Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 48 of 138  Not logged in ELOG logo
Entry  Tuesday, July 19, 2011, 11:52, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#36, New target Ta#36 Installed on TM4 DSC_0897.JPGDSC_0899.JPGDSC_0901.JPGDSC_0905.JPG
Ta#36 has been installed on TM4 and is awaiting leak and electrical check.
A small piece of the standard top insulator ITA3376 broke off during removal of Ta#35 (indicated with a blue circle on attached pictures).
"JP's connector, ITA2493 showed the usual and as yet undiagnosed "arc" mark (picture to follow).
Entry  Tuesday, July 19, 2011, 12:02, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#36, Electrical check TM#4_SIS_Elec_Check2.pdf
See attached PDF for the details.
Entry  Tuesday, July 19, 2011, 13:51, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#36, TM4 Ta#36 Leak Check Results DOC.PDF
Tm4 w/ Ta#36 has been vacuum leak checked using the standard leak check procedure.
At 1:45pm RH was contacted to notify them that TM4 is ready to move.
Entry  Wednesday, July 20, 2011, 09:55, Travis Cave, ITE, Standard Operation, TM4, Ta#36, Move of TM#4 from South Hot Cell to East Target Station. 
Move completed, move went well.
Entry  Wednesday, September 28, 2011, 09:07, Travis Cave, ITE, Standard Operation, TM4, Ta#36, Move of TM#4 from East target station to south hot cell. 
Move of TM#4 with Ta#36 from East target station to south hot cell, move went well.
Entry  Wednesday, September 28, 2011, 10:06, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#36, Ta#36 Removal 
Ta#36 was removed from target module 4.
The standard, unexplained, un-investegated, un-resolved "arc" were again present on "JP's connector", otherwise no apparent
problems visible.
Entry  Thursday, September 29, 2011, 11:11, Travis Cave, Spent Target Vault, Standard Operation, , Ta#36, Spent target move 
The spent Ta#36 has been moved to the storage vault. It was placed in pail #90, and placed into slot 3B, it was 111mSv/hr upon removal from the south
hot cell. There are 6 free slots left in the storage vault.
Entry  Wednesday, January 13, 2016, 09:57, Travis Cave, Spent Target Vault, Standard Operation, , Ta#35, Ta#39, SiC#27, UC#12, ThO#1, Spent targets moved to mini storage. 
Five spent targets have been moved from the Spent Target Vault to Mini Storage in preparation for transfer to F-308s in February. The following targets
were moved Ta#35, Ta#39, SiC#27, UC#12, ThO#1
Entry  Tuesday, July 19, 2011, 11:17, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#35, Move of TM#4 from East target station to south hot cell. 
Move went well no problems readings at East Target Station were very high at 500mSv/hr.
Entry  Monday, July 25, 2011, 14:49, Travis Cave, Spent Target Vault, Standard Operation, , Ta#35, Spent target move 
Ta#35, in pail #88, has been place into spent target storage, in spot 6C. Upon removal from the South Hot Cell it was 411mSv/hr our hottest target to
be placed into storage to date. There are 8 free slots for targets left in the vault.
Entry  Thursday, April 11, 2013, 07:18, David Wang, Conditioning Station, Maintenance, TM1, Ta#29, helium pressure tested all water lines in TM1 at CS 
On April 08th, all water lines in TM1 had been helium pressure tested(70psi) at conditioning station. No leak had been found.
Entry  Monday, October 07, 2019, 09:56, Adam Newsome, ITE, Standard Operation, TM2, Ta 59, TM2 Move 
TM2 has been moved from the Conditioning Station to ITE with Ta#59 target.
Entry  Monday, October 07, 2019, 14:03, David Wang, ITE, Standard Operation, TM2, Ta 59, TM2 has been connected in ITE. Ta_59_TM2_ITE__connection_checklist..pdf
Tm2 with Ta 59 has eben connected in ITE. Turbo pumps are started. See checklist
Entry  Tuesday, November 05, 2019, 11:57, David Wang, ITE, Standard Operation, TM2, Ta 59, Ta#59 disconnection checklist Ta#59_disconnection_checklist.pdf
See attachment
Entry  Tuesday, August 13, 2019, 09:49, Adam Newsome, South Hot-Cell, Standard Operation, TM2, Ta 58, TM2 Move 
TM2 was moved from ITE to South Hot Cell. Tantalum 58 target. 
Entry  Tuesday, August 09, 2022, 12:23, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #64, Electrical Check for TM4 with Ta#64 after beam at NHC tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg
 An electrical check made at NHC right after TM4 moving from ITE.
Entry  Wednesday, November 24, 2021, 07:17, Frank Song, South Hot-Cell, Standard Operation, TM4, Ta #63, TM4 SIS with Target and No external Connections IMG_4469.JPG
the TM4 with new target Ta #63 installed in SHC and an electric check was made by David. 
Entry  Wednesday, January 05, 2022, 09:38, Frank Song, ITE, Maintenance, TM4, Ta #63, TM4 SIS with Target and No external Connections tm4_with_Ta#63.jpg
 electric check done in ITE. 
Entry  Tuesday, January 18, 2022, 11:02, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #63, TM4 SIS with Target and No external Connections tm4_with_Ta#63_on_NHC.jpg
 David made an electric check after TM4 been moved to NHC from ITE. The target is still on the module. Please find out attached pic for detail.
Entry  Wednesday, January 19, 2022, 09:00, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #63, Electrical check on TM4 at NHC without target 20220119_080049.jpg
 David did electrical check after target removed from TM4 at NHC. see attachment pls.
ELOG V2.9.2-2455