2252
|
Monday, October 04, 2021, 09:27 |
Frank Song | ITW | Standard Operation | TM2 | C#3 | Module Connection |
TM2 been connected with new target C#3 in ITW. |
Attachment 1: IMG_3711.jpg
|
|
Attachment 2: IMG_3712.jpg
|
|
Attachment 3: IMG_3713.jpg
|
|
Attachment 4: IMG_3714.jpg
|
|
2253
|
Monday, October 04, 2021, 09:33 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | C#3 | TM2 with target connection test |
the test was done when TM2 sit on NHC. |
Attachment 1: IMG_3710.jpg
|
|
2254
|
Monday, October 04, 2021, 09:37 |
Frank Song | ITE | Standard Operation | TM4 | Sic#41 | module disconnection |
TM4 was disconnected and moved to NHC. |
Attachment 1: IMG_3715.jpg
|
|
Attachment 2: IMG_3716.jpg
|
|
Attachment 3: IMG_3717.jpg
|
|
2257
|
Friday, October 08, 2021, 11:19 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#35 | TM4 IGLIS target electrical tests |
the tests were done when TM4 was on NHC. see attached photos please. |
Attachment 1: IMG_3739.jpg
|
|
Attachment 2: IMG_3740.jpg
|
|
2258
|
Friday, October 08, 2021, 12:39 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | Module Connection |
the module with target UC#35 was connected in ITE and being pumped down. |
Attachment 1: IMG_3742.jpg
|
|
Attachment 2: IMG_3741.jpg
|
|
Attachment 3: IMG_3743.jpg
|
|
Attachment 4: IMG_3744.jpg
|
|
2260
|
Tuesday, October 26, 2021, 11:01 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | shielding blocks transfer |
the five shielding blocks have been moved from ITW to ITE. |
2262
|
Tuesday, November 09, 2021, 09:58 |
Frank Song | ITW | Standard Operation | TM2 | C#3 | module disconnection |
the module TM2 with target C#3 was disconnected at ITW and is being remoted moving to SHC. |
Attachment 1: IMG_4315.jpg
|
|
2264
|
Wednesday, November 10, 2021, 08:29 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | UC#36 | electrical check |
An electrical check of TM2 with target UC#36 and no external connections was finished at SHC. |
Attachment 1: IMG_4322.JPG
|
|
2265
|
Wednesday, November 10, 2021, 08:32 |
Frank Song | ITW | Standard Operation | TM2 | UC#36 | Module Connection |
TM2 with target UC#36 was connected at ITW. |
Attachment 1: IMG_4323.JPG
|
|
2273
|
Tuesday, November 23, 2021, 10:46 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | module disconnection |
the TM4 with UCx#35 was disconnected in ITE. |
Attachment 1: IMG_4456_(2).JPG
|
|
2275
|
Wednesday, November 24, 2021, 07:17 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta #63 | TM4 SIS with Target and No external Connections |
the TM4 with new target Ta #63 installed in SHC and an electric check was made by David. |
Attachment 1: IMG_4469.JPG
|
|
2282
|
Wednesday, January 05, 2022, 09:38 |
Frank Song | ITE | Maintenance | TM4 | Ta #63 | TM4 SIS with Target and No external Connections |
electric check done in ITE. |
Attachment 1: tm4_with_Ta#63.jpg
|
|
2283
|
Wednesday, January 05, 2022, 12:45 |
Frank Song | ITW | Maintenance | TM2 | UC#36 | TM2 SIS with Target and No external Connections |
electrical checked in ITW |
Attachment 1: TM2_with_UCx36.jpg
|
|
2291
|
Monday, January 17, 2022, 10:44 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | UC#36 (the target removed) | TM2 electrical check without Target. |
An electric check was done right after module moving from SMP to SHC. |
Attachment 1: TM2_without_UCx36_at_SHC_(2).jpg
|
|
2292
|
Tuesday, January 18, 2022, 11:02 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #63 | TM4 SIS with Target and No external Connections |
David made an electric check after TM4 been moved to NHC from ITE. The target is still on the module. Please find out attached pic for detail. |
Attachment 1: tm4_with_Ta#63_on_NHC.jpg
|
|
2293
|
Wednesday, January 19, 2022, 09:00 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #63 | Electrical check on TM4 at NHC without target |
David did electrical check after target removed from TM4 at NHC. see attachment pls. |
Attachment 1: 20220119_080049.jpg
|
|
2305
|
Tuesday, February 15, 2022, 11:18 |
Frank Song | Cooling | Repair | | | Replace 2 leak valves on high active water system |
The valves #V10 & V11 beside high active water pumps were replaced in Target Hall, pics attached.
|
Attachment 1: v10_v11.jpg
|
|
Attachment 2: v10.jpg
|
|
Attachment 3: v11.jpg
|
|
2306
|
Wednesday, February 16, 2022, 15:19 |
Frank Song | Cooling | Repair | | | high active cooling water valves repaired/replaced |
A 3/8 inch drain valve on return cooling line was replaced in ITE. In the meantime two 1/2 inch valves labeled FEBIAD COIL and ENTRANCE COLLIMATOR RETURN at ITW were replaced . The 2 inches leaky supply/return water valves in ITW were repaired as well. Pls check pics
attached here for detail. |
Attachment 1: RETURN_drain_valve_in_ITE.jpg
|
|
Attachment 2: FEBIAD_COIL_in_ITW.jpg
|
|
Attachment 3: ENTRANCE_COLLIMATOR_RETURN_in_ITW.jpg
|
|
Attachment 4: MAIN_S_and_R_VALVES_in_ITW.jpg
|
|
2315
|
Thursday, April 21, 2022, 13:29 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Febiad TEST | TM2 FEBIAD WITH A TEST TARGET |
A Test Febiad Target was installed and checked at SHC. |
Attachment 1: TEST_FEBIAD_TARGET_E_CHECK.jpg
|
|
2316
|
Thursday, April 28, 2022, 07:24 |
Frank Song | ITW | Standard Operation | TM2 | Febiad Test Target | Module Connection |
TM2 was connected in ITW with a Febiad Test Target. |
Attachment 1: module_connection_checklist20220426.jpg
|
|