Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 64 of 141  Not logged in ELOG logo
ID Date Author Category Type Moduledown Target/Number Subject
  1099   Wednesday, October 14, 2015, 12:44 David WangITWStandard OperationTM2ZrC#7TM2 has been moved from ITW to SHC

Bill and I remotely removed TM2 from ITW to SHC. The move is smooth.

  1100   Wednesday, October 14, 2015, 12:48 David WangSouth Hot-CellStandard OperationTM2ZrC#7TM2 ZrC#7 after run electrical check at SHC.

I did an electrical check on TM2 with ZrC #7 on it. The EE is short to 60KV bias. See attachment

Attachment 1: ZrC_#7_after_run_electrical_check.pdf
ZrC_#7_after_run_electrical_check.pdf
  1101   Wednesday, October 14, 2015, 14:03 chad fisherSouth Hot-CellStandard OperationTM2ZrC#7ZrC#7 removed

ZrC#7 has been removed from TM2. Everything looks good.

Attachment 1: 20151014_134022.jpg
20151014_134022.jpg
Attachment 2: 20151014_135127.jpg
20151014_135127.jpg
  1102   Wednesday, October 14, 2015, 14:49 David WangSouth Hot-CellStandard OperationTM2 Install new high current cables to TM2

I installed a set of new high current cables for TM2 Febiad run. The top of TM2  is configured to Febiad mode. See attachments

Attachment 1: TM2_Febiad_High_current_cables_047.JPG
TM2_Febiad_High_current_cables_047.JPG
Attachment 2: TM2_Febiad_High_current_cables_048.JPG
TM2_Febiad_High_current_cables_048.JPG
Attachment 3: TM2_Febiad_High_current_cables_049.JPG
TM2_Febiad_High_current_cables_049.JPG
  1103   Thursday, October 15, 2015, 08:07 David WangSouth Hot-CellStandard OperationTM2no targetTM2 no target electrical check at SHC.

I did a TM2 no target electrical check at SHC this morning. A to RU at 500v  is 250K which is low.   anode- x pin is dead short to 60kv bias. RU is dead short to 60kv bias( as before).   see attachment

Attachment 1: TM2_electrical_check_2015-10-16_no_target.pdf
TM2_electrical_check_2015-10-16_no_target.pdf
  1104   Thursday, October 15, 2015, 14:17 chad fisherSouth Hot-CellRepairTM2 Anode Connector Install and adjustment

The TM2 containment box was removed this morning for installation of the 9 pin connector...connection.

The 9 pin connector copper tube connection was made and Anders advised on routing of the cable to the banana plug water block connection.

Short was diagnosed (short disappeared when water block was pushed slightly towards center of module) and thicker Ultem spacer installed and tested again. All good.

Attachment 1: 20151015_085914.jpg
20151015_085914.jpg
  1105   Monday, October 19, 2015, 11:53 chad fisherSouth Hot-CellStandard OperationTM2SiC#32SiC#32 installed on TM2

SiC#32 has been installed on TM2. High current fasteners torqued to 130 in lbs.

  1106   Monday, October 19, 2015, 15:52 Anders MjosSouth Hot-CellStandard OperationTM2SiC#32Electrical and leak check

 An electrical check was completed by Travis C and Anders M. Note ~250 kOhm between Target and 60 kV common. Leak check was done by Dan M and Chad F on HS and Window circuits. No leaks found

Attachment 1: ITW-TM2-SiC#32-HP-FEBIAD_Electrical_Check_SHC_(pre).pdf
ITW-TM2-SiC#32-HP-FEBIAD_Electrical_Check_SHC_(pre).pdf
  1107   Tuesday, October 20, 2015, 10:18 Travis CaveITWStandard OperationTM2SiC#32Module moved

TM#2 with SiC#32 has been moved from the south hot cell to the west target station.

  1111   Wednesday, October 21, 2015, 11:58 Anders MjosSouth Hot-CellDevelopmentTM2ZrC#7Extraction Electrode inspection

The failed extraction electrode was inspected in the hot cell this morning by Anders and Chad. The following electrical measurements were taken

  • EE on target assembly as recieved from TM after online operation. 14 Ohm
  • EE removed from target assembly and placed on conductive flat surface. ~1 G-Ohm at 1kV
  • EE installed back onto target assembly (fasteners not tightened).~ 0.8 G-Ohm at 1 kV

There was some material deposited on the EE. Some of which has fallen off - possibly during removal of the electrode from the target assembly. It seems the cause of the short was material build up between plasma electrode and extraction electrode. See photos.

The heat shield lid was removed after lunch. This revealed a broken target. The target may have broken after operation (in hot cell).

Photos are available on DocuShare

 

  1158   Thursday, February 25, 2016, 09:27 David WangITWStandard OperationTM2 TM2 has been disconnected in ITW

TM2 has been disconnected in ITW (except vacuum lines). The vacuum system is still operating.

  1160   Wednesday, March 02, 2016, 09:51 David WangITWStandard OperationTM2 all water lines on TM2 and TM4 are purged.

All water lines on TM2 and TM4 are purged for upcoming water lines helium pressure test.

  1161   Wednesday, March 02, 2016, 10:04 David WangITWStandard OperationTM2 Leak check on ITW and TM2.

Dan and I leak checked TM2 and ITW primary vacuum vessel. It was found a 1X E-7 atm.cc/sec leak on top T flange seal between TM2 and dump module in first time check. But it is not a repeatable leak. I checked the same spot and around area two more times with increased helium volume.It did not show up again. The first response could  be a helium drift to dry scroll pump. I will check it again later. The primar vacuum vessel on ITW and TM2 are leak free. 

Dan and I found a small  leak on ITW dump module  top flange seal. The leak detector got a response  to 7xE-9 atm.cc/sec when I spray the helium to west side of dump module top flange. We tested again, and got same result. The o-ring which seals ITW dump module top flange is deteriorating. It need to be replaced at a proper time. This is the only air to vacuum leak we confirm so far on primary and secondary vacuum vessel on TM2 and ITW. The module and station no other air to vacuum leak.

The TM2 water lines helium pressure tested started in ITW. The helium pressure 70psi. The result so far is: Window: good, GE: huge leak directly shoot over E-7 atm.cc/sec( need to be confirmed tomorrow), HS: good, EE: good, MSP: tiny leak which is response to 3-4xE-9 atm.cc/sec. Coil 1 : small leak which is response to 1.3XE-8 atm.cc/sec. Tomorrow, We will test the rest water lines on TM2which are TA+, TA-, Tube+, Tube-, and coil 2. And We will confirm the GE huge leak at the last.

Finished the helium pressure test on TM2 water line.70 psi helium, The result of the rests 5 circuits: coil 1: leak 7.2xE-8atm.cc/sec,Ta(+): small leak 1.7XE-8 atm.cc/sec, Ta(-) small leak 8.7xE-9atm.cc/sec,Tube(-) 1.5 x E-8 atm.cc/sec. Tube(+)small leak 3.7xE-8 atm.cc/sec.    We repeated the helium pressure test on GE. There is a huge leak on TM2 GE circuit. The leak detector shoot up to E-7  atm.cc/sec right after the helium was applied.It went up to E-6 range in less than 1 minutes.

 

 

  1165   Monday, March 14, 2016, 15:22 David WangConditioning StationStandard OperationTM2 2016 Winter Shut Down Target Hall Schedule

update schedule according to change. See attachment 1,2

 

Attachment 1: 2016_winter_shut_down__target_hall_schedule.pdf
2016_winter_shut_down__target_hall_schedule.pdf
Attachment 2: 2016_winter_shut_down__target_hall_schedule.mpp
  1166   Wednesday, March 16, 2016, 09:20 Travis CaveITEStandard OperationTM2SiC#32module moved

TM#2 with SiC#32 has been moved from the west station to the south hot cell.

  1167   Wednesday, March 16, 2016, 14:23 chad fisherSouth Hot-CellStandard OperationTM2SiC#32SiC#32 removal Target Module Inspection

SiC#32 has been removed from TM2. Quick inspection shows some troubling discoloration on the water cooled connection blocks of C and D as well as the left target heater A.

As for the target, both legs are broken and is has the normal "charge up" marks on the 9 pin connector.

Attachment 1: 20160316_141127.jpg
20160316_141127.jpg
Attachment 2: 20160316_141146.jpg
20160316_141146.jpg
  1168   Thursday, March 17, 2016, 14:57 David WangSouth Hot-CellRepairTM2 TM2 first round leak check in SHC

Chad and I finished the first round check on Tm2 water lines. The lines and spots checked are: Target oven + and - (front side braze joints) , Tube heater+and -(front side braze joints and water blocks), coil2 and coil 1(front side braze joints and area close to water blocks),. No leak has been found on all above of them.  The last, we checked   the GE which has the biggest leak so far. The leak detector base leak rate only can get to 4XE-9 atm.cc/sec. Chad sprayed helium very close to GE water block, and I got a quick response on leak detector. The leak rate climbed from 4Xe-9 atm.cc/sec to 1.4 atm.cc/sec. We confirmed the GE is leaking now. The exact location need to be pinpointed later once the containment box is out after the module is back to SHC. The module will be moved to TCS tomorrow morning and pressurized again there. Anders will use RGA to monitor the helium response during the check.  

  1169   Friday, March 18, 2016, 08:34 Travis CaveConditioning StationStandard OperationTM2no targetmodule moved

TM#2 with no target has been moved to the conditioning station from the south hot cell.

  1170   Friday, March 18, 2016, 09:34 David WangConditioning StationStandard OperationTM2 Target Hall schedule for beam schedule 130 (Apr- Sep)

I would like to post the spreadsheet of target hall schedule for beam schedule 130(Apr to Sep) first. The MS project of TH schedule for  beam schedule 130 is under construction, and will be posted later.

Attachment 1: Target_Hall_shedule_130_Apr_to_Sep_2016.xlsx
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep_2016.pdf
Target_Hall_shedule_130_Apr_to_Sep_2016.pdf
  1171   Friday, March 18, 2016, 09:42 David WangConditioning StationStandard OperationTM2 TM2 vacuum sysytem has been connected at TCS

TM2 vacuum system has been connected at TCS. Started roughing pump. Everything is good so far.

ELOG V2.9.2-2455