2645
|
Wednesday, July 24, 2024, 10:10 |
Frank Song | ITE/ITW/Storage Area | Standard Operation | | | shielding blocks transfer |
5 shielding blocks have been transferred from ITE to ITW. MAA is secured again after moving. |
2646
|
Tuesday, August 06, 2024, 09:16 |
Frank Song | ITE | Standard Operation | TM3 | SiC#46 | module disconnection |
TM3 with spent target SiC#46 was disconnected in ITE and ready to move to TCS soon. |
Attachment 1: TM3_with_SiC#46_disconnection_in_ITE_2024-08-0106.pdf
|
|
2649
|
Friday, August 09, 2024, 08:11 |
Frank Song | ITW | Standard Operation | TM4 | TiC#7 | module disconnection |
TM4 with spent target TiC#7 (dead) was disconnected in ITW and ready to move to TCS. |
Attachment 1: TM4_with_spent_TiC#7_disconnection_in_ITW_20240809.pdf
|
|
2650
|
Friday, August 09, 2024, 16:15 |
Frank Song | South Hot-Cell | Repair | TM3 | TiC#8 | electrical check/leak check |
TM3 with replaced target TiC#8 has been checked on SHC before moving to ITW. Pls see attachment |
Attachment 1: electrical_and_leak_check_of_TM3_with_new_target_TiC#8_replaced_at_SHC_20240809.pdf
|
|
2656
|
Tuesday, August 13, 2024, 08:39 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#67 | electrical check/leak check |
TM2 with new target Ta#67 had been electric/leak checked before moving to ITE. See attachment pls. |
Attachment 1: TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf
|
|
2657
|
Tuesday, August 13, 2024, 14:18 |
Frank Song | ITE | Standard Operation | TM2 | Ta#67 | Module Connection |
TM2 with new target Ta#67 was connected in ITE, all TP are running at their full speed now. |
Attachment 1: TM2_with_Ta#67_connection_in_ITE_20240813.pdf
|
|
2662
|
Friday, August 16, 2024, 13:29 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta#68 | electrical check/leak check |
New target Ta#68 is installed on TM4 and be leak/electric checked. Pls see attachment. |
Attachment 1: TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf
|
|
2666
|
Monday, August 19, 2024, 15:29 |
Frank Song | ITW/ITE | Standard Operation | TM2 | Ta#67 | shielding blocks transfer |
5 shielding blocks have been transferred from ITW to ITE, MAA has been secured after moving. |
2671
|
Tuesday, August 27, 2024, 13:30 |
Frank Song | ITW | Maintenance | TM3 | TiC#8 | module disconnection |
TM3 is disconnected and all water lines are purged/refilled with 50psi Nitrogen. Pls see pics attached with. |
Attachment 1: TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf
|
|
2677
|
Tuesday, September 10, 2024, 12:41 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | TiC#9 | electrical check/leak check |
TM4 with new target TiC#9 Surface installed in SHC was leak/electric checked before moving to TCS. See attached pic pls. |
Attachment 1: TM4_with_TiC#9_Surface_electric(leak)_cheak_on_SHC_2024-09-10.pdf
|
|
2684
|
Tuesday, September 17, 2024, 13:42 |
Frank Song | ITW | Standard Operation | TM4 | TiC#9 | Module Connection |
TM4 with target TiC#9 is connected in ITW. See attachment. |
Attachment 1: TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf
|
|
2691
|
Tuesday, September 24, 2024, 09:37 |
Frank Song | ITE/ITW | Standard Operation | | | shielding blocks transfer |
5 shielding blocks have been moved from ITE to ITW. |
2695
|
Tuesday, October 01, 2024, 09:16 |
Frank Song | ITE | Standard Operation | TM2 | Ta#67 | module disconnection |
TM2 with spent target Ta#67 was disconnected in ITE. see attachment pls. |
Attachment 1: TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf
|
|
2701
|
Wednesday, October 09, 2024, 14:04 |
Frank Song | ITE | Standard Operation | TM2 | Ta#68 | Module Connection |
TM2 with new target Ta#68 installed is connected in ITE. Pls see form attached. |
Attachment 1: TM2_with_new_target_Ta#68_connection_in_ITE.pdf
|
|
2706
|
Tuesday, October 15, 2024, 12:57 |
Frank Song | ITW/ITE | Standard Operation | | | shielding blocks transfer |
5 shielding blocks are transferred from ITW to ITE, Target Area is secured again after moving. |
2710
|
Tuesday, November 05, 2024, 09:49 |
Frank Song | ITW | Standard Operation | TM4 | TiC#9 | module disconnection |
TM4 with spent target TiC#9 was disconnected in 29-10-2024 and it is being moved from ITW to SHC. |
Attachment 1: TM4_with_spent_target_TiC#9_disconnection_in_ITW_20241029.pdf
|
|
2711
|
Tuesday, November 05, 2024, 11:04 |
Frank Song | South Hot-Cell | Standard Operation | | TiC#9 | electrical check with the spent target |
David made electrical check right after TM4 is moved from ITW to SHC. see attachment pls. |
Attachment 1: Electric_Check_of_TM4_with_spent_TiC#9.pdf
|
|
2717
|
Tuesday, November 12, 2024, 12:30 |
Frank Song | ITW | Standard Operation | TM4 | UCx#46 | Module Connection |
TM4 with new target UCx#46 was moved from TCS to ITW and has been re-connected right after. see attachment pls. |
Attachment 1: TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf
|
|
2719
|
Thursday, November 21, 2024, 14:11 |
Frank Song | 5 Shielding Blocks | Standard Operation | TM4 | UCx#46 | shielding blocks transfer |
Shielding blocks have been moved from ITE to ITW and MAA is secured. |
2721
|
Tuesday, November 26, 2024, 13:03 |
Frank Song | South Hot-Cell | Standard Operation | TM3 | UCx#47 | electrical check/leak check |
An electrical check and leak check had been done after new target UCx47 was installed on TM3 in SHC. see attachment pls. |
Attachment 1: TM3_with_new_target_UCx#47_electrical_check_on_SHC_2024-11-26.pdf
|
|