Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1831     Entry time: Wednesday, November 28, 2018, 11:31
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#57 and UC#26 
Subject: Electrical Check 

 Electrical check of TM#4 with the old Ta#57, no target and with new IG-LIS UC#26 target. See attached PDF for details.

Attachment 1: Elec_Chk_Ta57_Post_Beam_SHC_11-28-28.pdf  175 kB  | Show | Hide all
Attachment 2: Elec_Chk_TM4_no_tgt_SHC_11-28-18.pdf  184 kB  | Show | Hide all
Attachment 3: Elec_Chk_UC26_SHC_11-28-18.pdf  163 kB  | Show | Hide all
Attachment 4: Elec_Chk_UC26_IGLIS_part_SHC_11-28-18.pdf  71 kB  | Show | Hide all
ELOG V2.9.2-2455