1052
|
Wednesday, August 26, 2015, 14:30 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | TM2 and Cs vacuum sysyem has been connected at CS. | Turbo-pumps are started . The pumping down
is good so far. |
|
|
1053
|
Wednesday, August 26, 2015, 14:52 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | Helium pressure test on TM2 HS and window lines at CS | LD base LR 0.0xE-9 atm.cc/sec , 80 psi
helium 2 minutes on HS and window circuits.
No leak. Also, the reinstalled(after rewiring |
|
|
1054
|
Thursday, August 27, 2015, 08:43 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | ZrC #7 | Electrical Check | Electrical check of TM#2 at the conditioning
station under vacuum. The resistance value
of the target to 60kV common is a bit lower |
|
|
1055
|
Thursday, August 27, 2015, 10:10 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | ZrC#7 | Conditioning new Source Tray | Thursday, August 27, 2015, 10:10: Started
water system. TK2 level reduced from 24.9
to 23.5 in. |
|
|
1056
|
Tuesday, September 01, 2015, 06:25 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | Argon venting TM2 at CS | Argon venting TM2 at CS. |
|
|
1057
|
Tuesday, September 01, 2015, 10:32 |
Travis Cave | ITW | Standard Operation | TM2 | ZrC #7 | Module moved | TM#2 with ZrC#7 has been moved from the
conditioning station to the west target
station. |
|
|
1058
|
Tuesday, September 01, 2015, 10:38 |
David Wang | ITW | Maintenance | TM2 | | ITW top tank flange clean up and r-ring replacement. | During last run, ITW dump circuit
had a water leak on an adaptor below the
pressure gauge. The top tank flange, slot, |
|
|
1059
|
Tuesday, September 01, 2015, 14:54 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connectec in ITW. | TM2 has been connected in ITW. During the
connection, Anders and I found the
TM2 high current cables used in ITE |
|
|
1060
|
Tuesday, September 01, 2015, 16:03 |
Grant Minor | ITW | Standard Operation | TM2 | ZrC #7 | Photos of TM2 Connection Procedure on Docushare 1Sept2015 | https://documents.triumf.ca/docushare/dsweb/View/Collection-15323 |
|
|
1063
|
Tuesday, September 08, 2015, 10:11 |
David Wang | ITW | Standard Operation | TM2 | ZrC | 5 Shielding blocks have been transferred from ITE to ITW. | Maico and Dan moved 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam. |
|
|
1067
|
Friday, September 11, 2015, 14:31 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | ZrC#7 | Vacuum gauge and EPICS read back calibration | The corelation betwenn the local value
on the gauge controllers and the read back
valiues in EPICS was compared. Data can be |
|
|
1098
|
Wednesday, October 14, 2015, 12:42 |
David Wang | ITW | Standard Operation | TM2 | ZrC#7 | TM2 has been disconnected in ITW | Dan and I disconnected TM2 in ITW this
morning. |
|
|
1099
|
Wednesday, October 14, 2015, 12:44 |
David Wang | ITW | Standard Operation | TM2 | ZrC#7 | TM2 has been moved from ITW to SHC | Bill and I remotely removed TM2 from ITW
to SHC. The move is smooth. |
|
|
1100
|
Wednesday, October 14, 2015, 12:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | ZrC#7 | TM2 ZrC#7 after run electrical check at SHC. | I did an electrical check on TM2 with ZrC
#7 on it. The EE is short to 60KV bias. See
attachment |
|
|
1101
|
Wednesday, October 14, 2015, 14:03 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | ZrC#7 | ZrC#7 removed | ZrC#7 has been removed from TM2. Everything
looks good. |
|
|
1102
|
Wednesday, October 14, 2015, 14:49 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | Install new high current cables to TM2 | I installed a set of new high current cables
for TM2 Febiad run. The top of TM2
is configured to Febiad mode. See attachments |
|
|
1103
|
Thursday, October 15, 2015, 08:07 |
David Wang | South Hot-Cell | Standard Operation | TM2 | no target | TM2 no target electrical check at SHC. | I did a TM2 no target electrical check
at SHC this morning. A to RU at 500v
is 250K which is low. anode- |
|
|
1104
|
Thursday, October 15, 2015, 14:17 |
chad fisher | South Hot-Cell | Repair | TM2 | | Anode Connector Install and adjustment | The TM2 containment box was removed this
morning for installation of the 9 pin connector...connection.
The 9 pin connector copper tube connection |
|
|
1105
|
Monday, October 19, 2015, 11:53 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#32 | SiC#32 installed on TM2 | SiC#32 has been installed on TM2. High
current fasteners torqued to 130 in lbs. |
|
|
1106
|
Monday, October 19, 2015, 15:52 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | SiC#32 | Electrical and leak check | An electrical check was completed
by Travis C and Anders M. Note ~250 kOhm
between Target and 60 kV common. Leak check |
|