Entry  Friday, December 07, 2018, 08:47, chad fisher, North Hot-Cell, Repair, , , North hot cell spare slave repair 20181207_083906.jpg
The tong cable on the spare north hot cell slave has been repaired. Slave came from the factory with the tong cables straddling one of the pulleys they
are suppose to run through.
 
Entry  Tuesday, December 04, 2018, 12:36, David Wang, ITE, Standard Operation, TM4, UCx 26., TM4 has been connected in ITE/ Checklist. UCx26_TM4_connection_checklist.pdf
TM4 has been connected in ITE. See attachment for connection checklist
Entry  Tuesday, December 04, 2018, 10:26, Travis Cave, ITE, Standard Operation, TM4, UC#26, Module move 
 TM#4 with UC#26 has been moved from the conditioning station to the east target station.
Entry  Friday, November 30, 2018, 10:28, Travis Cave, Spent Target Vault, Standard Operation, , Ta#57, Spent Target Move Target_Index_2018-11-30.pdf
 The spent Ta#57 target has been moved from the south hot cell to the spent target storage it was placed in pail 174 and placed in spot 8C in the
vault. See attached PDF for details.
Entry  Thursday, November 29, 2018, 06:38, David Wang, South Hot-Cell, Standard Operation, TM4, , Leak check TM4 UCx 26 at SHC. 
Chad and I did a leak check on TM4 HS line with UCx 26# installed . Base LR 0.0X E-9 atm.cc/sec. Base pressure 0.0XE-4 torr.  No response on leak
detector during leak check. 
Entry  Wednesday, November 28, 2018, 13:38, Travis Cave, Conditioning Station, Standard Operation, TM4, UC#26, Module move 
 TM#4 with UC#26 has been moved from the south hot cell to the conditioning station.
Entry  Wednesday, November 28, 2018, 11:31, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#57 and UC#26, Electrical Check Elec_Chk_Ta57_Post_Beam_SHC_11-28-28.pdfElec_Chk_TM4_no_tgt_SHC_11-28-18.pdfElec_Chk_UC26_SHC_11-28-18.pdfElec_Chk_UC26_IGLIS_part_SHC_11-28-18.pdf
 Electrical check of TM#4 with the old Ta#57, no target and with new IG-LIS UC#26 target. See attached PDF for details.
Entry  Wednesday, November 28, 2018, 07:04, David Wang, ITE, Development, TM4, LpTa 56, New high current flexible cables inspection after LpTa#56 beam run. new_flexibble_cable_in_ITE_after_Ta#56_run_001.JPGnew_flexibble_cable_in_ITE_after_Ta#56_run_004.JPG
Inspected new high current flexible cables during TM4 disconnection. The new cables and adapters work fine.
Entry  Wednesday, November 28, 2018, 06:39, David Wang, Conditioning Station, Standard Operation, , , Disconnection checklist LpTa #56 LpTa#56_disconnection_checklist.pdf
TM4 was disconnected in ITE. Checklist list in attachment.
Entry  Tuesday, November 27, 2018, 13:31, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#57, Ta#57 removal 
Ta#57 has been removed from TM4.
Entry  Tuesday, November 27, 2018, 11:05, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#57, Module move 
 TM#4 with Ta#57 has been moved from the east target station to the south hot cell.
Entry  Monday, November 26, 2018, 12:19, chad fisher, North Hot-Cell, Repair, , , East Manipulator 20181126_113326.jpg20181126_113338.jpg
In preparation for removing the slave for replacement I discovered that the timing screw in the handle cable drum (master side) had been left threaded
into the pulley...it should have been completely removed. It was bent from hitting on a casting inside the mater arm which most likely contributed to the
hopped pulleys on the slave side. After removing this timing screw I entered the north hot cell and replaced the hopped cable back onto its pulley and
Entry  Thursday, November 22, 2018, 14:38, Isaac Earle, North Hot-Cell, Development, , , NHC design approved by High Voltage Engineer NHCHV.pdf
To satisfy RS 101 from the NHC requirements specification (Document-131915) Tomislav Hurskovec was consulted regarding high voltage safety.  After
a verbal discussion on various aspects of the NHC design he confirmed that the design satisfies high voltage safety concerns.
A copy of his confirmation e-mail is attached in PDF format.
Entry  Thursday, November 22, 2018, 08:55, Anders Mjos, ITW, Repair, TM2, UC#25, ITW:FC5 safety signal limit switch installed FC5_limit_switch.jpg
Yesterday Diagnostics group installed a temporary external limit switch to provide the in signal to the safety system.
Entry  Thursday, November 22, 2018, 08:53, Anders Mjos, ITW, Standard Operation, TM2, UC#25, Block move 
Frank and Anders moved blocks from ITE to ITW yesterday
Entry  Thursday, November 22, 2018, 08:52, Anders Mjos, ITE, Standard Operation, TM4, Ta#57, Closed ITE dump water 
Paddle wheel signal was tripping proton beam in ITW. Valved off ITE dump to divert flow to ITW. Field around valve was about 600 uSv/h
Entry  Wednesday, November 14, 2018, 16:10, Anders Mjos, ITW, Repair, TM2, UC#25, ITW:FC5 safety signal troubleshooting 2018-11-13_FC5.pdf
Measured resistance on safety limit switches for FC5 on Exit Module 2. Determined that the in connected signal did not work (shows not connected irregardless
of FC position). Confirmed proper operation of the OUT limit. See attachment for details. The Harp 5 x and y signal connectors were checked and reconnected.
Entry  Thursday, November 08, 2018, 09:27, chad fisher, South Hot-Cell, Maintenance, , , South East Manipulator cable replacement 
The handle cable on the east manipulator of the south hot cell has been replaced. Old cable showed signs of wear but had no broken strands. Manipulator
is back together but still needs to be re-tensioned.
Entry  Wednesday, November 07, 2018, 09:50, Anders Mjos, ITW, Standard Operation, TM2, UC#25, TM2 connected in ITW 
TM2 was connected yesterday by Frank and Anders. The West side panel with IG1S on Exit Module 2 was replaced with a new SST panel with 1 CF flange only
(dwg). Link to check list on DocuShare.
Entry  Tuesday, November 06, 2018, 10:59, Travis Cave, ITW, Standard Operation, TM2, UC#25, Module move 
 TM#2 with UC#25 has been moved from the conditioning station to the west target station.