435
|
Thursday, August 29, 2013, 09:08 |
chad fisher | South Hot-Cell | Repair | TM3 | | Heat Shield Circuit Leak | The heat shield circuit was pressurized
with air (15-20 psi) and snoop applied to
the water block joint and brazes. Bubbles |
|
506
|
Thursday, October 17, 2013, 10:24 |
chad fisher | South Hot-Cell | Repair | TM4 | | Coil Line Removal | The containment box was removed from TM4
earlier this morning in preparation for removal
of the C2 circuit water lines, their |
|
509
|
Friday, October 18, 2013, 13:43 |
chad fisher | South Hot-Cell | Repair | TM4 | | C2 Circuit Removal | The C2 circuit (coil 2) water lines and
blocks have been revoed from TM4.
Water block jig could not be used |
|
534
|
Monday, November 04, 2013, 10:46 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Exploration | TM2 is now in the hot cell with the containment
box off for inspection and eventual blank
off off the water blocks. |
|
535
|
Tuesday, November 05, 2013, 10:37 |
chad fisher | South Hot-Cell | Repair | TM2 | | Thermocouple wire removal | The old thermocouple wire has been sucessfully
removed from the module.
Thanks Bevan, Travis and David. |
|
543
|
Thursday, November 14, 2013, 08:08 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Blank off and jig removal | Firday, November 8 all water blocks (excluding
I and K) were blanked off and vacuum leak
checked. No responses were found. (First |
|
551
|
Wednesday, November 20, 2013, 08:50 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | NiO#2 | NiO#2 removed | NiO#2 has been removed from TM3 |
|
560
|
Friday, November 29, 2013, 11:54 |
chad fisher | South Hot-Cell | Repair | TM3 | | Steerer short investegation | Using in cell camera and transit the suspect
line on the steerers was inspected as best
as possible. An existing photo of the complete |
|
569
|
Wednesday, December 04, 2013, 13:57 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta #47 | Ta #47 Removed - broken bolt | Ta #47 has been removed from TM4.
One containment box cover bolt would
not come out. Upon attempted removal with |
|
579
|
Thursday, January 09, 2014, 11:07 |
chad fisher | South Hot-Cell | Maintenance | | | Field Level | I have managed to reduce the field at the
broken manipulator from 12 mSv/h to 400 uSv/h. |
|
580
|
Thursday, January 16, 2014, 10:36 |
chad fisher | South Hot-Cell | Repair | | | East Manipulator Repair | The repair/cable replacement on the east
manipulator is now complete.
Yesterday's initail cable replacement |
|
595
|
Friday, February 07, 2014, 10:29 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 C.B. and circuit D | Containment box has been removed and the
blank off from circuit D has been removed
for inspection of both the blank off and |
|
596
|
Tuesday, February 11, 2014, 13:56 |
chad fisher | South Hot-Cell | Repair | TM2 | | waterblock cleaning | New cleaning and polishing pads have been
inserted onto the hot cell as well as rubber
bungs and a new blank off. |
|
604
|
Thursday, February 20, 2014, 11:04 |
chad fisher | South Hot-Cell | Repair | TM2 | | Readying TM2 for C-Seal Leak Check | Containment box has been removed and water
block jig installed. |
|
605
|
Monday, February 24, 2014, 11:05 |
chad fisher | South Hot-Cell | Repair | TM2 | | Circuit D blank off | The blank off with the o-ring has been
removed, manipulator fixed, circuit D water
block sealinhg surfaces cleaned and blank |
|
606
|
Monday, February 24, 2014, 12:09 |
chad fisher | South Hot-Cell | Repair | TM2 | | C-seal blank off test | Circuit D has passed the vacuum leak check.
Jig has been removed and containment box
re-installed for move to conditioning station. |
|
630
|
Tuesday, March 25, 2014, 09:11 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Ta#42 install and "new" 9 pin | Ta#42 has been installed onto TM4. The
"new" 9 pin connector was not an
issue...attually went on better than any |
|
642
|
Monday, April 07, 2014, 14:13 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | TiC#4 | TiC#4 installation | TiC#4 has been installed onto TM3 |
|
671
|
Monday, June 02, 2014, 11:25 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx #9 | UCx #9 Installed | UCx #9 has been installed. |
|
704
|
Wednesday, July 16, 2014, 13:56 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#9 | UCx#9 off Ta on | The UCx#9 target has been revomed from
the target module...leg A was broken as suspected.
Ta#42 has been installed. High current |
|