Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 18     Entry time: Wednesday, August 03, 2011, 11:24
Author: Travis Cave 
Category: ITW 
Type: Standard Operation 
Module: TM1 
Target/Number: Ta#37 
Subject: Module move 

TM#1 with Ta#37 has been moved from the conditioning station to the the west target station, move went well.

ELOG V2.9.2-2455