2091
|
Friday, March 27, 2020, 08:45 |
Matthew Gareau | North Hot-Cell | Maintenance | | | Issues with the manipulators | This is a link to all of the issues
with the NHC manipulators that I know of
|
|
2158
|
Tuesday, October 27, 2020, 11:46 |
Matthew Gareau | North Hot-Cell | Repair | | | Ratcheting repair issues with both left and right master |
|
|
2174
|
Thursday, December 24, 2020, 09:00 |
Matthew Gareau | North Hot-Cell | Development | | | NHC USB connection | |
|
2197
|
Friday, March 05, 2021, 09:12 |
Matthew Gareau | North Hot-Cell | Development | TM3 | | Containment box door removal and swivel arm test | First thing I entered into the NHC to install
to the target kart mounting clip, and remove
excess tools and materials from the hotcell |
|
2217
|
Tuesday, May 25, 2021, 15:59 |
Matthew Gareau | North Hot-Cell | Development | | | Removed boot from left hot manipulator | Myself and Isaac removed the boot
from the left hot manipulator.
- opened the hatch in the TH to get |
7x |
2230
|
Wednesday, June 30, 2021, 14:11 |
Matthew Gareau | North Hot-Cell | Standard Operation | | | North Hot Cell Commemorative Opening | Yesterday a bottle of Cava (sparkling
wine) was place, opened, and poured in the
NHC, to commemorate its new operational status. |
|
2329
|
Thursday, June 09, 2022, 09:47 |
Matthew Gareau | South Hot-Cell | Repair | TM2 | SiC#42 | containment box repair, Einzle lens, multi pin | On June 2 2022, while attempting to install
target SiC#42 a gasket fell off the water
line. I attempted to remove the target to |
|
2332
|
Tuesday, June 21, 2022, 15:36 |
Matthew Gareau | North Hot-Cell | Repair | TM2 | SiC#42, SiC#43 | multipin guide pin issues | While removing the SiC#42
it became apparent that the multipin guide |
|
2368
|
Wednesday, September 28, 2022, 12:58 |
Matthew Gareau | North Hot-Cell | Repair | | | Chad repaired the right operator side manipulator | On 26/Sept/2022
Chad disassembled the right operator
side manipulator, and noticed that gears |
|
2369
|
Wednesday, September 28, 2022, 13:15 |
Matthew Gareau | North Hot-Cell | Maintenance | | | topped up the NHC window oil through the oil expansion tank | Myself and Maico were able to top up the
NHC window oil.
The oil was filled through the expansion |
|
2372
|
Monday, October 03, 2022, 14:58 |
Matthew Gareau | North Hot-Cell | Repair | TM4 | SiC#43 and C#4 | Loose multipin guide pin | Today while I was removing the SiC#43
it was noticed that the multipin guide pin
was loose. |
|
2214
|
Friday, April 30, 2021, 14:09 |
Luca Egoriti | ITE/ITW | Development | TM4 | | TM4 resistance measurements for P2N | Friday, April 30, 2021, 14:06
Anders and Luca
Resistance measurements on each electrical |
|
620
|
Wednesday, March 12, 2014, 16:33 |
Keith C Ng | ITE | Repair | | | 2A3 window removal and replacement | prep'ed area for work:
- removed shield plug from window
clamp area |
|
622
|
Thursday, March 13, 2014, 16:23 |
Keith C Ng | ITE | Repair | | | 2a3 window - inspection | Video inspected 2a3 window joint this morning.
Screenshots from video showing debris
forming around aluminum cradle and brown/red |
|
623
|
Monday, March 17, 2014, 15:39 |
Keith C Ng | ITE | Repair | | | 2a3 window - prep and clean | Cleaned top of the ITE vacuum flange and
top of window clamp. Attempted to clean the
bellows/beam pipe through the wall, mostly |
|
624
|
Tuesday, March 18, 2014, 16:01 |
Keith C Ng | ITE | Repair | | | 2a3 window - prep and clean | Continued with vacuuming inside wall penetration
to remove debris. Changed filter bag in nilfisk
vacuum, left old filter in place however |
|
626
|
Wednesday, March 19, 2014, 16:48 |
Keith C Ng | ITE | Repair | | | 2a3 window - beam tube removal | Today:
1) Vaccumed top and around clamp.
Disconnected clamp from flanges and removed |
11x |
628
|
Friday, March 21, 2014, 16:49 |
Keith C Ng | ITE | Repair | | | 2a3 window - tank flange inspection | Today:
1) Cleaned flange with methanol and
cotton glove, appears to be clean. |
|
638
|
Friday, April 04, 2014, 14:59 |
Keith C Ng | ITE | Maintenance | | | measurement of new beam tube section | R. Kuramoto and A. Laxdal measured the
distance from the 2A tunnel to the tank flange
of ITE. The new fabricated beam pipe with |
|
647
|
Friday, April 11, 2014, 18:17 |
Keith C Ng | ITE | Repair | | | 2a3 window - install | Today:
1) Installed new cradle and shortened
beam pipe section in wall penetration. |
|