ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
288
|
Thursday, April 04, 2013, 12:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Ta #39 | Roughing started | Roughing started at 12:06. It was
believed there was a problem with the compressed
air but there was none, TM1 doesn't leak |
|
289
|
Thursday, April 04, 2013, 14:31 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Ta #39 | Roughing started |
|
|
292
|
Monday, April 08, 2013, 16:16 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Ta #39 | Venting with Argon | TM1 started venting at 4:15 pm with
Argon. I will leave the valve open over night. |
|
19
|
Wednesday, August 17, 2011, 13:09 |
Bevan Moss | ITW | Standard Operation | TM1 | Ta #37 | TM1 move from ITW to Hot Cell | TM1 with Ta #37 target was moved
from ITW to the south hot cell. The rotation
of TM1 may have been off slightly during |
|
661
|
Thursday, May 15, 2014, 14:38 |
David Wang | ITE | Repair | TM3 | TM3 | Bias short on ITE | Anders and I opened the HV cover in ITE
and did a visual check inside ITE HV
cover and top of TM3.Bill was with us and |
|
358
|
Thursday, May 23, 2013, 11:14 |
David Wang | South Hot-Cell | Standard Operation | TM4 | TA#40 | TM4 TA# 40 HS leak check at SHC | TM4 Ta#40 HS leak check is done at SHC
. No leak has been found so far. There will
be a helium pressure test on it at |
|
2355
|
Wednesday, August 10, 2022, 08:10 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Sic#44 | electrical and leak check | TM4 with Sic#44 installed and had
an electrical / leak check at NHC. |
|
2370
|
Monday, October 03, 2022, 09:42 |
Frank Song | ITE | Standard Operation | TM4 | Sic#44 | module disconnection | TM4 with SiC@44 was disconnected
in ITE. |
|
2331
|
Monday, June 20, 2022, 18:03 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Sic#43 | electrical check | TM2 with new target SiC#43 was electrical
checked at SHC. please see attachment. |
|
2245
|
Friday, September 17, 2021, 12:20 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Sic#41 | TM4 SIS with Target and No external Connections | TM4 electric check with new target
was done by David. A pic attached here for
ref. |
|
2246
|
Friday, September 17, 2021, 12:34 |
Frank Song | ITE | Standard Operation | TM4 | Sic#41 | Module Connection | TM4 with a new target was moved back
from NHC to ITE and reconnected at pit. The
5 shielding blocks were installed as well. |
   |
2254
|
Monday, October 04, 2021, 09:37 |
Frank Song | ITE | Standard Operation | TM4 | Sic#41 | module disconnection | TM4 was disconnected and moved to
NHC. |
  |
2322
|
Thursday, May 19, 2022, 11:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Sic#39, Ta#59, C#2, UC# 32 & 30 | Targets moved to the mini vault. | Sic#39, Ta#59, C#2, UC# 32 &
30 have been moved from the spent target
vault to the mini vault. See the attached |
 |
280
|
Wednesday, March 27, 2013, 11:49 |
David Wang | ITE | Standard Operation | TM4 | Sic LIS-RFQ | Connected TM4 in ITE | TM4 has been reconnected to ITE after the
module moving. The roughing is started .
The water will be supplied to ITE after |
|
281
|
Wednesday, March 27, 2013, 12:08 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Sic LIS-RFQ | TM4 heat shield circuit leak check with SiC LIS-RFQ target | Chad and I did the TM4 heat shield leak
check yesterday at SHC. The leak detector
was pumped to 4.6 xE-9atm.cc/sec, and 0.0xE-4 |
|
409
|
Wednesday, July 24, 2013, 17:46 |
David Wang | Conditioning Station | Standard Operation | TM4 | Sic 29# | Started 3 turbo pumps on CS for TM4 | 3 turbo pumps on TM4 and CS have been started.
The pumping down is good so far, The TM4
PNG1 reading is more than 10 times higher |
|
284
|
Wednesday, April 03, 2013, 12:26 |
David Wang | ITE | Maintenance | TM4 | Sic LIS/RFQ | Leak check on ITE TM4. | TM 4 had been leak check in ITE due to
relatively high PNG1 and IG1 readings.All
TM4 primary and secondary vessel air |
|
2625
|
Tuesday, June 25, 2024, 12:49 |
Frank Song | ITE | Standard Operation | TM3 | SiC#46 | Module Connection | TM3 with new target SiC#46 was connected
in ITE. |
|
2630
|
Thursday, July 04, 2024, 01:20 |
Carla Babcock | ITE | Development | TM3 | SiC#46 | TM3 conditioning with protons | Initial Summary:
TM3 sparking behaviour in ITE has
been very disruptive both with and without |
|
2646
|
Tuesday, August 06, 2024, 09:16 |
Frank Song | ITE | Standard Operation | TM3 | SiC#46 | module disconnection | TM3 with spent target SiC#46 was
disconnected in ITE and ready to move to
TCS soon. |
|