  RH-ISAC, Page 50 of 139  Not logged in ELOG logo
Entry  Friday, December 07, 2018, 08:47, chad fisher, North Hot-Cell, Repair, , , North hot cell spare slave repair 20181207_083906.jpg
Entry  Tuesday, December 04, 2018, 12:36, David Wang, ITE, Standard Operation, TM4, UCx 26., TM4 has been connected in ITE/ Checklist. UCx26_TM4_connection_checklist.pdf
Entry  Tuesday, December 04, 2018, 10:26, Travis Cave, ITE, Standard Operation, TM4, UC#26, Module move 
Entry  Friday, November 30, 2018, 10:28, Travis Cave, Spent Target Vault, Standard Operation, , Ta#57, Spent Target Move Target_Index_2018-11-30.pdf
Entry  Thursday, November 29, 2018, 06:38, David Wang, South Hot-Cell, Standard Operation, TM4, , Leak check TM4 UCx 26 at SHC. 
Entry  Wednesday, November 28, 2018, 13:38, Travis Cave, Conditioning Station, Standard Operation, TM4, UC#26, Module move 
Entry  Wednesday, November 28, 2018, 11:31, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#57 and UC#26, Electrical Check Elec_Chk_Ta57_Post_Beam_SHC_11-28-28.pdfElec_Chk_TM4_no_tgt_SHC_11-28-18.pdfElec_Chk_UC26_SHC_11-28-18.pdfElec_Chk_UC26_IGLIS_part_SHC_11-28-18.pdf
Entry  Wednesday, November 28, 2018, 07:04, David Wang, ITE, Development, TM4, LpTa 56, New high current flexible cables inspection after LpTa#56 beam run. new_flexibble_cable_in_ITE_after_Ta#56_run_001.JPGnew_flexibble_cable_in_ITE_after_Ta#56_run_004.JPG
Entry  Wednesday, November 28, 2018, 06:39, David Wang, Conditioning Station, Standard Operation, , , Disconnection checklist LpTa #56 LpTa#56_disconnection_checklist.pdf
Entry  Tuesday, November 27, 2018, 13:31, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#57, Ta#57 removal 
Entry  Tuesday, November 27, 2018, 11:05, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#57, Module move 
Entry  Monday, November 26, 2018, 12:19, chad fisher, North Hot-Cell, Repair, , , East Manipulator 20181126_113326.jpg20181126_113338.jpg
Entry  Thursday, November 22, 2018, 14:38, Isaac Earle, North Hot-Cell, Development, , , NHC design approved by High Voltage Engineer NHCHV.pdf
Entry  Thursday, November 22, 2018, 08:55, Anders Mjos, ITW, Repair, TM2, UC#25, ITW:FC5 safety signal limit switch installed FC5_limit_switch.jpg
Entry  Thursday, November 22, 2018, 08:53, Anders Mjos, ITW, Standard Operation, TM2, UC#25, Block move 
Entry  Thursday, November 22, 2018, 08:52, Anders Mjos, ITE, Standard Operation, TM4, Ta#57, Closed ITE dump water 
Entry  Wednesday, November 14, 2018, 16:10, Anders Mjos, ITW, Repair, TM2, UC#25, ITW:FC5 safety signal troubleshooting 2018-11-13_FC5.pdf
Entry  Thursday, November 08, 2018, 09:27, chad fisher, South Hot-Cell, Maintenance, , , South East Manipulator cable replacement 
Entry  Wednesday, November 07, 2018, 09:50, Anders Mjos, ITW, Standard Operation, TM2, UC#25, TM2 connected in ITW 
Entry  Tuesday, November 06, 2018, 10:59, Travis Cave, ITW, Standard Operation, TM2, UC#25, Module move 