ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  2145   Tuesday, September 22, 2020, 10:56 Travis CaveSouth Hot-CellStandard OperationTM4UC#30Module move TM#4 with UC#30 has been moved from
ITE to the south hot cell.
  
  2146   Wednesday, September 23, 2020, 10:56 chad fisherSouth Hot-CellStandard OperationTM4UC#31 P2NUc#30 removed UC#31 P2N installedUCx#30 has been removed from TM#4 and put
in a can with argon. 5(10) pin connector
had to have guide screws removed to be uninstalled.
  
  2151   Tuesday, September 29, 2020, 14:28 David WangSouth Hot-CellStandard OperationTM4UC#31TM4 UC#31 Electrical check and HS leak checkTm4 UCx 31# electrical check result. See
attachment.
 TM4_UCx31_elctrical_and_leak_check_at_SHC..pdfScanned_from_a_Xerox_Multifunction_Printer.pdf 
  2152   Wednesday, September 30, 2020, 09:54 Travis CaveSouth Hot-CellStandard OperationTM3no targetModule move TM#3 is now in the south hot cell.   
  2156   Monday, October 19, 2020, 12:52 David WangSouth Hot-CellStandard OperationTM2C#2TM2 electrical and leak check at SHCTM2 electrical check and leak check are
done at SHC with C#2 target installed. The
results are good.  
 Tm3_bunker_set_up_018.JPG 
  2160   Tuesday, November 03, 2020, 10:52 Travis CaveSouth Hot-CellStandard OperationTM4UC#31Module move TM#4 with UC#31 has been moved from
the east target station to the south hot
cell.
  
  2164   Tuesday, November 17, 2020, 10:17 Adam NewsomeSouth Hot-CellStandard OperationTM2 Module MoveTM2 has been moved from ITW to the South
Hot Cell. 
  
  2165   Wednesday, November 18, 2020, 15:28 David WangSouth Hot-CellStandard OperationTM2Nb#6electrical check and HS leak check.Everything looks good. A still short to
P before target installation. We will float
P,Q as before on module top. 
 Screenshot_2020-11-18_Mail_-_David_Wang_-_Outlook.png 
  2170   Wednesday, November 25, 2020, 09:05 Adam NewsomeSouth Hot-CellStandard OperationTM3 Module MoveTM3 has been moved from
the Silo to the South Hot Cell.
  
  2172   Thursday, December 10, 2020, 15:07 Adam NewsomeSouth Hot-CellDevelopmentTM3 TM3 MoveTM3 was remotely moved from the conditioning
station to the South Hot Cell. No containment
box.
  
  2177   Friday, January 08, 2021, 09:40 Travis CaveSouth Hot-CellStandard OperationTM4Ta#61Module move TM#4 with Ta#61 has been moved from
the east target station to the south hot
cell.
  
  2181   Monday, January 25, 2021, 10:57 David WangSouth Hot-CellRepairTM4 TM4 steers short investigation.Cables were disconnected for steers in
containment box. The Megga measurement (500V)
result from the top of the module: 
  
  2199   Friday, March 12, 2021, 11:36 Travis CaveSouth Hot-CellMaintenance East Entrance ModuleEntrance module move The East Entrance Module has been
moved from the East Target Station to the
South Hot Cell.
  
  2203   Tuesday, March 23, 2021, 09:47 David WangSouth Hot-CellStandard OperationTM3 TM3 has been moved from TCS to SHC.Frank and I removed Tm3 from TCS to SHC.
The move is successful. 
  
  2209   Wednesday, April 21, 2021, 10:32 David WangSouth Hot-CellStandard OperationTM3 Remotely remove TM3 from SHC to siloOn 2021-04-19, Frank and I remotely removed
Tm3 from SHC to silo . The moving is successful.
  
  2210   Wednesday, April 21, 2021, 10:34 David WangSouth Hot-CellStandard OperationTM4 Remtely remove TM4 from Silo to SHC. On 2021- 04-20,  Tm4 is removed from
Silo to SHC. The moving is smooth. 
  
  2212   Thursday, April 22, 2021, 08:41 David WangSouth Hot-CellRepairTM4  TM4 steerer electical check at SHC and TH.Using SHC electrical test cables routed
to to TH,  We tested TM4 steerer 
4 polarities. At 100v megga test, left, right
  
  2213   Monday, April 26, 2021, 13:02 David WangSouth Hot-CellRepairTM4 TM4 new steerer cable installation.New steerer cables are installed in TM4.
Cables are properly routed in containment
box and service cap top. After job, TP2 is
  
  2222   Thursday, June 03, 2021, 08:20 David WangSouth Hot-CellStandard OperationTM2 Remotely remove TM2 from silo to shcRemotely removed Tm2 from silo to SHC.
The moving is smooth. 
  
  2223   Thursday, June 03, 2021, 08:33 David WangSouth Hot-CellStandard OperationTM4UCX32# P2NP2N UCX 32 on TM4 electical check and leak check at SHC.Both electrical check and leak check (HS
and Window lines)results are good.  
See attachments
 P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf 