ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
|
280
|
Wednesday, March 27, 2013, 11:49 |
David Wang | ITE | Standard Operation | TM4 | Sic LIS-RFQ | Connected TM4 in ITE | TM4 has been reconnected to ITE after the
module moving. The roughing is started .
The water will be supplied to ITE after |
|
|
281
|
Wednesday, March 27, 2013, 12:08 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Sic LIS-RFQ | TM4 heat shield circuit leak check with SiC LIS-RFQ target | Chad and I did the TM4 heat shield leak
check yesterday at SHC. The leak detector
was pumped to 4.6 xE-9atm.cc/sec, and 0.0xE-4 |
|
|
409
|
Wednesday, July 24, 2013, 17:46 |
David Wang | Conditioning Station | Standard Operation | TM4 | Sic 29# | Started 3 turbo pumps on CS for TM4 | 3 turbo pumps on TM4 and CS have been started.
The pumping down is good so far, The TM4
PNG1 reading is more than 10 times higher |
|
|
284
|
Wednesday, April 03, 2013, 12:26 |
David Wang | ITE | Maintenance | TM4 | Sic LIS/RFQ | Leak check on ITE TM4. | TM 4 had been leak check in ITE due to
relatively high PNG1 and IG1 readings.All
TM4 primary and secondary vessel air |
|
|
2625
|
Tuesday, June 25, 2024, 12:49 |
Frank Song | ITE | Standard Operation | TM3 | SiC#46 | Module Connection | TM3 with new target SiC#46 was connected
in ITE. |
|
|
2630
|
Thursday, July 04, 2024, 01:20 |
Carla Babcock | ITE | Development | TM3 | SiC#46 | TM3 conditioning with protons | Initial Summary:
TM3 sparking behaviour in ITE has
been very disruptive both with and without |
|
|
2646
|
Tuesday, August 06, 2024, 09:16 |
Frank Song | ITE | Standard Operation | TM3 | SiC#46 | module disconnection | TM3 with spent target SiC#46 was
disconnected in ITE and ready to move to
TCS soon. |
|
|
2659
|
Wednesday, August 14, 2024, 11:29 |
Aaron Tam | Waste Package/Ship | Standard Operation | | SiC#46 | Target Disposal and visual check | SiC#46 loaded into pail 293 successfully
along with other hotcell waste
Upon visual inspection of the target, |
|
|
2660
|
Friday, August 16, 2024, 08:47 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#46 | Spent Target Move | SiC#46 (pail 293) was placed in the
vault (spot 3B) on Wednesday the 14th
of August. It was 111 mSv/hr when removed |
|
|
2457
|
Tuesday, June 13, 2023, 11:49 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | SiC#45 | electrical check and leak check | TM4 with new target SiC#45 installed
has been leak checked and electrical checked
on top of NHC. |
|
|
2458
|
Wednesday, June 14, 2023, 07:10 |
Frank Song | ITE | Standard Operation | TM4 | SiC#45 | TM4 with SiC#45 connection in ITE | TM4 with new target SiC#45 was connected
in ITE, all TPs are running at their full
speed. |
|
|
2464
|
Tuesday, July 18, 2023, 10:08 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | SiC#45 | module disconnection & electrical check right after transferred from ITE to NHC | TM4 with spent target SiC#45 was
disconnected ITE and an electrical
check made right after moved on NHC. |
|
|
2467
|
Tuesday, July 25, 2023, 16:25 |
Carla Babcock | North Hot-Cell | Standard Operation | | SiC#45 | SiC#45 post irradiation inspection | Looked at SiC#45 in the hot cell. Looked
very clean, no deposits on the heat shield
or other components. Target also looked very |
|
|
2358
|
Thursday, August 18, 2022, 10:41 |
Frank Song | ITE/ITW | Standard Operation | TM4 | SiC#44 | TM4 with SiC#44 connection in ITE | TM4 with target SiC#44 was connected
in ITE on Tuesday. |
|
|
2359
|
Tuesday, August 23, 2022, 10:51 |
Carla Babcock | ITE | Repair | TM4 | SiC#44 | TBHT to HV common short on SiC#44-TM4 | TM4 with SiC#44 installed developed a short
TBHT to HV common during its first heating
in ITE. Was fine before installation. Now |
|
|
2377
|
Thursday, October 13, 2022, 09:32 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#44 | Spent Target Move | Spent target move done. The SiC#44
was moved from the north hot cell to the
spent target vault. It was placed in pail#275 |
|
|
2379
|
Wednesday, October 19, 2022, 12:00 |
Carla Babcock | North Hot-Cell | Standard Operation | TM4 | SiC#44 | PIE on SiC#44 | Conducted PIE on SiC#44, which failed online.
It had a cathode short, a target short and
an anode short by the time we called the |
|
|
2680
|
Thursday, September 12, 2024, 14:12 |
Adam Newsome | Waste Package/Ship | Development | | SiC#44 | Failed waste emplacement at CNL: Flask #22, Pail 275 (SiC#44) | On 2024-09-12, CNL reported difficulty
with lowering Pail 275 from F-308 flask #22
into their tile hole. The four other pails |
|
|
2709
|
Thursday, October 24, 2024, 10:42 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#44 | Target repacked moved to the mini vault. | On October 22 2024 the spent SIC#44
returned from CNL was repacked in a new pail
it was in pail 275 and repacked into pail |
|
|
2372
|
Monday, October 03, 2022, 14:58 |
Matthew Gareau | North Hot-Cell | Repair | TM4 | SiC#43 and C#4 | Loose multipin guide pin | Today while I was removing the SiC#43
it was noticed that the multipin guide pin
was loose. |
|