Entry  Tuesday, November 07, 2023, 13:42, Frank Song, South Hot-Cell, Standard Operation, TM4, Ta#65, electrical check with the spent target TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
TM4 with spent target Ta#65 was electrical checked right after being moved to SHC. 
Entry  Tuesday, November 07, 2023, 13:55, Frank Song, ITE, Standard Operation, TM4, Ta#65, module disconnection TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf
TM4 with spent target Ta#65 was disconnected in ITE and moved to SHC.
Entry  Wednesday, November 08, 2023, 12:14, Frank Song, South Hot-Cell, Standard Operation, TM4, UCx#43, electrical check/leak check TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf
 TM4 with new target UCx#43 was electrical and leak checked on SHC.
Entry  Monday, January 22, 2024, 14:12, Frank Song, ITE, Standard Operation, TM4, UCx#43, module disconnection TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf
 TM4 with spent target UCx#43 was disconnected in ITE and is ready moved to SHC. see attachment pls.
Entry  Tuesday, April 30, 2024, 08:00, Frank Song, South Hot-Cell, Standard Operation, TM4, Lp-Febiad empty, electrical check/leak check TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf
 David Wang made E/L checking before module moving to ITW. read attachment pls.
Entry  Wednesday, May 08, 2024, 14:01, Frank Song, ITW, Maintenance, , , Annual clean up for ITW Faraday cage  
The ITW Faraday Cage has been cleaned, this is part of Winter Shut Down job happens in ISAC-1 Electric maintenance room annually.
Entry  Thursday, May 23, 2024, 10:59, Frank Song, ITE, Standard Operation, TM3, UCx#44, shielding blocks transfer 
 the five shielding blocks have been moved from storage area to ITE and is ready for beam delivery.
submitted WP# I2024-05-22--1
actived  WP # I2024-05-23-4
Entry  Tuesday, May 28, 2024, 13:49, Frank Song, ITW, Standard Operation, TM4, UCx#45, Module Connection TM4_with_UCx#45_connection_in_ITW_20240528.pdf
 TM4 with new target UCx#45 was connected in ITW this morning. pls see attachment uploaded with.
Entry  Monday, June 10, 2024, 11:02, Frank Song, ITW, Standard Operation, TM4, UCx#45, shielding blocks transfer 
 5 shielding blocks have been transferred from ITE to ITW. 
Doc # 181007
 
Entry  Friday, June 14, 2024, 11:18, Frank Song, ITE, Standard Operation, TM3, UCx#44, module disconnection TM3_with_UCx#44_disconnection_in_ITE_2024-06-14.pdf
 TM3 with target UCx#44 was disconnected in ITE. 
Entry  Tuesday, June 25, 2024, 12:49, Frank Song, ITE, Standard Operation, TM3, SiC#46, Module Connection TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf
 TM3 with new target SiC#46 was connected in ITE.
Entry  Tuesday, July 02, 2024, 11:38, Frank Song, ITE/ITW/Storage Area, Standard Operation, , , shielding blocks transfer 
 5 shielding blocks have been moved from ITW to ITE, MAA area has been secured.
Entry  Thursday, July 04, 2024, 11:45, Frank Song, ITW, Standard Operation, TM4, UCx#45, module disconnection TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf
TM4 with spent target UCx#45 was disconnected in ITW and moved to SHC.
 TM4 move from ITW to SHC is smooth. 
Entry  Tuesday, July 16, 2024, 13:14, Frank Song, ITW, Standard Operation, TM4, TiC#7, Module Connection TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdfMicrosoftTeams-image_(65).png
 TM4 with TiC#7 was connected in ITW, all TPs are running at full speed.
Entry  Wednesday, July 24, 2024, 10:10, Frank Song, ITE/ITW/Storage Area, Standard Operation, , , shielding blocks transfer 
 5 shielding blocks have been transferred from ITE to ITW. MAA is secured again after moving.
Entry  Tuesday, August 06, 2024, 09:16, Frank Song, ITE, Standard Operation, TM3, SiC#46, module disconnection TM3_with_SiC#46_disconnection_in_ITE_2024-08-0106.pdf
 TM3 with spent target SiC#46 was disconnected in ITE and ready to move to TCS soon.
Entry  Friday, August 09, 2024, 08:11, Frank Song, ITW, Standard Operation, TM4, TiC#7, module disconnection TM4_with_spent_TiC#7_disconnection_in_ITW_20240809.pdf
 TM4 with spent target TiC#7 (dead) was disconnected in ITW and ready to move to TCS.
Entry  Friday, August 09, 2024, 16:15, Frank Song, South Hot-Cell, Repair, TM3, TiC#8, electrical check/leak check electrical_and_leak_check_of_TM3_with_new_target_TiC#8_replaced_at_SHC_20240809.pdf
 TM3 with replaced target TiC#8 has been checked on SHC before moving to ITW. Pls see attachment
Entry  Tuesday, August 13, 2024, 08:39, Frank Song, South Hot-Cell, Standard Operation, TM2, Ta#67, electrical check/leak check TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf
 TM2 with new target Ta#67 had been electric/leak checked before moving to ITE. See attachment pls.
Entry  Tuesday, August 13, 2024, 14:18, Frank Song, ITE, Standard Operation, TM2, Ta#67, Module Connection TM2_with_Ta#67_connection_in_ITE_20240813.pdf
 TM2 with new target Ta#67 was connected in ITE, all TP are running at their full speed now.