ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
2273
|
Tuesday, November 23, 2021, 10:46 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | module disconnection |
the TM4 with UCx#35 was disconnected in ITE. |
Attachment 1: IMG_4456_(2).JPG
|
|
2275
|
Wednesday, November 24, 2021, 07:17 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta #63 | TM4 SIS with Target and No external Connections |
the TM4 with new target Ta #63 installed in SHC and an electric check was made by David. |
Attachment 1: IMG_4469.JPG
|
|
2282
|
Wednesday, January 05, 2022, 09:38 |
Frank Song | ITE | Maintenance | TM4 | Ta #63 | TM4 SIS with Target and No external Connections |
electric check done in ITE. |
Attachment 1: tm4_with_Ta#63.jpg
|
|
2283
|
Wednesday, January 05, 2022, 12:45 |
Frank Song | ITW | Maintenance | TM2 | UC#36 | TM2 SIS with Target and No external Connections |
electrical checked in ITW |
Attachment 1: TM2_with_UCx36.jpg
|
|
2291
|
Monday, January 17, 2022, 10:44 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | UC#36 (the target removed) | TM2 electrical check without Target. |
An electric check was done right after module moving from SMP to SHC. |
Attachment 1: TM2_without_UCx36_at_SHC_(2).jpg
|
|
2292
|
Tuesday, January 18, 2022, 11:02 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #63 | TM4 SIS with Target and No external Connections |
David made an electric check after TM4 been moved to NHC from ITE. The target is still on the module. Please find out attached pic for detail. |
Attachment 1: tm4_with_Ta#63_on_NHC.jpg
|
|
2293
|
Wednesday, January 19, 2022, 09:00 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #63 | Electrical check on TM4 at NHC without target |
David did electrical check after target removed from TM4 at NHC. see attachment pls. |
Attachment 1: 20220119_080049.jpg
|
|
2305
|
Tuesday, February 15, 2022, 11:18 |
Frank Song | Cooling | Repair | | | Replace 2 leak valves on high active water system |
The valves #V10 & V11 beside high active water pumps were replaced in Target Hall, pics attached.
|
Attachment 1: v10_v11.jpg
|
|
Attachment 2: v10.jpg
|
|
Attachment 3: v11.jpg
|
|
2306
|
Wednesday, February 16, 2022, 15:19 |
Frank Song | Cooling | Repair | | | high active cooling water valves repaired/replaced |
A 3/8 inch drain valve on return cooling line was replaced in ITE. In the meantime two 1/2 inch valves labeled FEBIAD COIL and ENTRANCE COLLIMATOR RETURN at ITW were replaced . The 2 inches leaky supply/return water valves in ITW were repaired as well. Pls check pics
attached here for detail. |
Attachment 1: RETURN_drain_valve_in_ITE.jpg
|
|
Attachment 2: FEBIAD_COIL_in_ITW.jpg
|
|
Attachment 3: ENTRANCE_COLLIMATOR_RETURN_in_ITW.jpg
|
|
Attachment 4: MAIN_S_and_R_VALVES_in_ITW.jpg
|
|
2315
|
Thursday, April 21, 2022, 13:29 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Febiad TEST | TM2 FEBIAD WITH A TEST TARGET |
A Test Febiad Target was installed and checked at SHC. |
Attachment 1: TEST_FEBIAD_TARGET_E_CHECK.jpg
|
|
2316
|
Thursday, April 28, 2022, 07:24 |
Frank Song | ITW | Standard Operation | TM2 | Febiad Test Target | Module Connection |
TM2 was connected in ITW with a Febiad Test Target. |
Attachment 1: module_connection_checklist20220426.jpg
|
|
2321
|
Wednesday, May 18, 2022, 13:52 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | UCx#37 | electrical check |
The TM4 with installed target #UCx37 had been electric checked at SHC. PICs attached. |
Attachment 1: 1.jpg
|
|
Attachment 2: 2.jpg
|
|
Attachment 3: 3.jpg
|
|
2323
|
Thursday, May 19, 2022, 15:05 |
Frank Song | ITE | Standard Operation | TM4 | UCx#37 | UCx#37 P2N connection on TM4 |
TM4 with UCx#37 was connected in ITE. Attachment available. |
Attachment 1: 01_UCx37_P2N_connection_on_TM4.jpg
|
|
Attachment 2: 02_UCx37_P2N_connection_on_TM4.jpg
|
|
Attachment 3: 03_UCx37_P2N_connection_on_TM4.jpg
|
|
2326
|
Wednesday, May 25, 2022, 13:43 |
Frank Song | ITW | Standard Operation | TM2 | Febiad-Test | module disconnection |
TM2 with a test target was disconnected in ITW. |
Attachment 1: tm2_disconnection.jpg
|
|
2327
|
Monday, June 06, 2022, 14:15 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | SiC#42 | TM2 FEBIAD with Target and No external Connections |
An electrical check was done at SHC for TM2 with FEBIAD SiC #42 Target. |
Attachment 1: TM2_with_FEBIAD_SiC_42_electrical_check.jpg
|
|
2328
|
Tuesday, June 07, 2022, 14:15 |
Frank Song | ITE/ITW | Standard Operation | TM2 | SiC#42 | Module Connection |
TM2 with Febiad target SiC#42 was connected in ITW. |
Attachment 1: TM2_with_sic_42_connected_in_ITW.jpg
|
|
2330
|
Monday, June 20, 2022, 11:00 |
Frank Song | North Hot-Cell | Repair | TM2 | SiC#42 | Failed Sic#42 electrical measurement at NHC |
An electrical check was done at NHC, see attachment pls. |
Attachment 1: Failed_Sic#42_electrical_measurement_at_NHC.jpg
|
|
2331
|
Monday, June 20, 2022, 18:03 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Sic#43 | electrical check |
TM2 with new target SiC#43 was electrical checked at SHC. please see attachment. |
Attachment 1: TM2_with_SiC43.jpg
|
|
2333
|
Tuesday, June 21, 2022, 17:49 |
Frank Song | ITE | Standard Operation | TM4 | UCx#37 | TM4 disconnection |
the module with target UCx37 was disconnected in ITE. |
Attachment 1: TM4_with_UCx#37_disconnection_in_ITE.jpg
|
|
2334
|
Tuesday, June 21, 2022, 18:30 |
Frank Song | ITW | Standard Operation | TM2 | SiC#43 Febiad | Module Connection |
TM2 with Febiad Target SiC #43 was connected in ITW. NOTE: the number of TARGET in attached picture should be #43. |
Attachment 1: TM2_with_sic_42_connected_in_ITW.jpg
|
|