  1052   Wednesday, August 26, 2015, 14:30 David WangConditioning StationStandard OperationTM2ZrCTM2 and Cs vacuum sysyem has been connected at CS.Turbo-pumps are started . The pumping down
is good so far.
  
  1100   Wednesday, October 14, 2015, 12:48 David WangSouth Hot-CellStandard OperationTM2ZrC#7TM2 ZrC#7 after run electrical check at SHC.I did an electrical check on TM2 with ZrC
#7 on it. The EE is short to 60KV bias. See
attachment
 ZrC_#7_after_run_electrical_check.pdf 
  910   Tuesday, May 05, 2015, 10:57 chad fisherSouth Hot-CellRepairTM2 TM2 WiringOld wiring was removed yesterday, new wiring
run thru the vacuum chase. Old IMG gauge
removed today, new cable trays installed
 TM2_New_Wiring_20150504_13.jpgTM2_Wiring_20150505_10.jpg 
  950   Wednesday, June 17, 2015, 14:21 chad fisherSouth Hot-CellRepairTM2 TM2 Waterblock Clean PolishFiberglass that fell out yesterday was
put back in place (as well as possible).
Cleaning took place this morning
 20150617_080236_1.jpg20150617_081538_1.jpg20150617_083830.jpg 
  958   Tuesday, June 23, 2015, 14:19 chad fisherSouth Hot-CellRepairTM2 TM2 Water Block Jigs RemovedBoth halves of the water block jigs have
been removed and the module is now ready
for base vacuum leak and electrical checks.
 20150623_140917.jpg 
  960   Wednesday, June 24, 2015, 10:16 chad fisherSouth Hot-CellRepairTM2 TM2 Vacuum Leak CheckThe following circuits have been vacuum
leak checked and have not registered any
leaks:
  
  839   Monday, February 02, 2015, 14:06 chad fisherSouth Hot-CellRepairTM2 TM2 Tray buildMaster target jig installed to locate attachment
bracket ITA3389 as well as conductor insulator
block b (aluminum / for soldering version)
 TM2_Tray_20150202_134752.jpgTM2_Tray_20150202_134759.jpg 
  831   Thursday, January 08, 2015, 10:34 chad fisherSouth Hot-CellStandard Operation  TM2 Tray Build Status and ProblemsFinal assembly of the source tray for TM2
was started this morning.
Sliding tray was received from keensert
 TM2_Tray_20150108_09.jpgTM2_Tray_20150108_10.jpgTM2_Tray_20150108_11.jpgTM2_Tray_20150108_12.jpg 
  833   Monday, January 12, 2015, 14:29 chad fisherSouth Hot-CellRepairTM2 TM2 Tray Build StatusCountersink problem with supports has been
remedied. Scratches, dings, and pitting has
been buffed out and supports re-cleaned and
 TM2_Tray_20150112_01.jpg 
  837   Thursday, January 29, 2015, 11:31 chad fisherSouth Hot-CellRepairTM2 TM2 Tray BuildOn Tuesday morning I attempted to complete
assembly of the source tray for TM2 however
discovered that 3 1/4-20 x 0.25 titanium
 TM2_Tray_20150126_112232.jpg 
  838   Monday, February 02, 2015, 09:59 chad fisherSouth Hot-CellRepairTM2 TM2 Tray BuildMissing heli coils installed this morning.
Threads had to be chased with tap
for 1/4-20 heli coil and missing countersinks
  
  834   Tuesday, January 20, 2015, 13:45 chad fisherSouth Hot-CellRepairTM2 TM2 Tray AlignmentTM2 Tray Alignment is complete except for
verification with alignment tray.
First attempt results were:
 TM2Alignment_Target_Front_Jan_20.jpgTM2_Alignment_Target_Rear_Jan_20.jpg 
  835   Monday, January 26, 2015, 09:36 chad fisherSouth Hot-CellRepairTM2 TM2 Tray AlignmentTM2 tray alignment was confirmed with the
alignment tray this morning:
Front target 0.000 vertically, 0.000
 TM2_Tray_20150126_090448.jpg 
  2473   Tuesday, August 08, 2023, 13:01 David WangNorth Hot-CellStandard OperationTM2TiC#6TM2 TiC#6 post run electrical check at NHC.TM2 TiC#6 post run electrical check has
been done at TCS. See attachment
 TiC#6_post_run_electrical_check.pdf 
  2770   Friday, February 14, 2025, 11:35 David WangConditioning StationStandard OperationTM2 TM2 TP1/TP2 and TCS TP1S have been started at TCS.TM2 TP1/TP2 and TCS:TP1S have been started
at TCS. The starting time and operation of
turbo pumps are ok. TM2 had been stored in
  
  964   Friday, June 26, 2015, 09:45 chad fisherSouth Hot-CellRepairTM2 TM2 StatusContainment box window waterlines have
been connected and leak checked and new containment
box cover installed.
  
  986   Wednesday, July 08, 2015, 14:48 chad fisherSouth Hot-CellRepairTM2 TM2 StatusWater block jig has been removed. Stuck
source tray side water block jig component
has been removed. An attempt was made to
  
  1000   Thursday, July 16, 2015, 14:36 chad fisherSouth Hot-CellRepairTM2 TM2 StatusIMG gauge, clip for ground to window lines
and gas line extensions were installed today.
David and I also tried to locate
 20150716_110247.jpg20150716_142818.jpg 
  1001   Friday, July 17, 2015, 13:51 chad fisherSouth Hot-CellRepairTM2 TM2 StatusGas lines extensions installed yesterday
were too long and gas lines touched top inside
of containment box. They have been removed
 20150717_134123.jpg 
  1002   Monday, July 20, 2015, 14:12 chad fisherSouth Hot-CellRepairTM2 TM2 StatusUltem high voltage spacer installed and
9 pin banana plug plugged in. Target has
been inserted into the hot cell and will
 20150720_134819.jpg20150720_135747.jpg20150720_140100.jpg 