Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Entry  Friday, November 29, 2013, 11:54, chad fisher, South Hot-Cell, Repair, TM3, , Steerer short investegation TM3_20131129_Steerer_1.jpgTM3_20131129_Steerer_2.jpgTM3_20131129_Steerer_3.jpg
    Reply  Friday, November 29, 2013, 11:57, Bevan Moss, South Hot-Cell, Repair, TM3, , Steerer short investegation 
Message ID: 560     Entry time: Friday, November 29, 2013, 11:54     Reply to this: 561
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM3 
Target/Number:  
Subject: Steerer short investegation 

Using in cell camera and transit the suspect line on the steerers was inspected as best as possible. An existing photo of the complete steerers before installation was used for comparison. The wiring and beading inspected today showed no obvious problems, breaks or spots where there may be a short. In comparison to the photo from construction, what we could see of the steerers looked identical to the original installation.

Attachment 1: TM3_20131129_Steerer_1.jpg  1.420 MB  | Show | Hide all
Attachment 2: TM3_20131129_Steerer_2.jpg  1.038 MB  | Show | Hide all
Attachment 3: TM3_20131129_Steerer_3.jpg  1.286 MB  | Show | Hide all
ELOG V2.9.2-2455