Entry  Tuesday, August 27, 2024, 13:30, Frank Song, ITW, Maintenance, TM3, TiC#8, module disconnection TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf

 TM3 is disconnected and all water lines are purged/refilled with 50psi Nitrogen. Pls see pics attached with.

Entry  Tuesday, September 03, 2024, 11:40, David Wang, ITW, Standard Operation, TM3, TiC#8, TM3 has been moved from ITW to S-W silo. 

TM3 has been moved from ITW to S-W silo. The move is smooth.

Entry  Wednesday, September 18, 2024, 13:40, Aaron Tam, South Hot-Cell, Standard Operation, TM3, TiC#8, Target removal  13x

 TiC#8 HP FEBIAD removed from TM3

Target sitting in SHC

1 Coil Conductor bolt fell under source tray 

Photo Dump uploaded

Entry  Wednesday, September 18, 2024, 13:47, David Wang, South Hot-Cell, Standard Operation, TM3, TiC#8, Tm3 has been moved from silo to SHC. 

Tm3 has been moved  from silo to SHC. The move is smooth.

Entry  Monday, September 23, 2024, 11:26, David Wang, South Hot-Cell, Standard Operation, TM3, , TM3 window line has been leak checked.  

TM3 window line has been leak checked after containment box removal and installation for insulator installation on water cup C.   No leak.

Entry  Monday, September 23, 2024, 11:31, David Wang, South Hot-Cell, Development, TM3, , 10 pins lectrical check result after insulator is installed on water cap C.  

10 pins lectrical check result after insulator is installed on water cap C.

pin 14 to 60kv bias has 20 Kohm @250V Megga check. The rest check on ohmmeter and megga @250 are either OLor over 25Mohm which are good.

Entry  Monday, September 23, 2024, 16:06, Aaron Tam, South Hot-Cell, Repair, TM3, , Insulator Addition to Water block c02c089c-d2f0-4ddb-9f06-3dd8b8d05afa.jfif0fd6eb03-7d82-48af-8ef7-99fd481bf1aa.jfif14247104-53dc-4b00-852d-3a860c4baeb8.jfif

 September 23, 2024 - C. Fisher 

  • Containment box removed
  • Insulator installed
  • New window line VCR seals installed
  • Dropped bolt from TiC#8 removed
  • Containment box reinstalled

September 23, 2024 - A. Tam

  • Containment box cover reinstalled 

Photos attached 

Entry  Wednesday, September 25, 2024, 09:12, David Wang, South Hot-Cell, Maintenance, TM3, , Tm3 has been moved from SHC to silo. 

Tm3 has been moved  from SHC to silo. the move is smooth.

Entry  Monday, November 25, 2024, 09:56, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 move - silo to SHC 

TM3 was moved from silo to SHC with no target. Move successful.

Entry  Tuesday, November 26, 2024, 13:03, Frank Song, South Hot-Cell, Standard Operation, TM3, UCx#47, electrical check/leak check TM3_with_new_target_UCx#47_electrical_check_on_SHC_2024-11-26.pdf

An electrical check and leak check had been done after new target UCx47 was installed on TM3 in SHC. see attachment pls.

Entry  Tuesday, November 26, 2024, 13:54, Adam Newsome, Conditioning Station, Standard Operation, TM3, , TM3 move - SHC to TCS 

TM3 was moved from SHC to TCS with UCx#47. The move was smooth.

Entry  Tuesday, November 26, 2024, 14:52, Aaron Tam, South Hot-Cell, Standard Operation, TM3, UCx#47 , UC#47 LP-SIS w/ gas Install 6x

 November 26, 2024 - Aaron Tam 

Handover from TPO and inspection

  • Completed
  • Some modification to the center Inner-Outer conductor had to be made (hole enlarged as tab was slightly short)

Target Insertion:

  • Successful 

Target Mounting:

  • Upon fully seating UC#47 on service tray locating pins, the gas line VCR gasket came off 
    • Operator doesn't have line-of-sight to this area, so there has to be healthy clearance (Foreshadowing) 
    • Gas line VCR gasket reinstalled using manipulators  
  • 2nd seating of UC#47 on service tray locating pins, the gas line VCR gasket came off again
    • Some alignment interference with the gas line coupling is the cause of the gasket falling off during placement (photo attached)
    • Gas line on service tray was loosened, raised to highest position and fastened (Photo attached)
    • Failed to re-install VCR gasket (Plastic separated from gasket material)
  • Target removed from Hot cell to reinstall gaskets and make modifications to the gas-line coupling
    • Gas line coil plastically deformed to give less of a spring action so the coupling can stay down under friction until it is time to couple
    • Target carefully inserted into hot cell without disturbing spring/friction of gas-line coupling. 
      • This had to be repeated several times. Once for the waterline gaskets coming off, and a few other times to insert the target/tray without disturbing sprung coupling
  • Target mounted without issue after the above steps successfully 

Gas and Water Services:

  • VCR connections coupled 
  • Leak test passed
    • leak test faster today because module had been left in silo for a long time to dry out. 
  • Gas line no-longer needed, so was not checked

Electrical Services:

  • Conductor bolts installed
  • All bolts (including mounting bolts) checked for fit with mirror
  • Coil conductor bolts torqued to at least 130inch-lbs 
  • Electrical test completed 

Containment box panel reinstalled 

Cleared area around module for craning out. 

 

Entry  Wednesday, December 04, 2024, 08:05, Frank Song, ITE, Standard Operation, TM3, UCx#47, Module Connection TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf

TM3 with new target UCx#47 was connected in ITE right after be moved from TCS. 

Entry  Monday, December 09, 2024, 13:10, Frank Song, 5 Shielding Blocks, Standard Operation, TM3, UCx#47, shielding blocks transfer 

 5 Shielding Blocks have been transferred from ITW to ITE. MAA is secured after moving.

Entry  Tuesday, January 07, 2025, 12:05, David Wang, ITE, Standard Operation, TM3, UCx #47, ITE primary and secondary vacuum vessel leak check for 2025 shut down 

ITE primary and secondary vacuum vessel leak check for 2025 shut down have been done. No leak.  The TM3 waterlines helium pressure test will be done at TCS when module is there.

TM3 water lines helium pressure test  are done. 70 psi helium 3 minutes to each line( except HS which has no target on it ) . leak detector base leak rate :0.0Xe-9 atm.cc/sec. No leak on all tested water lines.Helium were purged out after test. and 60 psi nitrogen were filled in lines for storage. 

Entry  Monday, January 13, 2025, 10:36, Frank Song, ITE, Standard Operation, TM3, UCx#47, module disconnection TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf

 TM3 with spent target UCx#47 was disconnected in ITE and will be moved to SHC.

Entry  Tuesday, January 14, 2025, 10:00, David Wang, South Hot-Cell, Standard Operation, TM3, UCx#47, after operation electrical check, Tm3 UCx 47 TM3_UCX_47_after_operation_electrical_check.pdf

TM3 UCx#47 after operation electrical check  is done at SHC. The result is normal. See attachment.

Entry  Thursday, January 16, 2025, 14:21, David Wang, Conditioning Station, Standard Operation, TM3, No target, TM3 electrical check at TCS under good vacuum  TM3_electrical_check_@TCS_page_1.pdfTM3_electrical_check_@TCS_page_2.pdf

A complete TM3 electrical check at TCS under good vacuum has been done. Pin 14 to 60KV only has 8K ohm on ohmmeter check , and it's about 2Kohm @250V Megga. It's low in resistivity. The pin 14 is for thermocouples only so no big concern.  The rest things are good. See attachments.

Entry  Friday, November 01, 2013, 09:08, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, module move 

TM#2 has been moved from the north west silo to the south hot cell. The module has a field of about 3.1mSv/hr when it was lowered into the hot cell.

Entry  Monday, November 04, 2013, 10:46, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Exploration TM2_20131104.jpg

TM2 is now in the hot cell with the containment box off for inspection and eventual blank off off the water blocks.

Upon initail inspection the status (fron a hot cell point of view) is:

-Water block jig is equipped/on

-There is a thermocouple line that will need to be removed

-TM2 requires a new front containment box cover - already manufactured and waiting for installation

 