2610
|
Friday, June 14, 2024, 11:18 |
Frank Song | ITE | Standard Operation | TM3 | UCx#44 | module disconnection | TM3 with target UCx#44 was disconnected
in ITE. |
|
2611
|
Friday, June 14, 2024, 11:55 |
David Wang | South Hot-Cell | Standard Operation | TM3 | UCx#44 | TM3 UCx#44 after operation electrical check at SHC | TM3 UCx#44 after operation electrical check
at SHC . see attachment.
Carla: Looks like the short on the |
|
2612
|
Friday, June 14, 2024, 11:56 |
David Wang | ITE | Standard Operation | TM3 | UCx#44 | Tm3 has been moved form ITE to SHC. | Tm3 has been moved form ITE to SHC. the
move is smooth. |
|
2615
|
Monday, June 17, 2024, 17:24 |
Carla Babcock | ITE | Development | TM3 | UCx#44 | Status of gas system prototype in ITE | A new gas system for FEBIAD operation was
installed in ITE to enable us to use a calibrated
leak which is attached to the target heat |
|
2616
|
Tuesday, June 18, 2024, 11:59 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | Tm3 electrical check without target. | Tm3 electrical check without target is
done. Everything is good including 2 x 5
pin connectors( all OL at 250 V to 60 KV |
|
2620
|
Wednesday, June 19, 2024, 14:11 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | TM3 has been moved from SHC to TCS. | TM3 has been moved from SHC to TCS.The
move is smooth. |
|
2621
|
Wednesday, June 19, 2024, 14:16 |
David Wang | South Hot-Cell | Standard Operation | TM3 | SiC #46 | Tm3 electrical check with SiC#46 target at SHC | Tm3 electrical check with SiC#46 target
and HS line helium spray check at SHC. were
done. everything is good. see attachment. |
|
2622
|
Monday, June 24, 2024, 14:37 |
Carla Babcock | South Hot-Cell | Development | TM3 | UCx#44 | Inspection of TM3 and UCx#44 after no-protons run | TM3 and UCx#44 ran in ITE but issues with
the cyclotron prevented proton beam delivery.
Nonetheless, the target was heated and provided |
|
2623
|
Tuesday, June 25, 2024, 11:59 |
David Wang | ITE | Standard Operation | TM3 | SiC #46 | Tm3 has been moved from TCS to ITE. | Tm3 has been moved from TCS to ITE. the
move is smooth. |
|
2624
|
Tuesday, June 25, 2024, 11:59 |
David Wang | ITE | Standard Operation | TM3 | SiC #46 | Tm3 has been moved from TCS to ITE. | Tm3 has been moved from TCS to ITE. the
move is smooth. |
|
2625
|
Tuesday, June 25, 2024, 12:49 |
Frank Song | ITE | Standard Operation | TM3 | SiC#46 | Module Connection | TM3 with new target SiC#46 was connected
in ITE. |
|
2630
|
Thursday, July 04, 2024, 01:20 |
Carla Babcock | ITE | Development | TM3 | SiC#46 | TM3 conditioning with protons | Initial Summary:
TM3 sparking behaviour in ITE has
been very disruptive both with and without |
|
2646
|
Tuesday, August 06, 2024, 09:16 |
Frank Song | ITE | Standard Operation | TM3 | SiC#46 | module disconnection | TM3 with spent target SiC#46 was
disconnected in ITE and ready to move to
TCS soon. |
|
2647
|
Thursday, August 08, 2024, 11:41 |
David Wang | South Hot-Cell | Standard Operation | TM3 | SiC #46 | Tm3 was moved from ITE to TCS this Tuesaday, then to SHC this morning. | Tm3 was moved from ITE to TCS this Tuesday,
then to SHC this morning. Both moves
are successful. |
|
2648
|
Thursday, August 08, 2024, 13:58 |
David Wang | South Hot-Cell | Standard Operation | TM3 | SiC #46 | TM3 SiC#46 electrical check at SHC with target on (After operation) | ABCD is short to 60KV bias. Othjer are
ok. see attachment.
Found afterwards that this short |
|
2650
|
Friday, August 09, 2024, 16:15 |
Frank Song | South Hot-Cell | Repair | TM3 | TiC#8 | electrical check/leak check | TM3 with replaced target TiC#8 has
been checked on SHC before moving to ITW.
Pls see attachment |
|
2652
|
Friday, August 09, 2024, 18:20 |
David Wang | ITW | Standard Operation | TM3 | TiC#8 | TM3 has been moved from SHC to ITW. | With TiC # 8 installed, TM3 has been moved
from SHc to ITW. The move is smooth. |
|
2653
|
Friday, August 09, 2024, 19:01 |
David Wang | ITW | Standard Operation | TM3 | TiC#8. | TM3 has been connected in ITW. | TM3 has been connected in ITW. See attachment
for checklist. |
|
2654
|
Sunday, August 11, 2024, 11:25 |
Carla Babcock | South Hot-Cell | Repair | TM3 | TiC#8 | short on multipin wires to TBHT discovered | With the new TiC#8 target installed on
TM3, there was a ~7kOhm connection between
TGHT/TBHT (A/B/C/D) and HV common. The standard |
|
2658
|
Tuesday, August 13, 2024, 14:23 |
David Wang | ITE | Standard Operation | TM3 | Ta#67. | TM2 with Ta#target has been moved from SHC to ITE. | TM2 with Ta#target has been moved from
SHC to ITE. the move is smooth. |
|