  1509   Wednesday, April 26, 2017, 17:37 Aurelia LaxdalSouth Hot-CellRepairTM3no targetTM3 HV tests at atmosphere Pictures from April 19-21, 2017


Please see the first two pictures of the HV test at atmosphere done on April 19.

First picture shows a big spark between the Extraction Electrode mounting plate holder (at HV) to the Ground Electrode. Please note minimum gap between these electrodes is 7.8mm.

However the biggest visible spark was noticed at the bottom screw hole. (It is difficult to determine if at the 7.8mm gap were concomitant sparks occurring.)This spark started at 22kV and became stable above 24kV.

On April 20, 2017 Chad inspected this area with the Hot Cell camera and found a spark mark on the Extraction Electrode holder plate at the bottom screw hole. See the third picture.

Again it is very difficult with the existing Hot Cell cameras to inspect the areas where the gap is small (at 7.8mm gap between the conical surfaces of the Ground Electrode and Extraction Electrode holder)

In the second picture there are 2 small sparks: one on the top and another one on the right side at the lines wrapped in Fiber Glass. These sparks started at 20kV.

On April 21 the HV test was repeated with the Containment box ON and the sparks occurred again, at the same locations and at the same voltage.

Attachment 1: DSC_0950.JPG
DSC_0950.JPG
Attachment 2: DSC_0899.JPG
DSC_0899.JPG
Attachment 3: SparkMarkEETM3.jpg
SparkMarkEETM3.jpg
  1508   Wednesday, April 26, 2017, 16:52 Aurelia LaxdalSouth Hot-CellRepairTM3 TM3 Lower Service Tray Video Inspection

chad fisher wrote:

A video inspection of the lower service tray was performed this morning. Camera was inserted upwards into the service tray/service chase from the containment box. One potential spark mark was identified as well as epoxy not flush with insulator. Fiberglass does not extend into service tray/chase much and does not look, from initial inspection that it will be too difficult to remove.

Video can be found in docushare Document-142295

 The attached picture is from the video: showing the fiber glass inside the Service Tray.

Attachment 1: FiberGlassInST.tiff
  1507   Wednesday, April 26, 2017, 13:35 chad fisherSouth Hot-CellRepairTM3 TM3 containment box removed

the containment box has been removed from TM3.

  1506   Wednesday, April 26, 2017, 10:40 Travis CaveSouth Hot-CellStandard OperationTM3no targetModule move

 TM#3 has been moved from the north east silo to the south hot cell.

  1505   Wednesday, April 26, 2017, 10:24 David WangITWStandard OperationTM2 TM2 ITW

TM2 was moved and connected in ITW yesterday afternoon. After roughing down, ITW turbo pumps are started. ITW TP4 can not be started to full speed. ISAC ops kept it at low speed mode with less than 1.0A current draw on pump. ITW IG1s shows red as well. I will take a look on them today when beam is off.

 

  1504   Wednesday, April 26, 2017, 08:28 chad fisherSouth Hot-CellRepairTM3 TM3 progress and manipulators

containment box was re-installed onto TM3 on Monday, Left manipulator may be showing signs of eminent handle or tong cable failure.

  1503   Tuesday, April 25, 2017, 19:35 Grant MinorCraneRepair  ISAC Target Hall Crane - West Hoist Brake Rattle

Below is a report on the ISAC Target Hall crane brake issue observed yesterday and addressed today:

 

- On April 13th, both the East and West hoist brake assemblies were replaced by Gordon Crane & Hoist, after David observed a burning smell

- The East assembly was replaced with a completely new brake assembly from Kone crane

- The West assembly was replaced with a refurbished assembly, which used the East assembly housing fitted with a rebuild kit by Gordon Crane

 

- Yesterday while preparing TM3 for a lift, David noticed a vibration / rattle sound coming from the West hoist brake

- This issue was only observed when starting the hoist from a complete stop, at the slowest possible upwards hoist speed

- Once the hoist speed increased, the sound went away, even after returning to a slower speed

 

- Tom from Gordon Crane & Hoist came in this morning at 7am and replaced the new West assembly with the original West assembly, which had at that point also been fitted with a rebuild kit at Gordon Crane’s shop

- Tom also inspected the East brake assembly again

- Tom commented that he had issues setting the right gap between the friction plates and the brake rotor – too close and the brake would not release properly, too far and the brake rattle issue would be observed

- He also commented that during this most recent repair of the West brake, he applied never seize to the shaft and spline to ensure that this friction point was not an issue

 

- After Tom finished his repair and inspection of the brakes, David attempted a test lift of an SEG block (10 ton) at the slowest lift speed

- The rattle noise coming from the West brake was still observed

- Travis also tested the slowest speed in Remote Test mode from the control room, with David and Grant present in the Target Hall, the rattle was also still observed

 

- Tom advised that the rattle would not affect the safety of the hoist, and no damage would be done to the brake assemblies by running the hoist normally with the rattle noise

- Tom ensured that he would consult with Aiden and they would likely order a brand new West brake assembly from Kone

- Tom called Aiden Gordon to confirm that it was ok to proceed

- Aiden called me around 1:30pm and left a message that the slow speed rattle sound was benign and that we could proceed with normal operations, but he would definitely address the problem moving forward, and we should standby for his report

 

Photos and video have been uploaded to Docushare.  The hoist noise before the repair and after the repair during the test lifts can be heard in the videos.

 

https://documents.triumf.ca/docushare/dsweb/View/Collection-19812

 

Thanks and regards,

 

Grant

 

--

Grant Minor, M.A.Sc., P.Eng.

TRIUMF Remote Handling Group Leader

Nuclear Engineer

4004 Wesbrook Mall, Vancouver

BC, Canada, V6T2A3

gminor@triumf.ca

(604) 222-7359

http://www.triumf.ca/profiles/4557

  1502   Monday, April 24, 2017, 16:11 David WangConditioning StationStandard OperationTM2 TCS TP1s is restarted.

TCS IG1S  is switched on as well. The reason to start the pump is to prepare a possible extended TM2 conditioning at TCS caused by TH crane issue. TCS:TP1 and TP2 are not switched on for this.

  1501   Monday, April 24, 2017, 16:06 David WangSouth Hot-CellRepairTM2 Crane main hoist strane noise when lifting up TM2

 When lifting up TM2 (20000lbs) this afternoon, TH crane has a strange noise on main hoist. The module was lift up less than 1 feet.when strange sound was noticed.  The module move was stopped right away,and module  was lowed back to SHC. The strange noise was confirmed later with SEG block six inches lifting up. Gordon crane technician will be here to tomorrow morning to investigate the problem.

  1500   Monday, April 24, 2017, 09:52 David WangConditioning StationStandard OperationTM2 Switch off TCS water system and vacuums

The TCS bias was turn off before that. The TM2 and TCS are still under vacuum now.

  1499   Friday, April 21, 2017, 08:19 David WangConditioning StationRepair  Low frequency on TCS TGHT flow sensor.

Anders and I found a low frequency issue(13hz only) on TCS TGHT flow sensor when doing TM4 conditioning. By trouble shooting, We found the module water lines are good. the restriction cause this problem in on TCS supply or return water lines to TGHT.  I switched TGHT lines with MSP water lines. The wheel frequency on TGHT is 67.0hz which is pretty high. Now, MSP is using the original TGHT water line(flow sensor frequency 13hz). Flow sensors and thermocouples are switched as well so no control system change is needed on epic page. Everything are re-labeled in TH.  With less brazing joints closing to heater source, the MSP line should be ok. By further troubleshooting this issue, I think the problem on this low flow sensor frequency problem is on those 1/2" Parker gray water lines inside that big  6" white pipe.  See attachments. The lines are are twisted, and could be squeezed in my view. Since everything is enclosed in that big pipe, It is hard to tell where the lines are squeezed and cause this restriction. Comparing to an open guide chase, this round pipe makes everything  difficult. Hard to trouble shooting , hard to remove lines or add new lines. It only looks beautiful. I tried all I can do, But, I have no quick solution to solve this problem permanently.  Maybe, Rob walker and his technicians has better skill or more strength on removing old lines, or adding new lines to solve the problem. 

Attachment 1: TCS_water_lines_001.JPG
TCS_water_lines_001.JPG
Attachment 2: TCS_water_lines_002.JPG
TCS_water_lines_002.JPG
Attachment 3: TCS_water_lines_003.JPG
TCS_water_lines_003.JPG
  1498   Wednesday, April 19, 2017, 08:29 David WangConditioning StationStandard Operation  TH schedule 132 update in first beam week

Update schedule to show job process in TH. See attachment 1,2.

Attachment 1: Target_Hall_shedule_132_Apr_to_Sep.pdf
Target_Hall_shedule_132_Apr_to_Sep.pdf
Attachment 2: Target_Hall_shedule_132_Apr_to_Sep.mpp
  1497   Thursday, April 13, 2017, 14:16 David WangCraneRepair  TH crane: east side main hoist brake assembly is replaced.

Gordon Crane technician Tom Kauss finished the replacement of the east side main hoist brake assembly. A new set up is installed. he adjusted gap too close during first time try. So, the smell appeared when operate the brake. He increased the gap to a proper distance then. It looks like everything works fine now. Still, The brake need to be tested with 10K lBS load on it. We will do the load test on next Thursday when he come here to replace west side brake assembly.  Before that, No module move or other heavy lifting action should be fulfilled on TH crane.

2017-04-20. Tom Kauss finished the replacement of west side main hoist brake assembly. The old set up will be rebuilt, and stored as spare for the future. The load test is done.  10k lbs load was used for testing. Brakes work fine. No strange noise and smell has been found during the test. 

  1496   Thursday, April 13, 2017, 11:44 Anders MjosConditioning StationStandard OperationTM2Ta#51Conditioning Ta#51

 Thursday, April 13, 2017, 11:43: Water package started.

  1495   Thursday, April 13, 2017, 11:33 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 water llines at TCS.

LD  BLR :0.0 X E-9 atm.cc/sec. BP:0.0XE-4 torr. helium 70 psi. 3 minutes on each circuit

HS 1.8XE-7 ATM.CC/SEC
TA+ 1.4 XE-7
TA- 4.3XE-8
TUBE+ 1.0XE-7
TUBE- 5.9XE-8
COIL 1 2.2XE-9
COIL 2 0.0XE-9
EE 0.0XE-9
MSP 8.8XE-8
ALL TOGETHER 6.7XE-7
ALL TOGETHER WITHOUT HS 4.7XE-7

There is a smallleak HS which we did not see before. The HS is checked in SHC  with helium spray yesterday. We did not see the leak . We checked this HS line every time when new target was installed. So mostly, this small leak is from VCRs connected to new target. But, we can not confirm it.  Still this line will be checked on next new target. We should have a better understanding when checking next time.  Other line are almost same as we checked in last year November. I did not see essential change.

  1494   Thursday, April 13, 2017, 10:32 chad fisherSouth Hot-CellRepairTM3 TM3 Lower Service Tray Video Inspection

A video inspection of the lower service tray was performed this morning. Camera was inserted upwards into the service tray/service chase from the containment box. One potential spark mark was identified as well as epoxy not flush with insulator. Fiberglass does not extend into service tray/chase much and does not look, from initial inspection that it will be too difficult to remove.

Video can be found in docushare Document-142295

  1493   Wednesday, April 12, 2017, 16:39 Aurelia LaxdalSouth Hot-CellRepairTM3no targetTM3 Inspection at the South Hot Cell

Found spark signs on TM3's containment on the side of the water blocks. They may be OLD or/and NEW sparking signs, but this in not determined at this moment. Please see picture: first attachment. First and second attachment show the profiles of water block and HV lines.

Attachment 1: DSC_0886.JPG
DSC_0886.JPG
Attachment 2: DSC_0883.JPG
DSC_0883.JPG
  1492   Wednesday, April 12, 2017, 13:03 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical Check

Electrical check of TM#3 with no target at the south hot cell

Attachment 1: TM3_elec_chk_no_tgt.PDF
TM3_elec_chk_no_tgt.PDF
  1491   Wednesday, April 12, 2017, 12:51 David WangSouth Hot-CellRepairTM3 TM3 Ram readings @ SHC

 We have a ram installed on SHC pole which is 0.5 meter to  module shielding block surface. the readings we got today during TM3 move:
at containment box center (highest reading): 3.14 msv/hr.
at bottom  of shielding blocks: 960 usv/hr.
at 1/4  of  shielding blocks height from  bottom :700usv/hr.
at 1/2 of shielding blocks height from bottom: 340usv/hr.
at 3/4 of shielding blocks height from bottom:140u/sv/hr.
   The Ram is behind the pole and measured the surface which is 90 degree right side of that opened service tray side. 

  1490   Wednesday, April 12, 2017, 09:20 Travis CaveSouth Hot-CellRepairTM3no targetModule move

 TM#3 is now in the south hot cell.