ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  2328   Tuesday, June 07, 2022, 14:15 Frank SongITE/ITWStandard OperationTM2SiC#42Module Connection TM2 with Febiad target SiC#42 was
connected in ITW.
 TM2_with_sic_42_connected_in_ITW.jpg 
  2329   Thursday, June 09, 2022, 09:47 Matthew GareauSouth Hot-CellRepairTM2SiC#42containment box repair, Einzle lens, multi pinOn June 2 2022, while attempting to install
target SiC#42 a gasket fell off the water
line. I attempted to remove the target to
  
  2330   Monday, June 20, 2022, 11:00 Frank SongNorth Hot-CellRepairTM2SiC#42Failed Sic#42 electrical measurement at NHC An electrical check was done at NHC,
see attachment pls.
 Failed_Sic#42_electrical_measurement_at_NHC.jpg 
  2345   Wednesday, July 06, 2022, 10:30 Travis CaveSpent Target VaultStandard Operation SiC#42Spent Target Move The spent SiC#42 was moved from the
north hot cell to the spent target vault,
it was placed in pail #271 and put in spot
 Target_Index_2022-07-06.pdf 
  2244   Wednesday, September 15, 2021, 08:39 Travis CaveITEStandard OperationTM4SiC#41Module moveTM#4 with SiC#41 has been moved from the
NHC to ITE.
  
  2255   Monday, October 04, 2021, 10:52 Travis CaveNorth Hot-CellStandard OperationTM4SiC#41Module move TM#2 moved from ITE to NHC SiC#41
removed and then moved back to ITE.
  
  2259   Wednesday, October 13, 2021, 11:54 Travis CaveNorth Hot-CellStandard Operation SiC#41Spent Target Move The spent SiC#41 target has been
placed in pail #260 and placed in spot 5B
of that spent target vault. See attached
 Target_Index_2021-10-13.pdf 
  2243   Tuesday, September 14, 2021, 09:18 Travis CaveSouth Hot-CellRepairTM4SiC#40Module moveTM#4 with SiC#40 has been moved from the east
target station to the south hot cell.
  
  2034   Friday, November 29, 2019, 11:03 Travis CaveSouth Hot-CellStandard OperationTM2SiC#39Module move TM#2 with the SiC#39 target has been
moved from the south hot cell to the east
target station.
  
  2071   Thursday, February 27, 2020, 09:50 Travis CaveSafe Module ParkingStandard OperationTM2SiC#39Module move TM#2 with SiC#39 has been moved from
the east station to the smp.
  
  2270   Thursday, November 18, 2021, 09:47 Travis CaveSpent Target VaultStandard Operation SiC#38 and UC#29Spent Target Move The spent targets SiC#38 and UC#29
have been removed from the spent target vault
and placed into the mini storage. See attached
 Target_Index_2021-11-18.pdfTarget_Index_2021-11-18_mini_vault.pdf 
  2033   Friday, November 29, 2019, 11:02 Travis CaveSouth Hot-CellStandard OperationTM2SiC#38 SiC#39Electrical Check Results from the electrical check
with the old SiC#38 target and the new SiC#39.
 Elec_chk_SiC#38_SHC_post_beam_TM2_11-26-2019.pdfElec_chk_SiC#39_SHC_TM2_11-29-2019.pdf 
  2025   Thursday, November 07, 2019, 08:56 David WangConditioning StationStandard OperationTM2SiC#38TM2 in TCS.Helium pressure leak check on TM2 HS line
at TCS is done. No leak. Also, Helium are
sprayed to gas line adapter and fittings.
  
  2026   Thursday, November 07, 2019, 10:39 Anders MjosConditioning StationStandard OperationTM2SiC#38Conditioing SiC#38Thursday, November 07, 2019, 10:35: Tested
source to 30 A on TGHT, TBHT and COIL. ANODE
at 100 V.
 SiC#38_ANODE_bias_2019-11-07.PNG 
  2027   Tuesday, November 12, 2019, 10:02 Adam NewsomeITEStandard OperationTM2SiC#38TM2 MoveTM2 was moved from the Conditioning Station
to ITE, with SiC#38 target. 
  
  2031   Tuesday, November 26, 2019, 10:24 Travis CaveSouth Hot-CellStandard OperationTM2SiC#38Module move TM#2 with SiC#38 has been moved from
ITE to the south hot cell.
  
  2036   Tuesday, December 03, 2019, 12:45 Adam NewsomeSpent Target VaultStandard Operation SiC#38SiC#38 in Pail 205 moved to Storage Vault: 4BSiC#38 in Pail 205 was moved to section 4B
of the storage vault. Dose rate when retrieving
from Hot Cell was 22.2 mSv/h. 
 Target_Index_2019-12-03.pdf 
  1644   Wednesday, October 18, 2017, 10:45 Travis CaveSouth Hot-CellStandard OperationTM4SiC#37Electrical Check The results of the electrical check
of TM#4 with SiC#37, see attached PDF.
 TM4_SIC37_elec_chk_SHC.pdf 
  1645   Wednesday, October 18, 2017, 10:46 Travis CaveConditioning StationStandard OperationTM4SiC#37Module move TM#4 with SiC#37 has been moved from
the south hot cell to the conditioning station.
  
  1649   Thursday, October 19, 2017, 14:20 Anders MjosConditioning StationStandard OperationTM4SiC#37SiC#37 ConditioningThursday, October 19, 2017, 14:20: EE configured
for conditioning. HV cage locked up
Thursday, October 19, 2017, 16:46:
 SiC#37_BIAS_current_vs_voltage.xlsxSiC#37.docx 