2335
|
Tuesday, June 21, 2022, 18:43 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#37 | electrical check |
A p2n target in TM4 was electrical measured on NHC. see attachment pls. |
Attachment 1: p2n_ucx37_electrical_check.jpg
|
|
2338
|
Thursday, June 23, 2022, 07:11 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#64 | electrical check |
New Target Ta#64 was installed on TM4. Electrical measurement result is good. c/w attachment. |
Attachment 1: Ta#64.jpg
|
|
2341
|
Tuesday, June 28, 2022, 14:13 |
Frank Song | ITE | Standard Operation | TM4 | Ta#64 | Module Connection |
TM4 with Ta#64 was connected in ITE. see attachment please. |
Attachment 1: tm4_with_Ta#64_connection_in_ITE.jpg
|
|
2346
|
Tuesday, July 19, 2022, 11:47 |
Frank Song | ITW | Standard Operation | TM2 | SiC#43 Febiad | TM2 with SiC#43 disconnected in ITW |
the module was disconnected in pit and moved to NHC. |
Attachment 1: TM2_with_SiC43_disconnection_in_ITW.jpg
|
|
2347
|
Tuesday, July 19, 2022, 11:53 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | SiC#43 Febiad | electrical check |
A electrical check was done at NHC, see the pic attached with please. |
Attachment 1: e_check_for_TM2_with_SiC43_Febiad.jpg
|
|
2348
|
Thursday, July 21, 2022, 10:24 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | electrical check |
A electrical check was done for TM2 with UCx#38 |
Attachment 1: TM2_with_UCx38_echeck_on_NHC.jpg
|
|
2349
|
Tuesday, July 26, 2022, 13:50 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | TM2 electrical check with Target and No external Connections |
A standard electrical check was done for TM2 after the short issue be fixed. |
Attachment 1: TM2_with_UCx38_echeck_on_NHC.jpg
|
|
2350
|
Wednesday, July 27, 2022, 08:11 |
Frank Song | ITW | Standard Operation | TM2 | UCx#38 | Module Connection |
TM2 with Target UCx#38 was connected in ITW. |
Attachment 1: TM2_with_UCx38_connection_at_ITW.jpg
|
|
2353
|
Tuesday, August 09, 2022, 12:19 |
Frank Song | ITE | Standard Operation | TM4 | Ta#64 | TM4 with Ta#64 disconnection in ITE |
TM4 with Ta#64 has been disconnected in ITE. |
Attachment 1: TM4_with_Ta#64_disconnection_in_ITE.jpeg
|
|
2354
|
Tuesday, August 09, 2022, 12:23 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #64 | Electrical Check for TM4 with Ta#64 after beam at NHC |
An electrical check made at NHC right after TM4 moving from ITE. |
Attachment 1: tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg
|
|
2355
|
Wednesday, August 10, 2022, 08:10 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Sic#44 | electrical and leak check |
TM4 with Sic#44 installed and had an electrical / leak check at NHC. |
Attachment 1: TM4_with_Sic#44_eletrical_and_leak_check.jpg
|
|
2358
|
Thursday, August 18, 2022, 10:41 |
Frank Song | ITE/ITW | Standard Operation | TM4 | SiC#44 | TM4 with SiC#44 connection in ITE |
TM4 with target SiC#44 was connected in ITE on Tuesday. |
Attachment 1: TM4_with_SiC#44_connection_in_ITE.jpg
|
|
2361
|
Tuesday, September 06, 2022, 13:58 |
Frank Song | ITW | Standard Operation | TM2 | UCx#38 | module disconnection |
TM2 with Target UCx38 was disconnected in ITW and moved to NHC |
Attachment 1: TM2_with_UCx38_disconnection_in_ITW.png
|
|
2362
|
Tuesday, September 06, 2022, 14:05 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | electrical check after disconnection |
An electrical was done on the NHC for TM2 with spent Target UCx#38 on |
Attachment 1: TM2_electrical_check_on_NHC_with_spent_UCx38_on.png
|
|
2363
|
Thursday, September 08, 2022, 07:20 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#39 | electrical check |
An electrical check was done on NHC yesterday. |
Attachment 1: TM2_with_UCx#39_E_Check.png
|
|
2365
|
Tuesday, September 13, 2022, 14:10 |
Frank Song | ITW | Standard Operation | TM2 | UCx#39 | Module Connection |
TM2 with UCx#39 is connected in ITW. |
Attachment 1: TM2_with_UCx#39_connection_in_ITW.png
|
|
2370
|
Monday, October 03, 2022, 09:42 |
Frank Song | ITE | Standard Operation | TM4 | Sic#44 | module disconnection |
TM4 with SiC@44 was disconnected in ITE. |
Attachment 1: TM4_with_SiC#44_disconnected_in_ITE.png
|
|
2373
|
Tuesday, October 04, 2022, 07:19 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | C#4 | electrical check |
an electrical was done for TM4 with target C#4 installed on NHC. |
Attachment 1: tm4_with_C#4_installed.png
|
|
2376
|
Tuesday, October 11, 2022, 12:39 |
Frank Song | ITE | Standard Operation | TM4 | C#4 | Module Connection |
TM4 with Target C#4 was connected in ITE. |
Attachment 1: TM4_with_C#4_connection_in_ITE.png
|
|
2381
|
Tuesday, November 01, 2022, 12:37 |
Frank Song | ITW | Standard Operation | TM2 | UCx#39 | disconnection |
TM2 with spent target UCx#39 was disconnected in ITW then moved to NHC. |
Attachment 1: TM2_with_UCx39_disconnection_in_ITW.png
|
|