|
ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
|
2380
|
Wednesday, October 19, 2022, 12:04 |
Carla Babcock | Conditioning Station | Repair | | | TCS:TBHT taken as replacement for ITE:TBHT |
During the last ITE run with the SiC#44 target, the ITE:TBHT controls card was fried twice. The first time we put in our spare, and the second time we just continued to run without controls readback. For the C#4 run starting Oct. 19, we used the conditioning station supply. As soon as one of the other supplies is fixed, we will install it in the conditioning station. The equipment list (https://triumfoffice365-my.sharepoint.com/:x:/g/personal/cbabcock_triumf_ca/EQPffP4p1P9JqEDWIHGRPfsBVDSQjMCv-M8ZNg4ngkyGHw?e=fnLVYe) tracks these movements. |
|
312
|
Monday, April 22, 2013, 11:35 |
Bevan Moss | Conditioning Station | Repair | TM3 | N/A | TCS:DIF2 broken |
The flow meter on the primary side (TCS:DIF2) of the conditioning station is broken. I investigated and there is flow, the gauge is not fouled, and the PLC does read back when current supplied. The gauge is also reciving 24V but the output is 0V and 0mA. I will contact ESC and the supplier. |
|
767
|
Friday, October 17, 2014, 13:36 |
Anders Mjos | Conditioning Station | Maintenance | | | TCS:Chil staging not operational |
NOTE: If cooling is required, the compressors will have to be run manually. Make sure to switch it off again when the water has reached an acceptable temperature.
The staging did not work properly this morning. Dave Morris have been contacted and will look into it. |
|
2694
|
Friday, September 27, 2024, 07:29 |
David Wang | Conditioning Station | Repair | | | TCS water system resistivity analyzer has been repaired. |
TCS water system resistivity analyzer has been repaired. Two diodes and one capacitor on PS board were broken. They were replaced. Installed analyzer back and tested it in system. it works fine. Operator closed e-fault, removed force on TS5, and enabled alarm on TS5 and TC1. |
|
1391
|
Thursday, November 03, 2016, 09:01 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS water system has been started for TM4. |
The system works fine. All water signals to TM4 at TCS are normal. HV cover is installed on to TM4 at TCS. |
|
2708
|
Thursday, October 24, 2024, 10:37 |
David Wang | Conditioning Station | Standard Operation | | | TCS water system functionnal test. |
TCS water system has been started for functional test. System parameters including pressure, all temperature sensors, flow rate sensors, resistivity are ok. I will watch on chiller CP1/2/3 in rest of the week and make sure chiller CP1/2/ 3 auto stage in/out work fine. |
|
2606
|
Wednesday, June 05, 2024, 11:32 |
David Wang | Conditioning Station | Standard Operation | | | TCS water system filters have been changed. |
TCS water system five filters were changed yesterday by plant group Dan.T. Service labels on filters are updated. No water leak after job. |
|
1217
|
Thursday, April 28, 2016, 06:28 |
David Wang | Conditioning Station | Maintenance | TM2 | | TCS water system are turned off. |
TCS water system worked fine overnight. I turned off TCS water system at 6:16 AM this morning. Start of purging TM2 water lines for helium pressure test again this morning.
2016-4-28 7:58AM. Disconnected TM2 water lines at TCS. Purged them with compression air each for 5 minutes. |
|
1408
|
Tuesday, November 29, 2016, 06:27 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS water pumps are stopped |
Argon venting on TCS and TM2 is processing |
|
2454
|
Monday, June 12, 2023, 07:36 |
David Wang | Conditioning Station | Standard Operation | | | TCS water filters annual change. |
Plant group changed TCS water filters last Friday. 4 filters on resin can inet /outlet sides and filters(4 in one cartridge house)on pump return line have been changed. Triumf maintenance tags on filters have been updated. No water leak after job. The TCS TK2 water level dropped from 20" to 16" because of the job. I will refill the level to 28" today.
TCS:TK2 is refilled to 28". |
|
2585
|
Wednesday, May 08, 2024, 12:36 |
David Wang | Conditioning Station | Standard Operation | TM3 | UCx#44 | TCS was argon vented this morning between 7:00 to 8:30 am. |
TCS was argon vented this morning between 7:00 to 8:30 am before module was moved to ITE. |
|
2600
|
Tuesday, May 28, 2024, 07:45 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx#45 | TCS was argon vented this morning between 6:00 and 7:30am. |
TCS was argon vented this morning between 6:00 and 7:30am for TM4 moving to ITW. |
|
2049
|
Tuesday, January 14, 2020, 10:19 |
David Wang | Conditioning Station | Standard Operation | TM3 | | TCS vacuum system is switched off. |
TM3 TP1 and TP2 work fine in past 4 days. During operation, The current draw on pumps were 0.7A to 0.8 A. TM3 will be moved back to silo tomorrow. |
|
2067
|
Friday, February 14, 2020, 14:06 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS vacuum system and water sytem are switched on. |
All turbo pumps are started. |
|
1849
|
Wednesday, January 09, 2019, 06:26 |
David Wang | Conditioning Station | Standard Operation | | | TCS vacuum pumps have been stopped. |
The tCS will be vented soon for TM2 move later this week. |
|
1866
|
Thursday, February 14, 2019, 07:13 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS vacuum pumps have been stopped. |
Preparation on TM2 move from TCS to SHC. |
|
1894
|
Monday, March 18, 2019, 07:25 |
David Wang | Conditioning Station | Maintenance | TM3 | | TCS vacuum pumps have been stopped. |
The TCS will be vented soon for TM2 move. |
|
1400
|
Tuesday, November 22, 2016, 14:26 |
David Wang | Conditioning Station | Standard Operation | | | TCS vacuum pumps are switched off |
TCS will be vented tomorrow morning for TM2 moving. |
|
490
|
Friday, October 04, 2013, 19:39 |
Grant Minor | Conditioning Station | Standard Operation | TM3 | NiO#2 | TCS vacuum improvement w/ heaters off - 2:20 pm to 7:17pm |
Here is the change in the TCS vacuum after heaters were turned off earlier today:
2:20 pm readings
TCS:IG1 (service cap) 9.3 x 10^-7 Torr
TCS:IG2 (diagnostics box) 5.71 x 10^-6 Torr
TCS:IG1S (secondary vacuum) 4.0 x 10^-6 Torr
7:17 pm readings
TCS:IG1 (service cap) 8.69 x 10^-7 Torr
TCS:IG2 (diagnostics box) 5.0 x 10^-6 Torr
TCS:IG1S (secondary vacuum) 3.38 x 10^-6 Torr |
|
1540
|
Wednesday, May 17, 2017, 08:35 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS turbo pumps was started yesterday |
Anders started TCS turbo-pumps yesterday. The TCS and TM4 pumping down is good so far. I started TCS water pumps this morning for TCS water flow check.
2017-05-17 morning: Stopped the water pumps. The field around the TM4 is high because of spent target in SHC. The water flow measurement will be delayed to this Friday. |