1152
|
Wednesday, January 13, 2016, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#35, Ta#39, SiC#27, UC#12, ThO#1 | Spent targets moved to mini storage. | Five spent targets have been moved from
the Spent Target Vault to Mini Storage in
preparation for transfer to F-308s in February. |
|
5
|
Tuesday, July 19, 2011, 11:17 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#35 | Move of TM#4 from East target station to south hot cell. | Move went well no problems readings at
East Target Station were very high at 500mSv/hr. |
|
13
|
Monday, July 25, 2011, 14:49 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#35 | Spent target move | Ta#35, in pail #88, has been place into
spent target storage, in spot 6C. Upon removal
from the South Hot Cell it was 411mSv/hr |
|
294
|
Thursday, April 11, 2013, 07:18 |
David Wang | Conditioning Station | Maintenance | TM1 | Ta#29 | helium pressure tested all water lines in TM1 at CS | On April 08th, all water lines in TM1 had
been helium pressure tested(70psi) at conditioning
station. No leak had been found. |
|
2002
|
Monday, October 07, 2019, 09:56 |
Adam Newsome | ITE | Standard Operation | TM2 | Ta 59 | TM2 Move | TM2 has been moved from the Conditioning
Station to ITE with Ta#59 target. |
|
2003
|
Monday, October 07, 2019, 14:03 |
David Wang | ITE | Standard Operation | TM2 | Ta 59 | TM2 has been connected in ITE. | Tm2 with Ta 59 has eben connected in ITE.
Turbo pumps are started. See checklist |
|
2022
|
Tuesday, November 05, 2019, 11:57 |
David Wang | ITE | Standard Operation | TM2 | Ta 59 | Ta#59 disconnection checklist | See attachment |
|
1960
|
Tuesday, August 13, 2019, 09:49 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | Ta 58 | TM2 Move | TM2 was moved from ITE to South Hot Cell.
Tantalum 58 target. |
|
2354
|
Tuesday, August 09, 2022, 12:23 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #64 | Electrical Check for TM4 with Ta#64 after beam at NHC | An electrical check made at NHC right
after TM4 moving from ITE. |
|
2275
|
Wednesday, November 24, 2021, 07:17 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta #63 | TM4 SIS with Target and No external Connections | the TM4 with new target Ta #63 installed
in SHC and an electric check was made by
David. |
|
2282
|
Wednesday, January 05, 2022, 09:38 |
Frank Song | ITE | Maintenance | TM4 | Ta #63 | TM4 SIS with Target and No external Connections | electric check done in ITE. |
|
2292
|
Tuesday, January 18, 2022, 11:02 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #63 | TM4 SIS with Target and No external Connections | David made an electric check after
TM4 been moved to NHC from ITE. The target
is still on the module. Please find out attached |
|
2293
|
Wednesday, January 19, 2022, 09:00 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #63 | Electrical check on TM4 at NHC without target | David did electrical check after
target removed from TM4 at NHC. see attachment
pls. |
|
2489
|
Thursday, September 14, 2023, 11:16 |
Adam Newsome | Spent Target Vault | Development | | Ta #58 | Investigation of Pail 211 (Ta #58) | Upon attempting to lower Pail 211 into
their tile hole, CNL encountered issues with
the pail getting stuck. They shipped the |
|
1799
|
Wednesday, October 03, 2018, 14:16 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta #57 | Leak check TM4 Lp Ta# 57 at SHC. | Tried to leak check TM4 Ta57# at TCS. LD
failed to pump down properly at fine range.
It always tripped at 4 torr. I cheeked all |
|
569
|
Wednesday, December 04, 2013, 13:57 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta #47 | Ta #47 Removed - broken bolt | Ta #47 has been removed from TM4.
One containment box cover bolt would
not come out. Upon attempted removal with |
|
635
|
Monday, March 31, 2014, 13:22 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #42 | HV conditioning | TM4 with Ta#42 was HV conditioned
to 35kV with the optics tray at 17.5kV. There
was some vacuum response while ramping but |
 |
360
|
Thursday, May 23, 2013, 14:08 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | Turbo Pumps on | The turbo pumps have been turned
on and are running |
|
362
|
Monday, May 27, 2013, 10:35 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | Pumps Started HV testing to follow | The pumps have been turned on at ~9:30
this morning. Current values are 6.61 Mohm
TCS:DIC1 @19.4 C. HV testing will start momentarily. |
|
367
|
Monday, May 27, 2013, 16:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | HV conditioning | The HV conditioning reached a maximum
of 44kV today before a spark took out the
canbus card. I will attach the data once |
|