202
|
Tuesday, November 06, 2012, 11:06 |
Travis Cave | ITW | Standard Operation | TM1 | Nb#7 | module move | TM#1 with Nb#7 has been moved from the
west target station to the south hot cell
move went well. |
|
204
|
Tuesday, November 06, 2012, 12:08 |
David Wang | ITW | Standard Operation | TM1 | Nb#7 | TM1 disconnected in ITW | Bevan and I disconnected TM1 in ITW this
morning. The TM1 was moved to south hot cell
later. |
|
210
|
Thursday, November 08, 2012, 09:37 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Nb#7 Autopsy | Nb#7 was dismantled and ready for inspection. |
|
212
|
Friday, November 09, 2012, 14:35 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#7 | Spent target move | Nb#7 was moved from the south hot cell
to the target storage vault. The target was
placed in pail #103 in slot 6A of the vault |
|
86
|
Tuesday, April 17, 2012, 10:15 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Nb#6 | Target inserted into south hot cell | Nb#6 has been inserted into the south hot
cell in preparation for ionstallation onto
TM1. During the pre-insertion inspection |
|
88
|
Thursday, April 19, 2012, 09:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Nb#6 | Electrical check | Electrical check has been completed of
TM#1 with Nb#6 attached. Our new micro-ohm
meter was also used for the first time for |
|
90
|
Friday, April 20, 2012, 14:07 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Nb#6 | module move | TM#1 with Nb#6 is now in the conditioning
station. The fields of the module at the
south cell was 15.8mSv/hr. The move was uneventful. |
|
92
|
Tuesday, April 24, 2012, 10:02 |
Travis Cave | ITW | Standard Operation | TM1 | Nb#6 | module move | TM#1 with Nb#6 from the conditioning station
to the west target station, move was uneventful.
Mike LaRoss was there today for move in place |
|
93
|
Tuesday, April 24, 2012, 10:36 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Nb#6 | HV test April 23 | A HV test was complete on TM1 with
Friedhelm, David, and Myself. The module
behaved as it has in other tests. The vacuum |
|
116
|
Tuesday, June 05, 2012, 15:06 |
Bevan Moss | ITW | Standard Operation | TM1 | Nb#6 | Module move from ITW to SHC | TM1 has been moved from ITW to the
SHC. The move did encounter some issues,
one of the railings for preventing people |
|
122
|
Friday, June 08, 2012, 15:00 |
Don Jackson | South Hot-Cell | Standard Operation | TM1 | Nb#6 | Electrical Check Nb#6 at end of run | Megger check values were low but still
within operational range. |
|
124
|
Monday, June 11, 2012, 10:52 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#6 | Spent target move | The Nb#6 target has been moved from the
south hot cell into storage. It was place
in pail #95 and is in slot 5C of the vault. |
|
2165
|
Wednesday, November 18, 2020, 15:28 |
David Wang | South Hot-Cell | Standard Operation | TM2 | Nb#6 | electrical check and HS leak check. | Everything looks good. A still short to
P before target installation. We will float
P,Q as before on module top. |
|
2166
|
Thursday, November 19, 2020, 09:00 |
David Wang | Conditioning Station | Standard Operation | TM2 | Nb#6 | Helium pressure check on TM2 HS line at TCS. | LD 0.0 Xe-9 atm.cc/sec , 70 psi helium
3 minutes. No leak. |
|
2480
|
Monday, August 28, 2023, 12:16 |
Frank Song | North Hot-Cell | Repair | TM2 | Nb#11 | electric/leak check | TM2 with new target Nb#11 has been
E/L checked sitting on NHC. |
|
2481
|
Tuesday, August 29, 2023, 09:07 |
Frank Song | ITW | Repair | TM2 | Nb#11 | electrical check | TM2 with new target Nb#11 replaced
has been electric checked one more time in
ITW. |
|
2482
|
Tuesday, August 29, 2023, 09:28 |
Frank Song | ITW | Repair | TM2 | Nb#11 | Module Connection | Module was connected yesterday and
all turbo pumps are running at their top
speed. |
|
2490
|
Tuesday, October 03, 2023, 07:56 |
Frank Song | ITW | Standard Operation | TM2 | Nb#11 | module disconnection | TM2 with target Nb#11 has been disconneted
in ITW. The HS line was purged with Nitrogen
in station. |
|
2491
|
Tuesday, October 03, 2023, 14:28 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Nb#11 | electrical check | An electric checked right after TM2
was moved from ITW. |
|
2494
|
Friday, October 06, 2023, 10:47 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#11 | Spent Target Move | The spent Nb#11 target was removed
from the south hot cell and place in the
spent target vault. It was placed in pail |
|