  RH-ISAC, Page 59 of 140  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Authordown Category Type Module Target/Number Subject
  2252   Monday, October 04, 2021, 09:27 Frank SongITWStandard OperationTM2C#3Module Connection

 TM2 been connected with new target C#3 in ITW. 

Attachment 1: IMG_3711.jpg
IMG_3711.jpg
Attachment 2: IMG_3712.jpg
IMG_3712.jpg
Attachment 3: IMG_3713.jpg
IMG_3713.jpg
Attachment 4: IMG_3714.jpg
IMG_3714.jpg
  2253   Monday, October 04, 2021, 09:33 Frank SongNorth Hot-CellStandard OperationTM2C#3TM2 with target connection test

 the test was done when TM2 sit on NHC.

Attachment 1: IMG_3710.jpg
IMG_3710.jpg
  2254   Monday, October 04, 2021, 09:37 Frank SongITEStandard OperationTM4Sic#41module disconnection

 TM4 was disconnected and moved to NHC. 

Attachment 1: IMG_3715.jpg
IMG_3715.jpg
Attachment 2: IMG_3716.jpg
IMG_3716.jpg
Attachment 3: IMG_3717.jpg
IMG_3717.jpg
  2257   Friday, October 08, 2021, 11:19 Frank SongNorth Hot-CellStandard OperationTM4UCx#35TM4 IGLIS target electrical tests

 the tests were done when TM4 was on NHC. see attached photos please.

Attachment 1: IMG_3739.jpg
IMG_3739.jpg
Attachment 2: IMG_3740.jpg
IMG_3740.jpg
  2258   Friday, October 08, 2021, 12:39 Frank SongITEStandard OperationTM4UCx#35Module Connection

 the module with target UC#35 was connected in ITE and being pumped down.

Attachment 1: IMG_3742.jpg
IMG_3742.jpg
Attachment 2: IMG_3741.jpg
IMG_3741.jpg
Attachment 3: IMG_3743.jpg
IMG_3743.jpg
Attachment 4: IMG_3744.jpg
IMG_3744.jpg
  2260   Tuesday, October 26, 2021, 11:01 Frank SongITEStandard OperationTM4UCx#35shielding blocks transfer

 the five shielding blocks have been moved from ITW to ITE. 

  2262   Tuesday, November 09, 2021, 09:58 Frank SongITWStandard OperationTM2C#3module disconnection

 the module TM2 with target C#3 was disconnected at ITW and is being remoted moving to SHC.

Attachment 1: IMG_4315.jpg
IMG_4315.jpg
  2264   Wednesday, November 10, 2021, 08:29 Frank SongSouth Hot-CellStandard OperationTM2UC#36electrical check

 An electrical check of TM2 with target UC#36 and no external connections was finished at SHC. 

Attachment 1: IMG_4322.JPG
IMG_4322.JPG
  2265   Wednesday, November 10, 2021, 08:32 Frank SongITWStandard OperationTM2UC#36Module Connection

 TM2 with target UC#36 was connected at ITW.

Attachment 1: IMG_4323.JPG
IMG_4323.JPG
  2273   Tuesday, November 23, 2021, 10:46 Frank SongITEStandard OperationTM4UCx#35module disconnection

 the TM4 with UCx#35 was disconnected in ITE.

Attachment 1: IMG_4456_(2).JPG
IMG_4456_(2).JPG
  2275   Wednesday, November 24, 2021, 07:17 Frank SongSouth Hot-CellStandard OperationTM4Ta #63TM4 SIS with Target and No external Connections

the TM4 with new target Ta #63 installed in SHC and an electric check was made by David. 

Attachment 1: IMG_4469.JPG
IMG_4469.JPG
  2282   Wednesday, January 05, 2022, 09:38 Frank SongITEMaintenanceTM4Ta #63TM4 SIS with Target and No external Connections

 electric check done in ITE. 

Attachment 1: tm4_with_Ta#63.jpg
tm4_with_Ta#63.jpg
  2283   Wednesday, January 05, 2022, 12:45 Frank SongITWMaintenanceTM2UC#36TM2 SIS with Target and No external Connections

 electrical checked in ITW

Attachment 1: TM2_with_UCx36.jpg
TM2_with_UCx36.jpg
  2291   Monday, January 17, 2022, 10:44 Frank SongSouth Hot-CellStandard OperationTM2UC#36 (the target removed)TM2 electrical check without Target.

 An electric check was done right after module moving from SMP to SHC. 

Attachment 1: TM2_without_UCx36_at_SHC_(2).jpg
TM2_without_UCx36_at_SHC_(2).jpg
  2292   Tuesday, January 18, 2022, 11:02 Frank SongNorth Hot-CellStandard OperationTM4Ta #63TM4 SIS with Target and No external Connections

 David made an electric check after TM4 been moved to NHC from ITE. The target is still on the module. Please find out attached pic for detail.

Attachment 1: tm4_with_Ta#63_on_NHC.jpg
tm4_with_Ta#63_on_NHC.jpg
  2293   Wednesday, January 19, 2022, 09:00 Frank SongNorth Hot-CellStandard OperationTM4Ta #63Electrical check on TM4 at NHC without target

 David did electrical check after target removed from TM4 at NHC. see attachment pls.

Attachment 1: 20220119_080049.jpg
20220119_080049.jpg
  2305   Tuesday, February 15, 2022, 11:18 Frank SongCoolingRepair  Replace 2 leak valves on high active water system

 The valves #V10 & V11 beside high active water pumps were replaced in Target Hall, pics attached.

 

Attachment 1: v10_v11.jpg
v10_v11.jpg
Attachment 2: v10.jpg
v10.jpg
Attachment 3: v11.jpg
v11.jpg
  2306   Wednesday, February 16, 2022, 15:19 Frank SongCoolingRepair  high active cooling water valves repaired/replaced

 A 3/8 inch drain valve on return cooling line was replaced in ITE. In the meantime two 1/2 inch valves labeled FEBIAD COIL and ENTRANCE COLLIMATOR RETURN at ITW were replaced . The 2 inches leaky supply/return water valves in ITW were repaired as well. Pls check pics

attached here for detail.

Attachment 1: RETURN_drain_valve_in_ITE.jpg
RETURN_drain_valve_in_ITE.jpg
Attachment 2: FEBIAD_COIL_in_ITW.jpg
FEBIAD_COIL_in_ITW.jpg
Attachment 3: ENTRANCE_COLLIMATOR_RETURN_in_ITW.jpg
ENTRANCE_COLLIMATOR_RETURN_in_ITW.jpg
Attachment 4: MAIN_S_and_R_VALVES_in_ITW.jpg
MAIN_S_and_R_VALVES_in_ITW.jpg
  2315   Thursday, April 21, 2022, 13:29 Frank SongSouth Hot-CellStandard OperationTM2Febiad TESTTM2 FEBIAD WITH A TEST TARGET

 A Test Febiad Target was installed and checked at SHC. 

Attachment 1: TEST_FEBIAD_TARGET_E_CHECK.jpg
TEST_FEBIAD_TARGET_E_CHECK.jpg
  2316   Thursday, April 28, 2022, 07:24 Frank SongITWStandard OperationTM2Febiad Test TargetModule Connection

 TM2 was connected in ITW with a Febiad Test Target. 

Attachment 1: module_connection_checklist20220426.jpg
module_connection_checklist20220426.jpg