Entry  Tuesday, August 27, 2024, 13:30, Frank Song, ITW, Maintenance, TM3, TiC#8, module disconnection TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf
 TM3 is disconnected and all water lines are purged/refilled with 50psi Nitrogen. Pls see pics attached with.
Entry  Tuesday, September 03, 2024, 11:40, David Wang, ITW, Standard Operation, TM3, TiC#8, TM3 has been moved from ITW to S-W silo. 
TM3 has been moved from ITW to S-W silo. The move is smooth. 
Entry  Wednesday, September 18, 2024, 13:40, Aaron Tam, South Hot-Cell, Standard Operation, TM3, TiC#8, Target removal  13x
 TiC#8 HP FEBIAD removed from TM3
Target sitting in SHC
1 Coil Conductor bolt fell under source tray 
Entry  Wednesday, September 18, 2024, 13:47, David Wang, South Hot-Cell, Standard Operation, TM3, TiC#8, Tm3 has been moved from silo to SHC. 
Tm3 has been moved  from silo to SHC. The move is smooth. 
Entry  Monday, September 23, 2024, 11:26, David Wang, South Hot-Cell, Standard Operation, TM3, , TM3 window line has been leak checked.  
TM3 window line has been leak checked after containment box removal and installation for insulator installation on water cup C.   No leak.
Entry  Monday, September 23, 2024, 11:31, David Wang, South Hot-Cell, Development, TM3, , 10 pins lectrical check result after insulator is installed on water cap C.  
10 pins lectrical check result after insulator is installed on water cap C. 
pin 14 to 60kv bias has 20 Kohm @250V Megga check. The rest check on ohmmeter and megga @250 are either OLor over 25Mohm which are good. 
Entry  Monday, September 23, 2024, 16:06, Aaron Tam, South Hot-Cell, Repair, TM3, , Insulator Addition to Water block c02c089c-d2f0-4ddb-9f06-3dd8b8d05afa.jfif0fd6eb03-7d82-48af-8ef7-99fd481bf1aa.jfif14247104-53dc-4b00-852d-3a860c4baeb8.jfif
 September 23, 2024 - C. Fisher 

    Containment box removed
    Insulator installed
    New window line VCR seals installed
    Dropped bolt
from TiC#8 removed
    Containment box reinstalled

September 23, 2024 - A. Tam
Entry  Wednesday, September 25, 2024, 09:12, David Wang, South Hot-Cell, Maintenance, TM3, , Tm3 has been moved from SHC to silo. 
Tm3 has been moved  from SHC to silo. the move is smooth.
Entry  Monday, November 25, 2024, 09:56, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 move - silo to SHC 
TM3 was moved from silo to SHC with no target. Move successful. 
Entry  Tuesday, November 26, 2024, 13:03, Frank Song, South Hot-Cell, Standard Operation, TM3, UCx#47, electrical check/leak check TM3_with_new_target_UCx#47_electrical_check_on_SHC_2024-11-26.pdf
An electrical check and leak check had been done after new target UCx47 was installed on TM3 in SHC. see attachment pls.
Entry  Tuesday, November 26, 2024, 13:54, Adam Newsome, Conditioning Station, Standard Operation, TM3, , TM3 move - SHC to TCS 
TM3 was moved from SHC to TCS with UCx#47. The move was smooth. 
Entry  Tuesday, November 26, 2024, 14:52, Aaron Tam, South Hot-Cell, Standard Operation, TM3, UCx#47 , UC#47 LP-SIS w/ gas Install 6x
 November 26, 2024 - Aaron Tam 
Handover from TPO and inspection

    Completed
    Some modification to the center Inner-Outer conductor had to be made (hole enlarged as tab was slightly short)

Target
Entry  Wednesday, December 04, 2024, 08:05, Frank Song, ITE, Standard Operation, TM3, UCx#47, Module Connection TM3_with_new_target_UCx#47_connection_in_ITE_2024-12-03.pdf
TM3 with new target UCx#47 was connected in ITE right after be moved from TCS. 
Entry  Monday, December 09, 2024, 13:10, Frank Song, 5 Shielding Blocks, Standard Operation, TM3, UCx#47, shielding blocks transfer 
 5 Shielding Blocks have been transferred from ITW to ITE. MAA is secured after moving.
Entry  Tuesday, January 07, 2025, 12:05, David Wang, ITE, Standard Operation, TM3, UCx #47, ITE primary and secondary vacuum vessel leak check for 2025 shut down 
ITE primary and secondary vacuum vessel leak check for 2025 shut down have been done. No leak.  The TM3 waterlines helium pressure test will be
done at TCS when module is there.
TM3 water lines helium pressure test  are done. 70 psi helium 3 minutes to each line( except HS which has no target on it ) . leak detector
Entry  Monday, January 13, 2025, 10:36, Frank Song, ITE, Standard Operation, TM3, UCx#47, module disconnection TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf
 TM3 with spent target UCx#47 was disconnected in ITE and will be moved to SHC.
Entry  Tuesday, January 14, 2025, 10:00, David Wang, South Hot-Cell, Standard Operation, TM3, UCx#47, after operation electrical check, Tm3 UCx 47 TM3_UCX_47_after_operation_electrical_check.pdf
TM3 UCx#47 after operation electrical check  is done at SHC. The result is normal. See attachment.
Entry  Thursday, January 16, 2025, 14:21, David Wang, Conditioning Station, Standard Operation, TM3, No target, TM3 electrical check at TCS under good vacuum  TM3_electrical_check_@TCS_page_1.pdfTM3_electrical_check_@TCS_page_2.pdf
A complete TM3 electrical check at TCS under good vacuum has been done. Pin 14 to 60KV only has 8K ohm on ohmmeter
check , and it's about 2Kohm @250V Megga. It's low in resistivity. The pin 14 is for thermocouples only so no big concern.  The rest things are good.
See attachments.
Entry  Friday, November 01, 2013, 09:08, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, module move 
TM#2 has been moved from the north west silo to the south hot cell. The module has a field of about 3.1mSv/hr when it was lowered into the hot cell.
Entry  Monday, November 04, 2013, 10:46, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Exploration TM2_20131104.jpg
TM2 is now in the hot cell with the containment box off for inspection and eventual blank off off the water blocks.
Upon initail inspection the status (fron a hot cell point of view) is:
-Water block jig is equipped/on