Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2298     Entry time: Monday, January 24, 2022, 11:18
Author: David Wang 
Category: ITE/ITW 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: TH emergency exit hatch functional check 

TH emergency exit hatch which is located on TH west end roof is opened and closed for functional check. The hatch works fine. The limit switch on hatch is in position. No obstacle on hatch way to the roof. 

ELOG V2.9.2-2455