  2355   Wednesday, August 10, 2022, 08:10 Frank SongNorth Hot-CellStandard OperationTM4Sic#44electrical and leak check

 TM4 with Sic#44 installed and had an electrical / leak check at NHC. 

Attachment 1: TM4_with_Sic#44_eletrical_and_leak_check.jpg
TM4_with_Sic#44_eletrical_and_leak_check.jpg
  2362   Tuesday, September 06, 2022, 14:05 Frank SongNorth Hot-CellStandard OperationTM2UCx#38electrical check after disconnection

 An electrical was done on the NHC for TM2 with spent Target UCx#38 on

Attachment 1: TM2_electrical_check_on_NHC_with_spent_UCx38_on.png
TM2_electrical_check_on_NHC_with_spent_UCx38_on.png
  2363   Thursday, September 08, 2022, 07:20 Frank SongNorth Hot-CellStandard OperationTM2UCx#39electrical check

 An electrical check was done on NHC yesterday.

Attachment 1: TM2_with_UCx#39_E_Check.png
TM2_with_UCx#39_E_Check.png
  2368   Wednesday, September 28, 2022, 12:58 Matthew GareauNorth Hot-CellRepair  Chad repaired the right operator side manipulator

On 26/Sept/2022

Chad disassembled the right operator side manipulator, and noticed that gears in the handle were quite tight especially when compared to the left operator side manipulator. 

Once a dry grease was added, and the handle reassembled all seemed to be in working order.

There was noticeable wear on a shaft and Chad has suggested to order some spare parts for the wrist and handle. 

Attachment 1: IMG_20220926_091024~2.jpg
IMG_20220926_091024~2.jpg
Attachment 2: IMG_20220926_091040.jpg
IMG_20220926_091040.jpg
Attachment 3: IMG_20220926_091047.jpg
IMG_20220926_091047.jpg
Attachment 4: IMG_20220926_091153.jpg
IMG_20220926_091153.jpg
  2369   Wednesday, September 28, 2022, 13:15 Matthew GareauNorth Hot-CellMaintenance  topped up the NHC window oil through the oil expansion tank

Myself and Maico were able to top up the NHC window oil.

The oil was filled through the expansion tank

- the Nitrogen line closed and the Nitrogen pressure valve was disconnected to ensure that no oil would go in to them.

- the pressure relief valve was disconnected to act as an air bleed line while we filled the oil

- with a funnel we slowly added the oil until the oil level could be read, showing about half full

- about 1.5 liters of oil were added

- once filled the Nitrogen line was reattached and the pressure was returned to recommended level 

- the remaining oil was returned the RH shop

Now the oil level will be monitored, which will help identify if there is any leak in the system.

Attachment 1: IMG_20220928_121000.jpg
IMG_20220928_121000.jpg
Attachment 2: IMG_20220928_124253.jpg
IMG_20220928_124253.jpg
Attachment 3: IMG_20220928_124258.jpg
IMG_20220928_124258.jpg
  2372   Monday, October 03, 2022, 14:58 Matthew GareauNorth Hot-CellRepairTM4SiC#43 and C#4Loose multipin guide pin

 Today while I was removing the SiC#43 it was noticed that the multipin guide pin was loose.

This made it difficult to remove the target, and the multipin shoulder bolts removal was required.

With the loose pin it was not possible to attach the multipin for the target C#4.

Chad was able to tighten the multipin guide pin enough, however it became obvious that the pin could not be removed when it was attempted.

With the pin tightened, the target C#4 was installed and all checks were good.

It was recommend that once the C#4 target is removed the TM4 will need some repair to remove the multipin guide pin. 

 

Chad - Also it was noted that the guide pin (ITA6453) in question showed signs of plating or heat (see pictures I've added)

Attachment 1: MicrosoftTeams-image.png
MicrosoftTeams-image.png
Attachment 2: MicrosoftTeams-image_(1).png
MicrosoftTeams-image_(1).png
Attachment 3: MicrosoftTeams-image_(2).png
MicrosoftTeams-image_(2).png
  2373   Tuesday, October 04, 2022, 07:19 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check

 an electrical was done for TM4 with target C#4 installed on NHC.

Attachment 1: tm4_with_C#4_installed.png
tm4_with_C#4_installed.png
  2379   Wednesday, October 19, 2022, 12:00 Carla BabcockNorth Hot-CellStandard OperationTM4SiC#44PIE on SiC#44

Conducted PIE on SiC#44, which failed online. It had a cathode short, a target short and an anode short by the time we called the experiment off. In the post irradiation examination, two clear marks where the target legs touched the heat shield were found (see attachments 1 and 2). No marks were found to indicate where the cathode short would have been. The fibreglass sheath covering the anode wire where it passes over top of the coil was destroyed, must have been a result of sparking (see attachment 3). No other issues noticed, grid looked fine, though close inspection is difficult.

Attachment 1: SiC44_PIE_20221012_150145.jpg
SiC44_PIE_20221012_150145.jpg
Attachment 2: SiC44_PIE_20221012.jpg
SiC44_PIE_20221012.jpg
Attachment 3: SiC44_PIE_20221012_161755.jpg
SiC44_PIE_20221012_161755.jpg
  2382   Tuesday, November 01, 2022, 12:40 Frank SongNorth Hot-CellStandard OperationTM2UCx#39electrical check

 TM2 with spent target UCx#39 had an electric check in NHC.

After UCx 39# target was removed out., I did electrical check on TM2.   @500 V B to C is 5M ohm. all Others between are above 25Mohm. HV to Chasis is 650Mohm.  A to P is still short.

Attachment 1: electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png
electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png
  2383   Wednesday, November 02, 2022, 11:11 Frank SongNorth Hot-CellStandard OperationTM2UCx#40electrical check

an electrical check was done on NHC, TM2 with new target UCx40 is ready moving to TCS.

Attachment 1: TM2_with_UCx40_electrical_check_on_NHC.png
TM2_with_UCx40_electrical_check_on_NHC.png
  2386   Thursday, November 03, 2022, 16:41 Carla BabcockNorth Hot-CellStandard Operation UCx#39Post irradiation inspection UCx#39

Did the PIE on UCx#39-IGLIS on Thursday Nov. 2 2022, couple pictures uploaded to docushare. Did not remove the target, just the heat shield cover.

Final electrical check on the module showed a dead short from TGHT/TBHT to HV common, which we did not see online. Seems like it must have occurred after ramp down? It persisted on the target after we removed it from the module. We couldn't find any obvious contact points, because it seems it did not happen while current was running in the target. Possible locations are the bottom support leg for the TBHT and the top of the right side target leg, though it was difficult to confirm with the camera.

Otherwise the only thing to note was a blacker-than-usual spot on the inside of the Cu heat shield, downstream in the proton direction.

 

  2389   Tuesday, November 22, 2022, 10:37 Adam NewsomeNorth Hot-CellStandard OperationTM4 TM4 Move - ITE to NHC

TM4 was moved from ITE to NHC with C#4.

  2390   Tuesday, November 22, 2022, 12:41 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check

 TM4 with C#4 is checked on NHC right after moving from ITE.

Attachment 1: TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png
TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png
  2391   Tuesday, November 22, 2022, 14:53 Carla BabcockNorth Hot-CellMaintenanceTM4 Multipin connector alignment pin on TM4 module loose

The pin on TM4 has become loose again, making it very difficult to remove the multipin connector with the last target, C#4. For the installation of the next target, UCx#41, we will drill out the hole on the target side bracket so that it doesn't contact the multipin pin. Will try to remove this pin by force in January, or if needed change out the whole multipin bracket.

  2392   Wednesday, November 23, 2022, 11:27 Frank SongNorth Hot-CellStandard OperationTM4UCx#41electric and leak check after new target installed

 an electric check and leak check done on NHC, TM4 with new target UCx#41 is ready moving to TCS.

Attachment 1: TM4_with_UCx#41_electric_and_leak_check_on_NHC.png
TM4_with_UCx#41_electric_and_leak_check_on_NHC.png
  2397   Thursday, December 01, 2022, 13:45 Carla BabcockNorth Hot-CellStandard OperationTM4C#4Post irradiation inspection C#4

Post irradiation inspection of C#4 which was running in TM4/ITE was conducted at the NHC on Nov. 22 2022.

The yields from this target had been dropping and its behaviour was erratic, with the voltages on the tube and target jumping all over the place sometimes. The ion current on the FCs followed the voltages. We took this to mean the target container was breaking down.

Upon inspection we found the container looked pretty damaged - highly crystallized and distorted. The container had gone banana-shaped, but not in the usual direction. It had curved  in the direction of the ion source (see photos). The heat shield and other surrounding components were super clean, no deposits or marks at all.

Attachment 1: 20221122_152435.jpg
20221122_152435.jpg
Attachment 2: 20221122_153033.jpg
20221122_153033.jpg
Attachment 3: 20221122_152407.jpg
20221122_152407.jpg
  2422   Monday, March 06, 2023, 11:31 Adam NewsomeNorth Hot-CellRepair  Spare Telemanipulator: Y-Motion Linear Actuator Repair

The linear actuator used for the Y-motion motor assistance on the spare telemanipulator was replaced and tested. It was observed around September 2021 that the former one which was installed was causing fuses to blow for the main 120 VAC power supply in the control box. After some troubleshooting, it was determined that the linear actuator itself did not operate smoothly - it was suspected that this caused motor overload due to additional friction. This suspicion was confirmed by operating the linear actuator independently with a power supply and measuring current draw. The part has been replaced by Thomson PPA90-58B65-08NXXX. Note: this part took over 1 year to arrive since it was first ordered. The spare telemanipulator is confirmed operational.

 

Update 2024-09-11: noting that this was for serial number 9351

  2423   Tuesday, March 07, 2023, 10:37 chad fisherNorth Hot-CellRepair  Spare Telemanipulator: Y-Motion Linear Actuator Repair

Adam Newsome wrote:

The linear actuator used for the Y-motion motor assistance on the spare telemanipulator was replaced and tested. It was observed around September 2021 that the former one which was installed was causing fuses to blow for the main 120 VAC power supply in the control box. After some troubleshooting, it was determined that the linear actuator itself did not operate smoothly - it was suspected that this caused motor overload due to additional friction. This suspicion was confirmed by operating the linear actuator independently with a power supply and measuring current draw. The part has been replaced by Thomson PPA90-58B65-08NXXX. Note: this part took over 1 year to arrive since it was first ordered. The spare telemanipulator is confirmed operational.

 During this repair it was noted that the Y-axis electrical translation is locked out when the Z-axis is in the fully retracted position (i.e. the Z-axis limit switch engaged). I have made a note of this in the operator manual (CRLD-1046-B Rev1 ) which can be found in docushare collection 26780

  2429   Monday, April 03, 2023, 07:55 chad fisherNorth Hot-CellStandard Operation  NHC, SHC field check

NHC is 1.26 mSv/h inside approximately .5m from table surface, between manipulators

 

SHC 186 uSv/h inside approximately .5m from table surface and between manipulaotrs

  2430   Tuesday, April 11, 2023, 11:35 chad fisherNorth Hot-CellStandard Operation  NHC fields post sample removal

The fields in the NHC after removal of Ferran's graphite sample is 238 uSv/h. This again seems to emanate for the items in the 5 gal pail...the copper tubing from the beam window or, as I mentioned in my previous elog, the peek samples. I did ask about removing these during the graphite sample removal but was told they were not "hot".