Wednesday, April 24, 2024, 10:15, David Wang, Conditioning Station, Standard Operation, TM3, , TM3 has been moved from SHC to TCS.
|
TM3 has been moved from SHC to TCS. The move is smooth. |
Friday, April 26, 2024, 08:56, David Wang, Conditioning Station, Development, TM3, , TM3 module top helium spray leak test.
|
TM3 module top helium spray leak test was done yesterday. No leak on TM3 module top @ LD base leak rate 0.0 x E-9 atm.cc/sec. |
Friday, April 26, 2024, 08:59, David Wang, Conditioning Station, Development, TM3, , TM3 helium pressure test and electrical check with new source tray at TCS.
|
TM3 helium pressure test and electrical check with new source tray at TCS were done yesterday. The results are excellent. See attachment |
Saturday, April 27, 2024, 09:35, Carla Babcock; Alexander Shkuratoff, Conditioning Station, Development, TM3, , TM3 source and service tray testing
|
Saturday, April 27, 2024, 09:35 :
Started ramping up HV, EE and EL together. First small spark at 20.5kV on bias, no reaction in other devices.
Note both BIAS and EL are off in their readbacks. See table below |
Wednesday, May 01, 2024, 14:51, David Wang, South Hot-Cell, Standard Operation, TM3, , Tm3 has been moved form TCS to SHC.
|
Travis and I moved TM3 from TCS to SHC this afternoon. The move is smooth. |
Thursday, May 02, 2024, 14:54, David Wang, Conditioning Station, Standard Operation, TM3, UCx#44, TM3 has been moved from SHC to TCS.
|
TM3 has been moved from SHC to TCS by David and Frank. The move is smooth. |
Thursday, May 02, 2024, 14:58, David Wang, South Hot-Cell, Standard Operation, TM3, UCx#44, TM3 with UCx#44 electrical check and leak check.
|
TM3 with UCx#44 electrical check and leak check are good. see attachment.
HS line 70 psi helium pressure test at TCS: no leak at 0.0xe-9 torr. |
Thursday, May 02, 2024, 15:23, David Wang, South Hot-Cell, Development, TM3, , Leak check on TM3 new containment box window line VCR fittings.
|
After new containment box installation on TM3, Chad and I did a helium spray leak check on two VCR fittings on front side water lines. they are leak
free.
Helium pressurize window water line to 70 psi for 3minutes. No response on leak detector which is 0.0xe-9 atm.cc/sec. |
Wednesday, May 08, 2024, 12:36, David Wang, Conditioning Station, Standard Operation, TM3, UCx#44, TCS was argon vented this morning between 7:00 to 8:30 am.
|
TCS was argon vented this morning between 7:00 to 8:30 am before module was moved to ITE. |
Wednesday, May 08, 2024, 12:37, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been moved form TCS to ITE
|
The move is smooth and successful. |
Friday, May 10, 2024, 09:04, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been connected in ITE.
|
Tm3 has been connected in ITE. see attachment. |
Tuesday, May 14, 2024, 15:27, Carla Babcock, ITE, Development, TM3, UCx#44, TM3 conditioning and testing in ITE
|
Tuesday, May 14, 2024, 10:26 :
Ramping up bias/EE/EL on ITE - will see if the HV cage in the pit can hold 60kV or not.
At around 50kV the bias read current starts to get jumpy. Doesn't look like its an issue for the voltage, but definitely instability increases. |
Thursday, May 23, 2024, 10:59, Frank Song, ITE, Standard Operation, TM3, UCx#44, shielding blocks transfer
|
the five shielding blocks have been moved from storage area to ITE and is ready for beam delivery.
submitted WP# I2024-05-22--1
actived WP # I2024-05-23-4 |
Friday, June 14, 2024, 11:18, Frank Song, ITE, Standard Operation, TM3, UCx#44, module disconnection
|
TM3 with target UCx#44 was disconnected in ITE. |
Friday, June 14, 2024, 11:55, David Wang, South Hot-Cell, Standard Operation, TM3, UCx#44, TM3 UCx#44 after operation electrical check at SHC
|
TM3 UCx#44 after operation electrical check at SHC . see attachment.
Carla: Looks like the short on the cathode observed while trying to operate the FEBIAD in cathode-bias mode is still there. Will do investigations
in the hot cell during disassembly. |
Friday, June 14, 2024, 11:56, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been moved form ITE to SHC.
|
Tm3 has been moved form ITE to SHC. the move is smooth. |
Monday, June 17, 2024, 17:24, Carla Babcock, ITE, Development, TM3, UCx#44, Status of gas system prototype in ITE
|
A new gas system for FEBIAD operation was installed in ITE to enable us to use a calibrated leak which is attached to the target heat shield. This will
allow us to control the quantity and purity of the gas going into the system, and to switch quickly between gasese and pressures.
The schematic of the system is attached. The use of the ballast container is likely not needed - it was originally included in case we want to |
Tuesday, June 18, 2024, 11:59, David Wang, South Hot-Cell, Standard Operation, TM3, , Tm3 electrical check without target.
|
Tm3 electrical check without target is done. Everything is good including 2 x 5 pin connectors( all OL at 250 V to 60 KV and each other) see attachment. |
Wednesday, June 19, 2024, 14:11, David Wang, South Hot-Cell, Standard Operation, TM3, , TM3 has been moved from SHC to TCS.
|
TM3 has been moved from SHC to TCS.The move is smooth. |
Wednesday, June 19, 2024, 14:16, David Wang, South Hot-Cell, Standard Operation, TM3, SiC #46, Tm3 electrical check with SiC#46 target at SHC
|
Tm3 electrical check with SiC#46 target and HS line helium spray check at SHC. were done. everything is good. see attachment. |
|