  2273   Tuesday, November 23, 2021, 10:46 Frank SongITEStandard OperationTM4UCx#35module disconnection

 the TM4 with UCx#35 was disconnected in ITE.

Attachment 1: IMG_4456_(2).JPG
IMG_4456_(2).JPG
  2275   Wednesday, November 24, 2021, 07:17 Frank SongSouth Hot-CellStandard OperationTM4Ta #63TM4 SIS with Target and No external Connections

the TM4 with new target Ta #63 installed in SHC and an electric check was made by David. 

Attachment 1: IMG_4469.JPG
IMG_4469.JPG
  2282   Wednesday, January 05, 2022, 09:38 Frank SongITEMaintenanceTM4Ta #63TM4 SIS with Target and No external Connections

 electric check done in ITE. 

Attachment 1: tm4_with_Ta#63.jpg
tm4_with_Ta#63.jpg
  2283   Wednesday, January 05, 2022, 12:45 Frank SongITWMaintenanceTM2UC#36TM2 SIS with Target and No external Connections

 electrical checked in ITW

Attachment 1: TM2_with_UCx36.jpg
TM2_with_UCx36.jpg
  2291   Monday, January 17, 2022, 10:44 Frank SongSouth Hot-CellStandard OperationTM2UC#36 (the target removed)TM2 electrical check without Target.

 An electric check was done right after module moving from SMP to SHC. 

Attachment 1: TM2_without_UCx36_at_SHC_(2).jpg
TM2_without_UCx36_at_SHC_(2).jpg
  2292   Tuesday, January 18, 2022, 11:02 Frank SongNorth Hot-CellStandard OperationTM4Ta #63TM4 SIS with Target and No external Connections

 David made an electric check after TM4 been moved to NHC from ITE. The target is still on the module. Please find out attached pic for detail.

Attachment 1: tm4_with_Ta#63_on_NHC.jpg
tm4_with_Ta#63_on_NHC.jpg
  2293   Wednesday, January 19, 2022, 09:00 Frank SongNorth Hot-CellStandard OperationTM4Ta #63Electrical check on TM4 at NHC without target

 David did electrical check after target removed from TM4 at NHC. see attachment pls.

Attachment 1: 20220119_080049.jpg
20220119_080049.jpg
  2305   Tuesday, February 15, 2022, 11:18 Frank SongCoolingRepair  Replace 2 leak valves on high active water system

 The valves #V10 & V11 beside high active water pumps were replaced in Target Hall, pics attached.

 

Attachment 1: v10_v11.jpg
v10_v11.jpg
Attachment 2: v10.jpg
v10.jpg
Attachment 3: v11.jpg
v11.jpg
  2306   Wednesday, February 16, 2022, 15:19 Frank SongCoolingRepair  high active cooling water valves repaired/replaced

 A 3/8 inch drain valve on return cooling line was replaced in ITE. In the meantime two 1/2 inch valves labeled FEBIAD COIL and ENTRANCE COLLIMATOR RETURN at ITW were replaced . The 2 inches leaky supply/return water valves in ITW were repaired as well. Pls check pics

attached here for detail.

Attachment 1: RETURN_drain_valve_in_ITE.jpg
RETURN_drain_valve_in_ITE.jpg
Attachment 2: FEBIAD_COIL_in_ITW.jpg
FEBIAD_COIL_in_ITW.jpg
Attachment 3: ENTRANCE_COLLIMATOR_RETURN_in_ITW.jpg
ENTRANCE_COLLIMATOR_RETURN_in_ITW.jpg
Attachment 4: MAIN_S_and_R_VALVES_in_ITW.jpg
MAIN_S_and_R_VALVES_in_ITW.jpg
  2315   Thursday, April 21, 2022, 13:29 Frank SongSouth Hot-CellStandard OperationTM2Febiad TESTTM2 FEBIAD WITH A TEST TARGET

 A Test Febiad Target was installed and checked at SHC. 

Attachment 1: TEST_FEBIAD_TARGET_E_CHECK.jpg
TEST_FEBIAD_TARGET_E_CHECK.jpg
  2316   Thursday, April 28, 2022, 07:24 Frank SongITWStandard OperationTM2Febiad Test TargetModule Connection

 TM2 was connected in ITW with a Febiad Test Target. 

Attachment 1: module_connection_checklist20220426.jpg
module_connection_checklist20220426.jpg
  2321   Wednesday, May 18, 2022, 13:52 Frank SongSouth Hot-CellStandard OperationTM4UCx#37electrical check

 The TM4 with installed target #UCx37 had been electric checked at SHC. PICs attached.

Attachment 1: 1.jpg
1.jpg
Attachment 2: 2.jpg
2.jpg
Attachment 3: 3.jpg
3.jpg
  2323   Thursday, May 19, 2022, 15:05 Frank SongITEStandard OperationTM4UCx#37UCx#37 P2N connection on TM4

 TM4 with UCx#37 was connected in ITE. Attachment available.

Attachment 1: 01_UCx37_P2N_connection_on_TM4.jpg
01_UCx37_P2N_connection_on_TM4.jpg
Attachment 2: 02_UCx37_P2N_connection_on_TM4.jpg
02_UCx37_P2N_connection_on_TM4.jpg
Attachment 3: 03_UCx37_P2N_connection_on_TM4.jpg
03_UCx37_P2N_connection_on_TM4.jpg
  2326   Wednesday, May 25, 2022, 13:43 Frank SongITWStandard OperationTM2Febiad-Testmodule disconnection

 TM2 with a test target was disconnected in ITW.

Attachment 1: tm2_disconnection.jpg
tm2_disconnection.jpg
  2327   Monday, June 06, 2022, 14:15 Frank SongSouth Hot-CellStandard OperationTM2SiC#42TM2 FEBIAD with Target and No external Connections

 An electrical check was done at SHC for TM2 with FEBIAD SiC #42 Target. 

Attachment 1: TM2_with_FEBIAD_SiC_42_electrical_check.jpg
TM2_with_FEBIAD_SiC_42_electrical_check.jpg
  2328   Tuesday, June 07, 2022, 14:15 Frank SongITE/ITWStandard OperationTM2SiC#42Module Connection

 TM2 with Febiad target SiC#42 was connected in ITW.

Attachment 1: TM2_with_sic_42_connected_in_ITW.jpg
TM2_with_sic_42_connected_in_ITW.jpg
  2330   Monday, June 20, 2022, 11:00 Frank SongNorth Hot-CellRepairTM2SiC#42Failed Sic#42 electrical measurement at NHC

 An electrical check was done at NHC, see attachment pls.

Attachment 1: Failed_Sic#42_electrical_measurement_at_NHC.jpg
Failed_Sic#42_electrical_measurement_at_NHC.jpg
  2331   Monday, June 20, 2022, 18:03 Frank SongSouth Hot-CellStandard OperationTM2Sic#43electrical check

 TM2 with new target SiC#43 was electrical checked at SHC. please see attachment.

Attachment 1: TM2_with_SiC43.jpg
TM2_with_SiC43.jpg
  2333   Tuesday, June 21, 2022, 17:49 Frank SongITEStandard OperationTM4UCx#37TM4 disconnection

 the module with target UCx37 was disconnected in ITE.

Attachment 1: TM4_with_UCx#37_disconnection_in_ITE.jpg
TM4_with_UCx#37_disconnection_in_ITE.jpg
  2334   Tuesday, June 21, 2022, 18:30 Frank SongITWStandard OperationTM2SiC#43 FebiadModule Connection

 TM2 with Febiad Target SiC #43 was connected in ITW. NOTE: the number of TARGET in attached picture should be #43. 

Attachment 1: TM2_with_sic_42_connected_in_ITW.jpg
TM2_with_sic_42_connected_in_ITW.jpg