2321
|
Wednesday, May 18, 2022, 13:52 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | UCx#37 | electrical check |
The TM4 with installed target #UCx37 had been electric checked at SHC. PICs attached. |
Attachment 1: 1.jpg
|
|
Attachment 2: 2.jpg
|
|
Attachment 3: 3.jpg
|
|
|
2323
|
Thursday, May 19, 2022, 15:05 |
Frank Song | ITE | Standard Operation | TM4 | UCx#37 | UCx#37 P2N connection on TM4 |
TM4 with UCx#37 was connected in ITE. Attachment available. |
Attachment 1: 01_UCx37_P2N_connection_on_TM4.jpg
|
|
Attachment 2: 02_UCx37_P2N_connection_on_TM4.jpg
|
|
Attachment 3: 03_UCx37_P2N_connection_on_TM4.jpg
|
|
|
2326
|
Wednesday, May 25, 2022, 13:43 |
Frank Song | ITW | Standard Operation | TM2 | Febiad-Test | module disconnection |
TM2 with a test target was disconnected in ITW. |
Attachment 1: tm2_disconnection.jpg
|
|
|
2327
|
Monday, June 06, 2022, 14:15 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | SiC#42 | TM2 FEBIAD with Target and No external Connections |
An electrical check was done at SHC for TM2 with FEBIAD SiC #42 Target. |
Attachment 1: TM2_with_FEBIAD_SiC_42_electrical_check.jpg
|
|
|
2328
|
Tuesday, June 07, 2022, 14:15 |
Frank Song | ITE/ITW | Standard Operation | TM2 | SiC#42 | Module Connection |
TM2 with Febiad target SiC#42 was connected in ITW. |
Attachment 1: TM2_with_sic_42_connected_in_ITW.jpg
|
|
|
2330
|
Monday, June 20, 2022, 11:00 |
Frank Song | North Hot-Cell | Repair | TM2 | SiC#42 | Failed Sic#42 electrical measurement at NHC |
An electrical check was done at NHC, see attachment pls. |
Attachment 1: Failed_Sic#42_electrical_measurement_at_NHC.jpg
|
|
|
2331
|
Monday, June 20, 2022, 18:03 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Sic#43 | electrical check |
TM2 with new target SiC#43 was electrical checked at SHC. please see attachment. |
Attachment 1: TM2_with_SiC43.jpg
|
|
|
2333
|
Tuesday, June 21, 2022, 17:49 |
Frank Song | ITE | Standard Operation | TM4 | UCx#37 | TM4 disconnection |
the module with target UCx37 was disconnected in ITE. |
Attachment 1: TM4_with_UCx#37_disconnection_in_ITE.jpg
|
|
|
2334
|
Tuesday, June 21, 2022, 18:30 |
Frank Song | ITW | Standard Operation | TM2 | SiC#43 Febiad | Module Connection |
TM2 with Febiad Target SiC #43 was connected in ITW. NOTE: the number of TARGET in attached picture should be #43. |
Attachment 1: TM2_with_sic_42_connected_in_ITW.jpg
|
|
|
2335
|
Tuesday, June 21, 2022, 18:43 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#37 | electrical check |
A p2n target in TM4 was electrical measured on NHC. see attachment pls. |
Attachment 1: p2n_ucx37_electrical_check.jpg
|
|
|
2338
|
Thursday, June 23, 2022, 07:11 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#64 | electrical check |
New Target Ta#64 was installed on TM4. Electrical measurement result is good. c/w attachment. |
Attachment 1: Ta#64.jpg
|
|
|
2341
|
Tuesday, June 28, 2022, 14:13 |
Frank Song | ITE | Standard Operation | TM4 | Ta#64 | Module Connection |
TM4 with Ta#64 was connected in ITE. see attachment please. |
Attachment 1: tm4_with_Ta#64_connection_in_ITE.jpg
|
|
|
2346
|
Tuesday, July 19, 2022, 11:47 |
Frank Song | ITW | Standard Operation | TM2 | SiC#43 Febiad | TM2 with SiC#43 disconnected in ITW |
the module was disconnected in pit and moved to NHC. |
Attachment 1: TM2_with_SiC43_disconnection_in_ITW.jpg
|
|
|
2347
|
Tuesday, July 19, 2022, 11:53 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | SiC#43 Febiad | electrical check |
A electrical check was done at NHC, see the pic attached with please. |
Attachment 1: e_check_for_TM2_with_SiC43_Febiad.jpg
|
|
|
2348
|
Thursday, July 21, 2022, 10:24 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | electrical check |
A electrical check was done for TM2 with UCx#38 |
Attachment 1: TM2_with_UCx38_echeck_on_NHC.jpg
|
|
|
2349
|
Tuesday, July 26, 2022, 13:50 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | TM2 electrical check with Target and No external Connections |
A standard electrical check was done for TM2 after the short issue be fixed. |
Attachment 1: TM2_with_UCx38_echeck_on_NHC.jpg
|
|
|
2350
|
Wednesday, July 27, 2022, 08:11 |
Frank Song | ITW | Standard Operation | TM2 | UCx#38 | Module Connection |
TM2 with Target UCx#38 was connected in ITW. |
Attachment 1: TM2_with_UCx38_connection_at_ITW.jpg
|
|
|
2353
|
Tuesday, August 09, 2022, 12:19 |
Frank Song | ITE | Standard Operation | TM4 | Ta#64 | TM4 with Ta#64 disconnection in ITE |
TM4 with Ta#64 has been disconnected in ITE. |
Attachment 1: TM4_with_Ta#64_disconnection_in_ITE.jpeg
|
|
|
2354
|
Tuesday, August 09, 2022, 12:23 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #64 | Electrical Check for TM4 with Ta#64 after beam at NHC |
An electrical check made at NHC right after TM4 moving from ITE. |
Attachment 1: tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg
|
|
|
2355
|
Wednesday, August 10, 2022, 08:10 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Sic#44 | electrical and leak check |
TM4 with Sic#44 installed and had an electrical / leak check at NHC. |
Attachment 1: TM4_with_Sic#44_eletrical_and_leak_check.jpg
|
|