet of
target hall schedule for beam schedule 130(Apr
to Sep) first. The MS project of TH schedule
 Target_Hall_shedule_130_Apr_to_Sep_2016.xlsxTarget_Hall_shedule_130_Apr_to_Sep_2016.pdf 
  1171   Friday, March 18, 2016, 09:42 David WangConditioning StationStandard OperationTM2 TM2 vacuum sysytem has been connected at TCSTM2 vacuum system has been connected at
TCS. Started roughing pump. Everything is
good so far.
  
  1173   Friday, March 18, 2016, 13:13 Travis CaveConditioning StationStandard OperationTM2SiC#32Electrical CheckElectrical checks of the TM#2 with the
old SiC#32 and without the target. See attached
PDFs.
 TM2_SiC32_postbeam.PDFTM2_elec_chk_notgt_CS.PDF 
  1174   Monday, March 21, 2016, 10:25 David WangConditioning StationRepairTM2 TM2 Helium pressure Test Result in TCS and ITWTM2 has been helium pressure tested in
ITW and TCS. They are both tested with 70psi
helium, each circuit for 3minutes. 
  
  1175   Monday, March 21, 2016, 11:30 David WangConditioning StationRepairTM2 TM2 and TCS vacuum pumps are stoppedI stopped TM2 and TCS vacuum pumps. It
will be vented and disconnected this afternoon
for tomorrow  moving.   
  
  1176   Monday, March 21, 2016, 15:27 David WangConditioning StationRepairTM2 TM2 has been disconnected at TCSTM2 vacuum system has been disconnected
at TCS. Venting is in process now.
  
  1178   Wednesday, March 23, 2016, 11:00 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule movedTM#2 was moved into the south hot cell
by 08:30.
  
  1179   Wednesday, March 23, 2016, 11:32 David WangSouth Hot-CellRepairTM2 TM2 Helium spray leak check on GE and MSP lines at SHC  Chad and I did the helium spray
leak check on TM2 GE and MSP  water lines
at SHC this morning. We confirmed the GE
  
  1185   Wednesday, March 30, 2016, 15:49 David WangAssembly/Bench TestRepairTM2  TM2 Helium spray leak check on solder stems inside service cap on the top of SW silo.On each water circuit in side the service
cap, there are 4 soldering stems which two
of them are inside blue nylon insulator and
 7x 
  1208   Wednesday, April 13, 2016, 10:14 Travis CaveConditioning StationStandard OperationTM2no targetmodule movedTM#2 has been moved from the south west
silo to the conditioning station.
  