  853   Thursday, March 05, 2015, 07:17 David WangITWStandard Operation  TH Shut Down Activities Schedule Feb 23th- Apr 15th updateTH shut down jobs are processing as scheduled
this week. Discussed with Don, and we think
the jobs scheduled in next week should be
 6x 
  866   Monday, March 23, 2015, 07:56 David WangITEStandard Operation  TH Shut Down Activities Schedule Feb 23th- Apr 15th updateThis schedule is following Dons schedule
on module moves. See attachments for updating.
2015-03-27: Weekly update the schedule.
 Target_Hall_shut_down_activities.pdfTarget_Hall_shut_down_activities.mppTarget_Hall_shut_down_activities.pdfTarget_Hall_shut_down_activities.mpp 
  877   Monday, March 30, 2015, 07:38 David WangITEStandard OperationTM4 TH Shut Down Activities Schedule Feb 23th- Apr 15th updateUpdated schedule this morning after last
Fridays ISAC facility support group meeting.
Updated schedule on 2015-April -02.
 Target_Hall_shut_down_activities.pdfTarget_Hall_shut_down_activities.mppTarget_Hall_shut_down_activities.pdfTarget_Hall_shut_down_activities.mpp 
  2096   Monday, June 01, 2020, 12:40 David WangCraneMaintenance  TH crane festoon cable maintenanceTom Kauss corrected the TH crane 
festoon cable loops. He lubricated festoon
cable wheels as well.    The maintenance
  
  268   Monday, March 18, 2013, 12:39 Bevan MossConditioning StationRepairTM4CS Test Target #1TGHT PS FailureThe Model of the Power
Supply (PS) is TSQLG 480-20/1500 and serial
number is 2755.02.01.01.09. 
 IMG_0529.JPG 
  821   Monday, December 15, 2014, 12:53 Anders MjosConditioning StationMaintenanceTM2 TCSTK2 topped up

    

       
            
  
  2380   Wednesday, October 19, 2022, 12:04 Carla BabcockConditioning StationRepair  TCS:TBHT taken as replacement for ITE:TBHTDuring the last ITE run with the SiC#44
target, the ITE:TBHT controls card was fried
twice. The first time we put in our spare,
  
  312   Monday, April 22, 2013, 11:35 Bevan MossConditioning StationRepairTM3N/ATCS:DIF2 broken The flow meter on the primary side
(TCS:DIF2) of the conditioning station is
broken. I investigated and there is flow,
  
  767   Friday, October 17, 2014, 13:36 Anders MjosConditioning StationMaintenance  TCS:Chil staging not operationalNOTE: If cooling is required, the
compressors will have to be run manually.
Make sure to switch it off again when the
  
  2694   Friday, September 27, 2024, 07:29 David WangConditioning StationRepair  TCS water system resistivity analyzer has been repaired.TCS water system resistivity analyzer has
been repaired. Two diodes and one capacitor
on PS board were broken. They were replaced.
  
  1391   Thursday, November 03, 2016, 09:01 David WangConditioning StationStandard OperationTM4 TCS water system has been started for TM4.The system works fine. All water signals
to TM4 at TCS are normal. HV cover is installed
on to TM4 at TCS.
  
  2708   Thursday, October 24, 2024, 10:37 David WangConditioning StationStandard Operation  TCS water system functionnal test. TCS water system has been started for functional
test. System parameters including  pressure,
all temperature sensors, flow rate sensors,
  
  2606   Wednesday, June 05, 2024, 11:32 David WangConditioning StationStandard Operation  TCS water system filters have been changed. TCS water system  five filters were
changed yesterday by plant group Dan.T. Service
labels on filters are updated.  No water
  
  2786   Thursday, March 20, 2025, 13:10 David WangConditioning StationStandard Operation  TCS water system filters annual replacement has been done.TCS water system filters annual replacement
has been done. Plant group Dan Tower finished
the job and updated the inspection tags .
  
  1217   Thursday, April 28, 2016, 06:28 David WangConditioning StationMaintenanceTM2 TCS water system are turned off. TCS water system worked fine overnight.
I turned off TCS water system at 6:16 AM
this morning. Start of purging TM2 water
  
  1408   Tuesday, November 29, 2016, 06:27 David WangConditioning StationStandard OperationTM2 TCS water pumps are stoppedArgon venting on TCS and TM2 is processing   
  2454   Monday, June 12, 2023, 07:36 David WangConditioning StationStandard Operation  TCS water filters annual change. Plant group changed TCS water filters last
Friday. 4 filters on resin can inet /outlet
sides and filters(4 in one cartridge house)on
  
  2585   Wednesday, May 08, 2024, 12:36 David WangConditioning StationStandard OperationTM3UCx#44TCS was argon vented this morning between 7:00 to 8:30 am.TCS was argon vented this morning between
7:00 to 8:30 am before module was moved to
ITE.
  
  2600   Tuesday, May 28, 2024, 07:45 David WangConditioning StationStandard OperationTM4UCx#45TCS was argon vented this morning between 6:00 and 7:30am. TCS was argon vented this morning between
6:00 and 7:30am for TM4 moving to ITW.
  
  2049   Tuesday, January 14, 2020, 10:19 David WangConditioning StationStandard OperationTM3 TCS vacuum system is switched off. TM3 TP1 and TP2 work  fine in past
4 days. During operation, The current draw
on pumps were 0.7A to 0.8 A. TM3 will be
  
ELOG V2.9.2-2455