Tuesday, June 21, 2022, 18:43, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#37, electrical check
|
A p2n target in TM4 was electrical measured on NHC. see attachment pls. |
Thursday, June 23, 2022, 07:11, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta#64, electrical check
|
New Target Ta#64 was installed on TM4. Electrical measurement result is good. c/w attachment. |
Tuesday, June 28, 2022, 14:13, Frank Song, ITE, Standard Operation, TM4, Ta#64, Module Connection
|
TM4 with Ta#64 was connected in ITE. see attachment please. |
Tuesday, July 19, 2022, 11:47, Frank Song, ITW, Standard Operation, TM2, SiC#43 Febiad, TM2 with SiC#43 disconnected in ITW
|
the module was disconnected in pit and moved to NHC. |
Tuesday, July 19, 2022, 11:53, Frank Song, North Hot-Cell, Standard Operation, TM2, SiC#43 Febiad, electrical check
|
A electrical check was done at NHC, see the pic attached with please. |
Thursday, July 21, 2022, 10:24, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#38, electrical check
|
A electrical check was done for TM2 with UCx#38 |
Tuesday, July 26, 2022, 13:50, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#38, TM2 electrical check with Target and No external Connections
|
A standard electrical check was done for TM2 after the short issue be fixed. |
Wednesday, July 27, 2022, 08:11, Frank Song, ITW, Standard Operation, TM2, UCx#38, Module Connection
|
TM2 with Target UCx#38 was connected in ITW. |
Tuesday, August 09, 2022, 12:19, Frank Song, ITE, Standard Operation, TM4, Ta#64, TM4 with Ta#64 disconnection in ITE
|
TM4 with Ta#64 has been disconnected in ITE. |
Tuesday, August 09, 2022, 12:23, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #64, Electrical Check for TM4 with Ta#64 after beam at NHC
|
An electrical check made at NHC right after TM4 moving from ITE. |
Wednesday, August 10, 2022, 08:10, Frank Song, North Hot-Cell, Standard Operation, TM4, Sic#44, electrical and leak check
|
TM4 with Sic#44 installed and had an electrical / leak check at NHC. |
Thursday, August 18, 2022, 10:41, Frank Song, ITE/ITW, Standard Operation, TM4, SiC#44, TM4 with SiC#44 connection in ITE
|
TM4 with target SiC#44 was connected in ITE on Tuesday. |
Tuesday, September 06, 2022, 13:58, Frank Song, ITW, Standard Operation, TM2, UCx#38, module disconnection
|
TM2 with Target UCx38 was disconnected in ITW and moved to NHC |
Tuesday, September 06, 2022, 14:05, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#38, electrical check after disconnection
|
An electrical was done on the NHC for TM2 with spent Target UCx#38 on |
Thursday, September 08, 2022, 07:20, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#39, electrical check
|
An electrical check was done on NHC yesterday. |
Tuesday, September 13, 2022, 14:10, Frank Song, ITW, Standard Operation, TM2, UCx#39, Module Connection
|
TM2 with UCx#39 is connected in ITW. |
Monday, October 03, 2022, 09:42, Frank Song, ITE, Standard Operation, TM4, Sic#44, module disconnection
|
TM4 with SiC@44 was disconnected in ITE. |
Tuesday, October 04, 2022, 07:19, Frank Song, North Hot-Cell, Standard Operation, TM4, C#4, electrical check
|
an electrical was done for TM4 with target C#4 installed on NHC. |
Tuesday, October 11, 2022, 12:39, Frank Song, ITE, Standard Operation, TM4, C#4, Module Connection
|
TM4 with Target C#4 was connected in ITE. |
Tuesday, November 01, 2022, 12:37, Frank Song, ITW, Standard Operation, TM2, UCx#39, disconnection
|
TM2 with spent target UCx#39 was disconnected in ITW then moved to NHC. |
|