2567
|
Wednesday, April 24, 2024, 10:15 |
David Wang | Conditioning Station | Standard Operation | TM3 | | TM3 has been moved from SHC to TCS. | TM3 has been moved from SHC to TCS.
The move is smooth. |
|
|
2568
|
Friday, April 26, 2024, 08:56 |
David Wang | Conditioning Station | Development | TM3 | | TM3 module top helium spray leak test. | TM3 module top helium spray leak test was
done yesterday. No leak on TM3 module
top @ LD base leak rate 0.0 x E-9 atm.cc/sec. |
|
|
2569
|
Friday, April 26, 2024, 08:59 |
David Wang | Conditioning Station | Development | TM3 | | TM3 helium pressure test and electrical check with new source tray at TCS. | TM3 helium pressure test and electrical
check with new source tray at TCS were done
yesterday. The results are excellent. See |
|
|
2571
|
Saturday, April 27, 2024, 09:35 |
Carla Babcock; Alexander Shkuratoff | Conditioning Station | Development | TM3 | | TM3 source and service tray testing | Saturday, April 27, 2024, 09:35 :
Started ramping up HV, EE and EL
together. First small spark at 20.5kV on |
|
|
2576
|
Wednesday, May 01, 2024, 14:51 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | Tm3 has been moved form TCS to SHC. | Travis and I moved TM3 from TCS to SHC
this afternoon. The move is smooth. |
|
|
2578
|
Thursday, May 02, 2024, 14:54 |
David Wang | Conditioning Station | Standard Operation | TM3 | UCx#44 | TM3 has been moved from SHC to TCS. | TM3 has been moved from SHC to TCS
by David and Frank. The move is smooth. |
|
|
2579
|
Thursday, May 02, 2024, 14:58 |
David Wang | South Hot-Cell | Standard Operation | TM3 | UCx#44 | TM3 with UCx#44 electrical check and leak check. | TM3 with UCx#44 electrical check and leak
check are good. see attachment.
HS line 70 psi helium pressure test |
|
|
2580
|
Thursday, May 02, 2024, 15:23 |
David Wang | South Hot-Cell | Development | TM3 | | Leak check on TM3 new containment box window line VCR fittings. | After new containment box installation
on TM3, Chad and I did a helium spray leak
check on two VCR fittings on front side water |
|
|
2585
|
Wednesday, May 08, 2024, 12:36 |
David Wang | Conditioning Station | Standard Operation | TM3 | UCx#44 | TCS was argon vented this morning between 7:00 to 8:30 am. | TCS was argon vented this morning between
7:00 to 8:30 am before module was moved to
ITE. |
|
|
2586
|
Wednesday, May 08, 2024, 12:37 |
David Wang | ITE | Standard Operation | TM3 | UCx#44 | Tm3 has been moved form TCS to ITE | The move is smooth and successful. |
|
|
2589
|
Friday, May 10, 2024, 09:04 |
David Wang | ITE | Standard Operation | TM3 | UCx#44 | Tm3 has been connected in ITE. | Tm3 has been connected in ITE. see
attachment. |
|
|
2591
|
Tuesday, May 14, 2024, 15:27 |
Carla Babcock | ITE | Development | TM3 | UCx#44 | TM3 conditioning and testing in ITE | Tuesday, May 14, 2024, 10:26 :
Ramping up bias/EE/EL on ITE - will
see if the HV cage in the pit can hold 60kV |
|
|
2597
|
Thursday, May 23, 2024, 10:59 |
Frank Song | ITE | Standard Operation | TM3 | UCx#44 | shielding blocks transfer | the five shielding blocks have been
moved from storage area to ITE and is ready
for beam delivery. |
|
|
2610
|
Friday, June 14, 2024, 11:18 |
Frank Song | ITE | Standard Operation | TM3 | UCx#44 | module disconnection | TM3 with target UCx#44 was disconnected
in ITE. |
|
|
2611
|
Friday, June 14, 2024, 11:55 |
David Wang | South Hot-Cell | Standard Operation | TM3 | UCx#44 | TM3 UCx#44 after operation electrical check at SHC | TM3 UCx#44 after operation electrical check
at SHC . see attachment.
Carla: Looks like the short on the |
|
|
2612
|
Friday, June 14, 2024, 11:56 |
David Wang | ITE | Standard Operation | TM3 | UCx#44 | Tm3 has been moved form ITE to SHC. | Tm3 has been moved form ITE to SHC. the
move is smooth. |
|
|
2615
|
Monday, June 17, 2024, 17:24 |
Carla Babcock | ITE | Development | TM3 | UCx#44 | Status of gas system prototype in ITE | A new gas system for FEBIAD operation was
installed in ITE to enable us to use a calibrated
leak which is attached to the target heat |
|
|
2616
|
Tuesday, June 18, 2024, 11:59 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | Tm3 electrical check without target. | Tm3 electrical check without target is
done. Everything is good including 2 x 5
pin connectors( all OL at 250 V to 60 KV |
|
|
2620
|
Wednesday, June 19, 2024, 14:11 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | TM3 has been moved from SHC to TCS. | TM3 has been moved from SHC to TCS.The
move is smooth. |
|
|
2621
|
Wednesday, June 19, 2024, 14:16 |
David Wang | South Hot-Cell | Standard Operation | TM3 | SiC #46 | Tm3 electrical check with SiC#46 target at SHC | Tm3 electrical check with SiC#46 target
and HS line helium spray check at SHC. were
done. everything is good. see attachment. |
|