Entry  Thursday, August 29, 2013, 09:08, chad fisher, South Hot-Cell, Repair, TM3, , Heat Shield Circuit Leak 20130829_084751.jpg20130829_084754.jpg20130829_084949.jpg20130829_084957.jpg
The heat shield circuit was pressurized with air (15-20 psi) and snoop applied to the water block joint and brazes. Bubbles formed at the joint between
the two water blocks indicating that the leak is a c seal problem. Pictures attached but also on docushare Collection-11285.
Entry  Thursday, October 17, 2013, 10:24, chad fisher, South Hot-Cell, Repair, TM4, , Coil Line Removal TM4_C2_circuit.pdf
The containment box was removed from TM4 earlier this morning in preparation for removal of the C2 circuit water lines, their respective water
blocks and conductor block.
Entry  Friday, October 18, 2013, 13:43, chad fisher, South Hot-Cell, Repair, TM4, , C2 Circuit Removal IMG_1224[1].JPGIMG_1227[1].JPGIMG_1230[1].JPG
The C2 circuit (coil 2) water lines and blocks have been revoed from TM4.
Water block jig could not be used as the window water block connection was nowhere near fitting into the jig (IMG_1224 image below) and
therefore caused an interference causing the rest of the blocks to not mate with the jig. A different tool that has never been used was implimented and
Entry  Monday, November 04, 2013, 10:46, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Exploration TM2_20131104.jpg
TM2 is now in the hot cell with the containment box off for inspection and eventual blank off off the water blocks.
Upon initail inspection the status (fron a hot cell point of view) is:
-Water block jig is equipped/on
Entry  Tuesday, November 05, 2013, 10:37, chad fisher, South Hot-Cell, Repair, TM2, , Thermocouple wire removal 
The old thermocouple wire has been sucessfully removed from the module.
Thanks Bevan, Travis and David.
Entry  Thursday, November 14, 2013, 08:08, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Blank off and jig removal TM2_20131108.jpgTM2_20131112.jpg
Firday, November 8 all water blocks (excluding I and K) were blanked off and vacuum leak checked. No responses were found. (First Picture)
I and K could not be blanked off without removal of the water block jig. Also, I dropped one of the blank offs onto the table, so one line could
not be blanked off until a new clean blank off was inserted into the cell. In addition, there was still reminace of a bolt in block Ias it aslo could not
Entry  Wednesday, November 20, 2013, 08:50, chad fisher, South Hot-Cell, Standard Operation, TM3, NiO#2, NiO#2 removed TM3_20131120.jpgTM3_20131120_2.jpg
NiO#2 has been removed from TM3
Entry  Friday, November 29, 2013, 11:54, chad fisher, South Hot-Cell, Repair, TM3, , Steerer short investegation TM3_20131129_Steerer_1.jpgTM3_20131129_Steerer_2.jpgTM3_20131129_Steerer_3.jpg
Using in cell camera and transit the suspect line on the steerers was inspected as best as possible. An existing photo of the complete steerers before
installation was used for comparison. The wiring and beading inspected today showed no obvious problems, breaks or spots where there may be a short. In
comparison to the photo from construction, what we could see of the steerers looked identical to the original installation.
Entry  Wednesday, December 04, 2013, 13:57, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta #47, Ta #47 Removed - broken bolt 
Ta #47 has been removed from TM4.
One containment box cover bolt would not come out. Upon attempted removal with the stud remover the bolt sheared...which is not uncommon...just
hasn't happened in many years...CBB being stuck or shearing.
Entry  Thursday, January 09, 2014, 11:07, chad fisher, South Hot-Cell, Maintenance, , , Field Level 
I have managed to reduce the field at the broken manipulator from 12 mSv/h to 400 uSv/h.
Entry  Thursday, January 16, 2014, 10:36, chad fisher, South Hot-Cell, Repair, , , East Manipulator Repair Manip_repair_20140114.jpgManip_repair_20140115.jpg
The repair/cable replacement on the east manipulator is now complete.
Yesterday's initail cable replacement went very well however, due to a minor glich, we were unable to test the tong movement until I was out of
the hot cell. Tong did not fully close and felt like there was a "hard stop" at a repeatable spot in the  closing of the tong. Upon further
Entry  Friday, February 07, 2014, 10:29, chad fisher, South Hot-Cell, Repair, TM2, , TM2 C.B. and circuit D TM2_20140207_1.jpgTM2_20140207_2.jpg
Containment box has been removed and the blank off from circuit D has been removed for inspection of both the blank off and water block sealing surface.
Entry  Tuesday, February 11, 2014, 13:56, chad fisher, South Hot-Cell, Repair, TM2, , waterblock cleaning TM2_20140207_2.jpgTM2_20140211_2.jpg
New cleaning and polishing pads have been inserted onto the hot cell as well as rubber bungs and a new blank off.
The inital waterblock cleaning with the "scotch bright" pads has been completed. See attached pictures...the first picture being before
and the second after.
Entry  Thursday, February 20, 2014, 11:04, chad fisher, South Hot-Cell, Repair, TM2, , Readying TM2 for C-Seal Leak Check TM2_20140220_01.jpg
Containment box has been removed and water block jig installed.
Entry  Monday, February 24, 2014, 11:05, chad fisher, South Hot-Cell, Repair, TM2, , Circuit D blank off 
The blank off with the o-ring has been removed, manipulator fixed, circuit D water block sealinhg surfaces cleaned and blank off with c-seals installed
and torqued. Leak check will occur shortly.
Entry  Monday, February 24, 2014, 12:09, chad fisher, South Hot-Cell, Repair, TM2, , C-seal blank off test TM2_20140224_1.jpg
Circuit D has passed the vacuum leak check. Jig has been removed and containment box re-installed for move to conditioning station.
Entry  Tuesday, March 25, 2014, 09:11, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#42, Ta#42 install and "new" 9 pin TM4_20140325_01.jpg
Ta#42 has been installed onto TM4. The "new" 9 pin connector was not an issue...attually went on better than any other previous one. Leaving
the mounting screws loose on the target half allowed use of the manipulator to center the pins and insert them with ease.
Entry  Monday, April 07, 2014, 14:13, chad fisher, South Hot-Cell, Standard Operation, TM3, TiC#4, TiC#4 installation 
TiC#4 has been installed onto TM3
Entry  Monday, June 02, 2014, 11:25, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx #9, UCx #9 Installed 
UCx #9 has been installed.
Entry  Wednesday, July 16, 2014, 13:56, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#9, UCx#9 off Ta on 
The UCx#9 target has been revomed from the target module...leg A was broken as suspected.
Ta#42 has been installed. High current connection fasteners torqued to 150 in lbs.