  1152   Wednesday, January 13, 2016, 09:57 Travis CaveSpent Target VaultStandard Operation Ta#35, Ta#39, SiC#27, UC#12, ThO#1Spent targets moved to mini storage.Five spent targets have been moved from
the Spent Target Vault to Mini Storage in
preparation for transfer to F-308s in February.
  
  5   Tuesday, July 19, 2011, 11:17 Travis CaveSouth Hot-CellStandard OperationTM4Ta#35Move of TM#4 from East target station to south hot cell.Move went well no problems readings at
East Target Station were very high at 500mSv/hr.
  
  13   Monday, July 25, 2011, 14:49 Travis CaveSpent Target VaultStandard Operation Ta#35Spent target moveTa#35, in pail #88, has been place into
spent target storage, in spot 6C. Upon removal
from the South Hot Cell it was 411mSv/hr
  
  294   Thursday, April 11, 2013, 07:18 David WangConditioning StationMaintenanceTM1Ta#29helium pressure tested all water lines in TM1 at CSOn April 08th, all water lines in TM1 had
been helium pressure tested(70psi) at conditioning
station. No leak had been found.
  
  2002   Monday, October 07, 2019, 09:56 Adam NewsomeITEStandard OperationTM2Ta 59TM2 MoveTM2 has been moved from the Conditioning
Station to ITE with Ta#59 target.
  
  2003   Monday, October 07, 2019, 14:03 David WangITEStandard OperationTM2Ta 59TM2 has been connected in ITE.Tm2 with Ta 59 has eben connected in ITE.
Turbo pumps are started. See checklist
 Ta_59_TM2_ITE__connection_checklist..pdf 
  2022   Tuesday, November 05, 2019, 11:57 David WangITEStandard OperationTM2Ta 59Ta#59 disconnection checklistSee attachment  Ta#59_disconnection_checklist.pdf 
  1960   Tuesday, August 13, 2019, 09:49 Adam NewsomeSouth Hot-CellStandard OperationTM2Ta 58TM2 MoveTM2 was moved from ITE to South Hot Cell.
Tantalum 58 target. 
  
  2354   Tuesday, August 09, 2022, 12:23 Frank SongNorth Hot-CellStandard OperationTM4Ta #64Electrical Check for TM4 with Ta#64 after beam at NHC An electrical check made at NHC right
after TM4 moving from ITE.
 tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg 
  2275   Wednesday, November 24, 2021, 07:17 Frank SongSouth Hot-CellStandard OperationTM4Ta #63TM4 SIS with Target and No external Connectionsthe TM4 with new target Ta #63 installed
in SHC and an electric check was made by
David. 
 IMG_4469.JPG 
  2282   Wednesday, January 05, 2022, 09:38 Frank SongITEMaintenanceTM4Ta #63TM4 SIS with Target and No external Connections electric check done in ITE.   tm4_with_Ta#63.jpg 
  2292   Tuesday, January 18, 2022, 11:02 Frank SongNorth Hot-CellStandard OperationTM4Ta #63TM4 SIS with Target and No external Connections David made an electric check after
TM4 been moved to NHC from ITE. The target
is still on the module. Please find out attached
 tm4_with_Ta#63_on_NHC.jpg 
  2293   Wednesday, January 19, 2022, 09:00 Frank SongNorth Hot-CellStandard OperationTM4Ta #63Electrical check on TM4 at NHC without target David did electrical check after
target removed from TM4 at NHC. see attachment
pls.
 20220119_080049.jpg 
  2489   Thursday, September 14, 2023, 11:16 Adam NewsomeSpent Target VaultDevelopment Ta #58Investigation of Pail 211 (Ta #58)Upon attempting to lower Pail 211 into
their tile hole, CNL encountered issues with
the pail getting stuck. They shipped the
 Report_on_Inspection_of_Pail_211_on_2023-09-14.pdf 
  1799   Wednesday, October 03, 2018, 14:16 David WangSouth Hot-CellStandard OperationTM4Ta #57Leak check TM4 Lp Ta# 57 at SHC.Tried to leak check TM4 Ta57# at TCS. LD
failed to pump down properly at fine range.
It always tripped at 4 torr. I cheeked all
  
  569   Wednesday, December 04, 2013, 13:57 chad fisherSouth Hot-CellStandard OperationTM4Ta #47Ta #47 Removed - broken boltTa #47 has been removed from TM4.
One containment box cover bolt would
not come out. Upon attempted removal with
  
  635   Monday, March 31, 2014, 13:22 Bevan MossConditioning StationStandard OperationTM4Ta #42HV conditioning TM4 with Ta#42 was HV conditioned
to 35kV with the optics tray at 17.5kV. There
was some vacuum response while ramping but
 31032014_TM4_Ta#42_HV_Conditioning.txt31032014_Ta#42_HV_conditioning.JPG 
  360   Thursday, May 23, 2013, 14:08 Bevan MossConditioning StationStandard OperationTM4Ta #40Turbo Pumps on The turbo pumps have been turned
on and are running
  
  362   Monday, May 27, 2013, 10:35 Bevan MossConditioning StationStandard OperationTM4Ta #40Pumps Started HV testing to followThe pumps have been turned on at ~9:30
this morning. Current values are 6.61 Mohm
TCS:DIC1 @19.4 C. HV testing will start momentarily.
  
  367   Monday, May 27, 2013, 16:07 Bevan MossConditioning StationStandard OperationTM4Ta #40HV conditioning The HV conditioning reached a maximum
of 44kV today before a spark took out the
canbus card. I will attach the data once
  