Monday, October 04, 2021, 09:27, Frank Song, ITW, Standard Operation, TM2, C#3, Module Connection   
|
TM2 been connected with new target C#3 in ITW. |
Monday, October 04, 2021, 09:33, Frank Song, North Hot-Cell, Standard Operation, TM2, C#3, TM2 with target connection test
|
the test was done when TM2 sit on NHC. |
Monday, October 04, 2021, 09:37, Frank Song, ITE, Standard Operation, TM4, Sic#41, module disconnection  
|
TM4 was disconnected and moved to NHC. |
Friday, October 08, 2021, 11:19, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#35, TM4 IGLIS target electrical tests 
|
the tests were done when TM4 was on NHC. see attached photos please. |
Friday, October 08, 2021, 12:39, Frank Song, ITE, Standard Operation, TM4, UCx#35, Module Connection   
|
the module with target UC#35 was connected in ITE and being pumped down. |
Tuesday, October 26, 2021, 11:01, Frank Song, ITE, Standard Operation, TM4, UCx#35, shielding blocks transfer
|
the five shielding blocks have been moved from ITW to ITE. |
Tuesday, November 09, 2021, 09:58, Frank Song, ITW, Standard Operation, TM2, C#3, module disconnection
|
the module TM2 with target C#3 was disconnected at ITW and is being remoted moving to SHC. |
Wednesday, November 10, 2021, 08:29, Frank Song, South Hot-Cell, Standard Operation, TM2, UC#36, electrical check
|
An electrical check of TM2 with target UC#36 and no external connections was finished at SHC. |
Wednesday, November 10, 2021, 08:32, Frank Song, ITW, Standard Operation, TM2, UC#36, Module Connection
|
TM2 with target UC#36 was connected at ITW. |
Tuesday, November 23, 2021, 10:46, Frank Song, ITE, Standard Operation, TM4, UCx#35, module disconnection
|
the TM4 with UCx#35 was disconnected in ITE. |
Wednesday, November 24, 2021, 07:17, Frank Song, South Hot-Cell, Standard Operation, TM4, Ta #63, TM4 SIS with Target and No external Connections
|
the TM4 with new target Ta #63 installed in SHC and an electric check was made by David. |
Wednesday, January 05, 2022, 09:38, Frank Song, ITE, Maintenance, TM4, Ta #63, TM4 SIS with Target and No external Connections
|
electric check done in ITE. |
Wednesday, January 05, 2022, 12:45, Frank Song, ITW, Maintenance, TM2, UC#36, TM2 SIS with Target and No external Connections
|
electrical checked in ITW |
Monday, January 17, 2022, 10:44, Frank Song, South Hot-Cell, Standard Operation, TM2, UC#36 (the target removed), TM2 electrical check without Target.
|
An electric check was done right after module moving from SMP to SHC. |
Tuesday, January 18, 2022, 11:02, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #63, TM4 SIS with Target and No external Connections
|
David made an electric check after TM4 been moved to NHC from ITE. The target is still on the module. Please find out attached pic for detail. |
Wednesday, January 19, 2022, 09:00, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #63, Electrical check on TM4 at NHC without target
|
David did electrical check after target removed from TM4 at NHC. see attachment pls. |
Tuesday, February 15, 2022, 11:18, Frank Song, Cooling, Repair, , , Replace 2 leak valves on high active water system  
|
The valves #V10 & V11 beside high active water pumps were replaced in Target Hall, pics attached.
|
Wednesday, February 16, 2022, 15:19, Frank Song, Cooling, Repair, , , high active cooling water valves repaired/replaced   
|
A 3/8 inch drain valve on return cooling line was replaced in ITE. In the meantime two 1/2 inch valves labeled FEBIAD COIL and ENTRANCE COLLIMATOR
RETURN at ITW were replaced . The 2 inches leaky supply/return water valves in ITW were repaired as well. Pls check pics
attached here for detail. |
Thursday, April 21, 2022, 13:29, Frank Song, South Hot-Cell, Standard Operation, TM2, Febiad TEST, TM2 FEBIAD WITH A TEST TARGET
|
A Test Febiad Target was installed and checked at SHC. |
Thursday, April 28, 2022, 07:24, Frank Song, ITW, Standard Operation, TM2, Febiad Test Target, Module Connection
|
TM2 was connected in ITW with a Febiad Test Target. |
|