Entry  Tuesday, November 23, 2021, 10:46, Frank Song, ITE, Standard Operation, TM4, UCx#35, module disconnection IMG_4456_(2).JPG

 the TM4 with UCx#35 was disconnected in ITE.

Entry  Wednesday, November 24, 2021, 07:17, Frank Song, South Hot-Cell, Standard Operation, TM4, Ta #63, TM4 SIS with Target and No external Connections IMG_4469.JPG

the TM4 with new target Ta #63 installed in SHC and an electric check was made by David. 

Entry  Wednesday, January 05, 2022, 09:38, Frank Song, ITE, Maintenance, TM4, Ta #63, TM4 SIS with Target and No external Connections tm4_with_Ta#63.jpg

 electric check done in ITE. 

Entry  Wednesday, January 05, 2022, 12:45, Frank Song, ITW, Maintenance, TM2, UC#36, TM2 SIS with Target and No external Connections TM2_with_UCx36.jpg

 electrical checked in ITW

Entry  Monday, January 17, 2022, 10:44, Frank Song, South Hot-Cell, Standard Operation, TM2, UC#36 (the target removed), TM2 electrical check without Target. TM2_without_UCx36_at_SHC_(2).jpg

 An electric check was done right after module moving from SMP to SHC. 

Entry  Tuesday, January 18, 2022, 11:02, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #63, TM4 SIS with Target and No external Connections tm4_with_Ta#63_on_NHC.jpg

 David made an electric check after TM4 been moved to NHC from ITE. The target is still on the module. Please find out attached pic for detail.

Entry  Wednesday, January 19, 2022, 09:00, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #63, Electrical check on TM4 at NHC without target 20220119_080049.jpg

 David did electrical check after target removed from TM4 at NHC. see attachment pls.

Entry  Tuesday, February 15, 2022, 11:18, Frank Song, Cooling, Repair, , , Replace 2 leak valves on high active water system v10_v11.jpgv10.jpgv11.jpg

 The valves #V10 & V11 beside high active water pumps were replaced in Target Hall, pics attached.

 

Entry  Wednesday, February 16, 2022, 15:19, Frank Song, Cooling, Repair, , , high active cooling water valves repaired/replaced RETURN_drain_valve_in_ITE.jpgFEBIAD_COIL_in_ITW.jpgENTRANCE_COLLIMATOR_RETURN_in_ITW.jpgMAIN_S_and_R_VALVES_in_ITW.jpg

 A 3/8 inch drain valve on return cooling line was replaced in ITE. In the meantime two 1/2 inch valves labeled FEBIAD COIL and ENTRANCE COLLIMATOR RETURN at ITW were replaced . The 2 inches leaky supply/return water valves in ITW were repaired as well. Pls check pics

attached here for detail.

Entry  Thursday, April 21, 2022, 13:29, Frank Song, South Hot-Cell, Standard Operation, TM2, Febiad TEST, TM2 FEBIAD WITH A TEST TARGET TEST_FEBIAD_TARGET_E_CHECK.jpg

 A Test Febiad Target was installed and checked at SHC. 

Entry  Thursday, April 28, 2022, 07:24, Frank Song, ITW, Standard Operation, TM2, Febiad Test Target, Module Connection module_connection_checklist20220426.jpg

 TM2 was connected in ITW with a Febiad Test Target. 

Entry  Wednesday, May 18, 2022, 13:52, Frank Song, South Hot-Cell, Standard Operation, TM4, UCx#37, electrical check  1.jpg2.jpg3.jpg

 The TM4 with installed target #UCx37 had been electric checked at SHC. PICs attached.

Entry  Thursday, May 19, 2022, 15:05, Frank Song, ITE, Standard Operation, TM4, UCx#37, UCx#37 P2N connection on TM4 01_UCx37_P2N_connection_on_TM4.jpg02_UCx37_P2N_connection_on_TM4.jpg03_UCx37_P2N_connection_on_TM4.jpg

 TM4 with UCx#37 was connected in ITE. Attachment available.

Entry  Wednesday, May 25, 2022, 13:43, Frank Song, ITW, Standard Operation, TM2, Febiad-Test, module disconnection tm2_disconnection.jpg

 TM2 with a test target was disconnected in ITW.

Entry  Monday, June 06, 2022, 14:15, Frank Song, South Hot-Cell, Standard Operation, TM2, SiC#42, TM2 FEBIAD with Target and No external Connections TM2_with_FEBIAD_SiC_42_electrical_check.jpg

 An electrical check was done at SHC for TM2 with FEBIAD SiC #42 Target. 

Entry  Tuesday, June 07, 2022, 14:15, Frank Song, ITE/ITW, Standard Operation, TM2, SiC#42, Module Connection TM2_with_sic_42_connected_in_ITW.jpg

 TM2 with Febiad target SiC#42 was connected in ITW.

Entry  Monday, June 20, 2022, 11:00, Frank Song, North Hot-Cell, Repair, TM2, SiC#42, Failed Sic#42 electrical measurement at NHC Failed_Sic#42_electrical_measurement_at_NHC.jpg

 An electrical check was done at NHC, see attachment pls.

Entry  Monday, June 20, 2022, 18:03, Frank Song, South Hot-Cell, Standard Operation, TM2, Sic#43, electrical check TM2_with_SiC43.jpg

 TM2 with new target SiC#43 was electrical checked at SHC. please see attachment.

Entry  Tuesday, June 21, 2022, 17:49, Frank Song, ITE, Standard Operation, TM4, UCx#37, TM4 disconnection TM4_with_UCx#37_disconnection_in_ITE.jpg

 the module with target UCx37 was disconnected in ITE.

Entry  Tuesday, June 21, 2022, 18:30, Frank Song, ITW, Standard Operation, TM2, SiC#43 Febiad, Module Connection TM2_with_sic_42_connected_in_ITW.jpg

 TM2 with Febiad Target SiC #43 was connected in ITW. NOTE: the number of TARGET in attached picture should be #43. 