1840
|
Tuesday, December 11, 2018, 14:35 |
Anders Mjos | ITE | Standard Operation | TM4 | UC#26 | Block move |
Blocks were moved from ITW to ITE by Frank and David. ITE water flow to dump was re-opened (ITW remains open). A dose badge was installed in the operation storage area. Dose rates were measured to ~10 mSv/h at 1pm. Beam went off approximately 8:30am (with a short period of 2uA ending at 11am). |
|
1839
|
Monday, December 10, 2018, 15:31 |
Isaac Earle | North Hot-Cell | Development | | | NHC remote connection testing with manipulators |
The following tests have been successfully completed using the NHC manipulators:
- Ventilation pre-filter (mounted on the NHC/TCS partition wall) removed and re-installed using the manipulators
- Electrical plugs (two total) for operator-level LED lighting located on east wall of cell interior plugged in, and un-plugged using the manipulators
- Electrical plug inserted into and removed from each of the 120V outlets (four total) located in front of the viewing window using the manipulators
- All diagnostic service connections removed and reinstalled using the manipulators (six total, see IRH1765)
- All Staubli air and gas connections removed and reinstalled using the manipulators (five total, see IRH1749)
These tests were performed at various different times over the last several months by Isaac Earle and/or Chad Fisher. |
|
1838
|
Friday, December 07, 2018, 10:37 |
chad fisher | North Hot-Cell | Repair | | | Ariel connector test |
Completed testing of connectors for Ariel using the north hot cell.
Video can be found on docushare; document 161909 |
|
1837
|
Friday, December 07, 2018, 08:47 |
chad fisher | North Hot-Cell | Repair | | | North hot cell spare slave repair |
The tong cable on the spare north hot cell slave has been repaired. Slave came from the factory with the tong cables straddling one of the pulleys they are suppose to run through.
|
Attachment 1: 20181207_083906.jpg
|
|
|
1836
|
Tuesday, December 04, 2018, 12:36 |
David Wang | ITE | Standard Operation | TM4 | UCx 26. | TM4 has been connected in ITE/ Checklist. |
TM4 has been connected in ITE. See attachment for connection checklist |
Attachment 1: UCx26_TM4_connection_checklist.pdf
|
|
|
1835
|
Tuesday, December 04, 2018, 10:26 |
Travis Cave | ITE | Standard Operation | TM4 | UC#26 | Module move |
TM#4 with UC#26 has been moved from the conditioning station to the east target station. |
|
1834
|
Friday, November 30, 2018, 10:28 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#57 | Spent Target Move |
The spent Ta#57 target has been moved from the south hot cell to the spent target storage it was placed in pail 174 and placed in spot 8C in the vault. See attached PDF for details. |
Attachment 1: Target_Index_2018-11-30.pdf
|
|
|
1833
|
Thursday, November 29, 2018, 06:38 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check TM4 UCx 26 at SHC. |
Chad and I did a leak check on TM4 HS line with UCx 26# installed . Base LR 0.0X E-9 atm.cc/sec. Base pressure 0.0XE-4 torr. No response on leak detector during leak check. |
|
1832
|
Wednesday, November 28, 2018, 13:38 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#26 | Module move |
TM#4 with UC#26 has been moved from the south hot cell to the conditioning station. |
|
1831
|
Wednesday, November 28, 2018, 11:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#57 and UC#26 | Electrical Check |
Electrical check of TM#4 with the old Ta#57, no target and with new IG-LIS UC#26 target. See attached PDF for details. |
Attachment 1: Elec_Chk_Ta57_Post_Beam_SHC_11-28-28.pdf
|
|
Attachment 2: Elec_Chk_TM4_no_tgt_SHC_11-28-18.pdf
|
|
Attachment 3: Elec_Chk_UC26_SHC_11-28-18.pdf
|
|
Attachment 4: Elec_Chk_UC26_IGLIS_part_SHC_11-28-18.pdf
|
|
|
1830
|
Wednesday, November 28, 2018, 07:04 |
David Wang | ITE | Development | TM4 | LpTa 56 | New high current flexible cables inspection after LpTa#56 beam run. |
Inspected new high current flexible cables during TM4 disconnection. The new cables and adapters work fine. |
Attachment 1: new_flexibble_cable_in_ITE_after_Ta#56_run_001.JPG
|
|
Attachment 2: new_flexibble_cable_in_ITE_after_Ta#56_run_004.JPG
|
|
|
1829
|
Wednesday, November 28, 2018, 06:39 |
David Wang | Conditioning Station | Standard Operation | | | Disconnection checklist LpTa #56 |
TM4 was disconnected in ITE. Checklist list in attachment. |
Attachment 1: LpTa#56_disconnection_checklist.pdf
|
|
|
1828
|
Tuesday, November 27, 2018, 13:31 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#57 | Ta#57 removal |
Ta#57 has been removed from TM4. |
|
1827
|
Tuesday, November 27, 2018, 11:05 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#57 | Module move |
TM#4 with Ta#57 has been moved from the east target station to the south hot cell. |
|
1826
|
Monday, November 26, 2018, 12:19 |
chad fisher | North Hot-Cell | Repair | | | East Manipulator |
In preparation for removing the slave for replacement I discovered that the timing screw in the handle cable drum (master side) had been left threaded into the pulley...it should have been completely removed. It was bent from hitting on a casting inside the mater arm which most likely contributed to the hopped pulleys on the slave side. After removing this timing screw I entered the north hot cell and replaced the hopped cable back onto its pulley and Isaac tested the motions that previous caused the hopped cables. These tasks were repeated 4 times without any issues. Also of note is a missing setscrew in the tong cable pulley pin and a somewhat loose tape on the slave, also the tape shows signs of a crimp/bend. Upon further inspection and comparison with the other slaves I also found that one of the "lock-down" fittings tying the Z motion tape drum to the corresponding gear is completely missing. See pictures attached. |
Attachment 1: 20181126_113326.jpg
|
|
Attachment 2: 20181126_113338.jpg
|
|
|
1825
|
Thursday, November 22, 2018, 14:38 |
Isaac Earle | North Hot-Cell | Development | | | NHC design approved by High Voltage Engineer |
To satisfy RS 101 from the NHC requirements specification (Document-131915) Tomislav Hurskovec was consulted regarding high voltage safety. After a verbal discussion on various aspects of the NHC design he confirmed that the design satisfies high voltage safety concerns.
A copy of his confirmation e-mail is attached in PDF format.
|
Attachment 1: NHCHV.pdf
|
|
|
1824
|
Thursday, November 22, 2018, 08:55 |
Anders Mjos | ITW | Repair | TM2 | UC#25 | ITW:FC5 safety signal limit switch installed |
Yesterday Diagnostics group installed a temporary external limit switch to provide the in signal to the safety system. |
Attachment 1: FC5_limit_switch.jpg
|
|
|
1823
|
Thursday, November 22, 2018, 08:53 |
Anders Mjos | ITW | Standard Operation | TM2 | UC#25 | Block move |
Frank and Anders moved blocks from ITE to ITW yesterday |
|
1822
|
Thursday, November 22, 2018, 08:52 |
Anders Mjos | ITE | Standard Operation | TM4 | Ta#57 | Closed ITE dump water |
Paddle wheel signal was tripping proton beam in ITW. Valved off ITE dump to divert flow to ITW. Field around valve was about 600 uSv/h |
|
1821
|
Wednesday, November 14, 2018, 16:10 |
Anders Mjos | ITW | Repair | TM2 | UC#25 | ITW:FC5 safety signal troubleshooting |
Measured resistance on safety limit switches for FC5 on Exit Module 2. Determined that the in connected signal did not work (shows not connected irregardless of FC position). Confirmed proper operation of the OUT limit. See attachment for details. The Harp 5 x and y signal connectors were checked and reconnected. |
Attachment 1: 2018-11-13_FC5.pdf
|
|