6
|
Tuesday, July 19, 2011, 11:52 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#36 | New target Ta#36 Installed on TM4 |
Ta#36 has been installed on TM4 and is awaiting leak and electrical check.
A small piece of the standard top insulator ITA3376 broke off during removal of Ta#35 (indicated with a blue circle on attached pictures).
"JP's connector, ITA2493 showed the usual and as yet undiagnosed "arc" mark (picture to follow).
The plastic retainers on the new torqtite gaskets showed rad damage. |
7
|
Tuesday, July 19, 2011, 12:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#36 | Electrical check |
See attached PDF for the details. |
9
|
Tuesday, July 19, 2011, 13:51 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#36 | TM4 Ta#36 Leak Check Results |
Tm4 w/ Ta#36 has been vacuum leak checked using the standard leak check procedure.
At 1:45pm RH was contacted to notify them that TM4 is ready to move. |
10
|
Wednesday, July 20, 2011, 09:55 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#36 | Move of TM#4 from South Hot Cell to East Target Station. |
Move completed, move went well. |
28
|
Wednesday, September 28, 2011, 09:07 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#36 | Move of TM#4 from East target station to south hot cell. |
Move of TM#4 with Ta#36 from East target station to south hot cell, move went well. |
29
|
Wednesday, September 28, 2011, 10:06 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#36 | Ta#36 Removal |
Ta#36 was removed from target module 4.
The standard, unexplained, un-investegated, un-resolved "arc" were again present on "JP's connector", otherwise no apparent problems visible.
Chad
|
31
|
Thursday, September 29, 2011, 11:11 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#36 | Spent target move |
The spent Ta#36 has been moved to the storage vault. It was placed in pail #90, and placed into slot 3B, it was 111mSv/hr upon removal from the south hot cell. There are 6 free slots left in the storage vault. |
1152
|
Wednesday, January 13, 2016, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#35, Ta#39, SiC#27, UC#12, ThO#1 | Spent targets moved to mini storage. |
Five spent targets have been moved from the Spent Target Vault to Mini Storage in preparation for transfer to F-308s in February. The following targets were moved Ta#35, Ta#39, SiC#27, UC#12, ThO#1 |
5
|
Tuesday, July 19, 2011, 11:17 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#35 | Move of TM#4 from East target station to south hot cell. |
Move went well no problems readings at East Target Station were very high at 500mSv/hr. |
13
|
Monday, July 25, 2011, 14:49 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#35 | Spent target move |
Ta#35, in pail #88, has been place into spent target storage, in spot 6C. Upon removal from the South Hot Cell it was 411mSv/hr our hottest target to be placed into storage to date. There are 8 free slots for targets left in the vault. |
294
|
Thursday, April 11, 2013, 07:18 |
David Wang | Conditioning Station | Maintenance | TM1 | Ta#29 | helium pressure tested all water lines in TM1 at CS |
On April 08th, all water lines in TM1 had been helium pressure tested(70psi) at conditioning station. No leak had been found. |
2002
|
Monday, October 07, 2019, 09:56 |
Adam Newsome | ITE | Standard Operation | TM2 | Ta 59 | TM2 Move |
TM2 has been moved from the Conditioning Station to ITE with Ta#59 target. |
2003
|
Monday, October 07, 2019, 14:03 |
David Wang | ITE | Standard Operation | TM2 | Ta 59 | TM2 has been connected in ITE. |
Tm2 with Ta 59 has eben connected in ITE. Turbo pumps are started. See checklist |
2022
|
Tuesday, November 05, 2019, 11:57 |
David Wang | ITE | Standard Operation | TM2 | Ta 59 | Ta#59 disconnection checklist |
See attachment |
1960
|
Tuesday, August 13, 2019, 09:49 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | Ta 58 | TM2 Move |
TM2 was moved from ITE to South Hot Cell. Tantalum 58 target. |
2354
|
Tuesday, August 09, 2022, 12:23 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #64 | Electrical Check for TM4 with Ta#64 after beam at NHC |
An electrical check made at NHC right after TM4 moving from ITE. |
2275
|
Wednesday, November 24, 2021, 07:17 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta #63 | TM4 SIS with Target and No external Connections |
the TM4 with new target Ta #63 installed in SHC and an electric check was made by David. |
2282
|
Wednesday, January 05, 2022, 09:38 |
Frank Song | ITE | Maintenance | TM4 | Ta #63 | TM4 SIS with Target and No external Connections |
electric check done in ITE. |
2292
|
Tuesday, January 18, 2022, 11:02 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #63 | TM4 SIS with Target and No external Connections |
David made an electric check after TM4 been moved to NHC from ITE. The target is still on the module. Please find out attached pic for detail. |
2293
|
Wednesday, January 19, 2022, 09:00 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #63 | Electrical check on TM4 at NHC without target |
David did electrical check after target removed from TM4 at NHC. see attachment pls. |