  15   Thursday, July 28, 2011, 12:02 Travis CaveSouth Hot-CellStandard OperationTM1Ta#37Electrical check

TM#1 has passed the the electrical check.

Attachment 1: Electrical_Check_for_TM_1_with_Target_attached_Ta37.pdf
Electrical_Check_for_TM_1_with_Target_attached_Ta37.pdf
  16   Thursday, July 28, 2011, 14:07 Travis CaveConditioning StationStandard OperationTM1Ta#37Module move

Tm#1 with Ta#37 moved from the south hot cell to the conditioning station. Move went well.

  18   Wednesday, August 03, 2011, 11:24 Travis CaveITWStandard OperationTM1Ta#37Module move

TM#1 with Ta#37 has been moved from the conditioning station to the the west target station, move went well.

  27   Wednesday, September 14, 2011, 10:32 Travis CaveSpent Target VaultStandard Operation Ta#37Spent target move

Ta#37 has been moved from the south hot cell into the storage vault. The target is in pail #89 and in spot 6A in the vault. It was 840uSv/hr upon removal from the south hot cell. There are 7 free spots left in the vault.

  6   Tuesday, July 19, 2011, 11:52 chad fisherSouth Hot-CellStandard OperationTM4Ta#36New target Ta#36 Installed on TM4

Ta#36 has been installed on TM4 and is awaiting leak and electrical check.

A small piece of the standard top insulator ITA3376 broke off during removal of Ta#35 (indicated with a blue circle on attached pictures).

"JP's connector, ITA2493 showed the usual and as yet undiagnosed "arc" mark (picture to follow).

The plastic retainers on the new torqtite gaskets showed rad damage.

Attachment 1: DSC_0897.JPG
DSC_0897.JPG
Attachment 2: DSC_0899.JPG
DSC_0899.JPG
Attachment 3: DSC_0901.JPG
DSC_0901.JPG
Attachment 4: DSC_0905.JPG
DSC_0905.JPG
  7   Tuesday, July 19, 2011, 12:02 Travis CaveSouth Hot-CellStandard OperationTM4Ta#36Electrical check

See attached PDF for the details.

Attachment 1: TM#4_SIS_Elec_Check2.pdf
TM#4_SIS_Elec_Check2.pdf
  9   Tuesday, July 19, 2011, 13:51 chad fisherSouth Hot-CellStandard OperationTM4Ta#36TM4 Ta#36 Leak Check Results

Tm4 w/ Ta#36 has been vacuum leak checked using the standard leak check procedure.

At 1:45pm RH was contacted to notify them that TM4 is ready to move.

Attachment 1: DOC.PDF
DOC.PDF
  10   Wednesday, July 20, 2011, 09:55 Travis CaveITEStandard OperationTM4Ta#36Move of TM#4 from South Hot Cell to East Target Station.

Move completed, move went well.

  28   Wednesday, September 28, 2011, 09:07 Travis CaveITEStandard OperationTM4Ta#36Move of TM#4 from East target station to south hot cell.

Move of TM#4 with Ta#36 from East target station to south hot cell, move went well.

  29   Wednesday, September 28, 2011, 10:06 chad fisherSouth Hot-CellStandard OperationTM4Ta#36Ta#36 Removal

Ta#36 was removed from target module 4.

The standard, unexplained, un-investegated, un-resolved "arc" were again present on "JP's connector", otherwise no apparent problems visible.

 

Chad

 

 

  31   Thursday, September 29, 2011, 11:11 Travis CaveSpent Target VaultStandard Operation Ta#36Spent target move

The spent Ta#36 has been moved to the storage vault. It was placed in pail #90, and placed into slot 3B, it was 111mSv/hr upon removal from the south hot cell. There are 6 free slots left in the storage vault.

  1152   Wednesday, January 13, 2016, 09:57 Travis CaveSpent Target VaultStandard Operation Ta#35, Ta#39, SiC#27, UC#12, ThO#1Spent targets moved to mini storage.

Five spent targets have been moved from the Spent Target Vault to Mini Storage in preparation for transfer to F-308s in February. The following targets were moved Ta#35, Ta#39, SiC#27, UC#12, ThO#1

  5   Tuesday, July 19, 2011, 11:17 Travis CaveSouth Hot-CellStandard OperationTM4Ta#35Move of TM#4 from East target station to south hot cell.

Move went well no problems readings at East Target Station were very high at 500mSv/hr.

  13   Monday, July 25, 2011, 14:49 Travis CaveSpent Target VaultStandard Operation Ta#35Spent target move

Ta#35, in pail #88, has been place into spent target storage, in spot 6C. Upon removal from the South Hot Cell it was 411mSv/hr our hottest target to be placed into storage to date. There are 8 free slots for targets left in the vault.

  294   Thursday, April 11, 2013, 07:18 David WangConditioning StationMaintenanceTM1Ta#29helium pressure tested all water lines in TM1 at CS

On April 08th, all water lines in TM1 had been helium pressure tested(70psi) at conditioning station. No leak had been found.

  2002   Monday, October 07, 2019, 09:56 Adam NewsomeITEStandard OperationTM2Ta 59TM2 Move

TM2 has been moved from the Conditioning Station to ITE with Ta#59 target.

  2003   Monday, October 07, 2019, 14:03 David WangITEStandard OperationTM2Ta 59TM2 has been connected in ITE.

Tm2 with Ta 59 has eben connected in ITE. Turbo pumps are started. See checklist

Attachment 1: Ta_59_TM2_ITE__connection_checklist..pdf
Ta_59_TM2_ITE__connection_checklist..pdf Ta_59_TM2_ITE__connection_checklist..pdf Ta_59_TM2_ITE__connection_checklist..pdf
  2022   Tuesday, November 05, 2019, 11:57 David WangITEStandard OperationTM2Ta 59Ta#59 disconnection checklist

See attachment

Attachment 1: Ta#59_disconnection_checklist.pdf
Ta#59_disconnection_checklist.pdf Ta#59_disconnection_checklist.pdf Ta#59_disconnection_checklist.pdf
  1960   Tuesday, August 13, 2019, 09:49 Adam NewsomeSouth Hot-CellStandard OperationTM2Ta 58TM2 Move

TM2 was moved from ITE to South Hot Cell. Tantalum 58 target.

  2354   Tuesday, August 09, 2022, 12:23 Frank SongNorth Hot-CellStandard OperationTM4Ta #64Electrical Check for TM4 with Ta#64 after beam at NHC

 An electrical check made at NHC right after TM4 moving from ITE.

Attachment 1: tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg
tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg