  2335   Tuesday, June 21, 2022, 18:43 Frank SongNorth Hot-CellStandard OperationTM4UCx#37electrical check

 A p2n target in TM4 was electrical measured on NHC. see attachment pls.

  2338   Thursday, June 23, 2022, 07:11 Frank SongNorth Hot-CellStandard OperationTM4Ta#64electrical check

 New Target Ta#64 was installed on TM4. Electrical measurement result is good. c/w attachment.

  2341   Tuesday, June 28, 2022, 14:13 Frank SongITEStandard OperationTM4Ta#64Module Connection

 TM4 with Ta#64 was connected in ITE. see attachment please.

  2346   Tuesday, July 19, 2022, 11:47 Frank SongITWStandard OperationTM2SiC#43 FebiadTM2 with SiC#43 disconnected in ITW

 the module was disconnected in pit and moved to NHC.

  2347   Tuesday, July 19, 2022, 11:53 Frank SongNorth Hot-CellStandard OperationTM2SiC#43 Febiadelectrical check

 A electrical check was done at NHC, see the pic attached with please.

  2348   Thursday, July 21, 2022, 10:24 Frank SongNorth Hot-CellStandard OperationTM2UCx#38electrical check

 A electrical check was done for TM2 with UCx#38

  2349   Tuesday, July 26, 2022, 13:50 Frank SongNorth Hot-CellStandard OperationTM2UCx#38TM2 electrical check with Target and No external Connections

 A standard electrical check was done for TM2 after the short issue be fixed.

  2350   Wednesday, July 27, 2022, 08:11 Frank SongITWStandard OperationTM2UCx#38Module Connection

 TM2 with Target UCx#38 was connected in ITW.

  2353   Tuesday, August 09, 2022, 12:19 Frank SongITEStandard OperationTM4Ta#64TM4 with Ta#64 disconnection in ITE

 TM4 with Ta#64 has been disconnected in ITE.

  2354   Tuesday, August 09, 2022, 12:23 Frank SongNorth Hot-CellStandard OperationTM4Ta #64Electrical Check for TM4 with Ta#64 after beam at NHC

 An electrical check made at NHC right after TM4 moving from ITE.

  2355   Wednesday, August 10, 2022, 08:10 Frank SongNorth Hot-CellStandard OperationTM4Sic#44electrical and leak check

 TM4 with Sic#44 installed and had an electrical / leak check at NHC. 

  2358   Thursday, August 18, 2022, 10:41 Frank SongITE/ITWStandard OperationTM4SiC#44TM4 with SiC#44 connection in ITE

 TM4 with target SiC#44 was connected in ITE on Tuesday.

  2361   Tuesday, September 06, 2022, 13:58 Frank SongITWStandard OperationTM2UCx#38module disconnection

 TM2 with Target UCx38 was disconnected in ITW and moved to NHC

  2362   Tuesday, September 06, 2022, 14:05 Frank SongNorth Hot-CellStandard OperationTM2UCx#38electrical check after disconnection

 An electrical was done on the NHC for TM2 with spent Target UCx#38 on

  2363   Thursday, September 08, 2022, 07:20 Frank SongNorth Hot-CellStandard OperationTM2UCx#39electrical check

 An electrical check was done on NHC yesterday.

  2365   Tuesday, September 13, 2022, 14:10 Frank SongITWStandard OperationTM2UCx#39Module Connection

 TM2 with UCx#39 is connected in ITW.

  2370   Monday, October 03, 2022, 09:42 Frank SongITEStandard OperationTM4Sic#44module disconnection

 TM4 with SiC@44 was disconnected in ITE.

  2373   Tuesday, October 04, 2022, 07:19 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check

 an electrical was done for TM4 with target C#4 installed on NHC.

  2376   Tuesday, October 11, 2022, 12:39 Frank SongITEStandard OperationTM4C#4Module Connection

 TM4 with Target C#4 was connected in ITE.

  2381   Tuesday, November 01, 2022, 12:37 Frank SongITWStandard OperationTM2UCx#39disconnection

 TM2 with spent target UCx#39 was disconnected in ITW then moved to NHC.