652
|
Wednesday, April 16, 2014, 17:08 |
Keith C Ng | ITE | Repair | | | 2a3 window - He leak check | Helium leak checked 2a3 window after installing
using remote line:
- There was a leak found between |
|
|
899
|
Monday, April 27, 2015, 16:12 |
Keith C Ng | South Hot-Cell | Development | TM2 | | Ceramic Standoffs in TM2 source tray steerer assembly | On drawing ITA6008 for the Encole 0.5"
ceramic standoffs there is a note to match
pairs of ceramics to within +/-0.001". |
|
|
1461
|
Friday, March 24, 2017, 11:12 |
Keith C Ng | Spent Target Vault | Standard Operation | | | 2A window transfer | Transfered the 2A window from the ISAC
Storage Vault to the Cyclotron Vault Tunnel
Storage area. RPG storage form attached. |
|
|
1462
|
Friday, March 24, 2017, 11:19 |
Keith C Ng | Spent Target Vault | Standard Operation | | 2A3 window | Window now in vault |
|
|
|
1592
|
Wednesday, August 02, 2017, 15:41 |
Keith C Ng | Assembly/Bench Test | Development | | | spare source tray build | After re zeroing alignment telescope to
master jig and adjusted parts into place:
|
|
|
1640
|
Wednesday, October 11, 2017, 15:50 |
Keith C Ng | Assembly/Bench Test | Standard Operation | | | spare source tray build alignment |
Spare |
|
|
1642
|
Friday, October 13, 2017, 11:14 |
Keith C Ng | Assembly/Bench Test | Standard Operation | | | source tray alignment/build | Source tray is complete for brazing, gas
line bracket is currently missing but can
be made in parallel with tube bending operations. |
|
|
1703
|
Friday, April 20, 2018, 15:33 |
Keith C Ng | ITW | Repair | | | ITW beam tube repair job | 2A2 window has been removed from ITW and
beamlines has removed the beamtube from the
penetration. The penetration has been sealed |
|
|
1704
|
Friday, April 27, 2018, 15:06 |
Keith C Ng | ITW | Repair | | | ITW beam tube repair | Vacuumed out remainder of debris from the
wall penetration, removed cradle and checked
condition. Down stream support bracket sees |
6x |
|
1705
|
Tuesday, May 01, 2018, 10:54 |
Keith C Ng | ITW | Repair | | | 2a2 window installation and beamtube repair | Yesterday
we installed the 2a2 window, the drive screw
was torqued until 70 ft-lbs and we stopped, |
|
|
1723
|
Thursday, May 24, 2018, 15:19 |
Keith C Ng | Assembly/Bench Test | Repair | TM2 | | tm 2 source tray build | Attached alignment check notes after brazing
and fabrication.
First page lower half shows establishment |
|
|
2371
|
Monday, October 03, 2022, 14:28 |
Keith C Ng | Assembly/Bench Test | Maintenance | | | ITA2826 rev E assembly | A fully built steerer sub assembly ITA2826
revision E was boxed and sealed and put on
rack storage in ISAC B2 South Hot Cell area. |
|
|
2549
|
Wednesday, March 13, 2024, 11:12 |
Keith C Ng | Assembly/Bench Test | Repair | TM3 | | optics tray for tm3 | Alignment notes attached for the optics
tray for the refurbished tm3 with the new
service and source tray. |
|
|
2471
|
Thursday, August 03, 2023, 12:24 |
Jason Zhang | Crane | Development | | | Cleanup of camera installation on target hall crane, installation of replacement laser | The cleanup of
the ISAC Target Hall crane and installation |
|
|
446
|
Tuesday, September 10, 2013, 12:11 |
Isaac Earle | South Hot-Cell | Repair | TM3 | | Module side heat shield water block polishing and blank-off installation | The sealing surfaces of the module
side heat shield water block were polished
on September 9th in the morning using Chad's |
|
|
894
|
Tuesday, April 21, 2015, 17:14 |
Isaac Earle | South Hot-Cell | Standard Operation | TM1 | UC#12 | UC#12 Installed in TM1 | On Friday April 17th, UC#12 target was
installed in TM1. One of the copper
water lines was bent slightly as the target |
|
|
952
|
Friday, June 19, 2015, 09:37 |
Isaac Earle | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Installation - June 18, 2015 | The following work was done on
June 18 2015:
- Finished cleaning and polishing |
|
|
1032
|
Monday, August 10, 2015, 14:07 |
Isaac Earle | South Hot-Cell | Repair | TM2 | | TM2 Containment Box Removed | The containment box was taken off TM2 in
preparation for installation of a new coil
line isolator. |
|
|
1221
|
Wednesday, May 04, 2016, 11:14 |
Isaac Earle | North Hot-Cell | Development | | | North Hot Cell Scope Decision | A meeting was held on May 4, 2016 to determine
the scope of the North Hot Cell project.
The following was agreed upon by those |
|
|
1294
|
Friday, July 29, 2016, 14:27 |
Isaac Earle | North Hot-Cell | Development | | | North Hot Cell Measurements & Cleanup | The North
Hot Cell was accessed today via the Ante |
|