2513
|
Tuesday, January 02, 2024, 16:01 |
Carla Babcock | Conditioning Station | Development | TM3 | | TM3 service tray HV testing and conditioning | Tuesday, January 02, 2024, 15:58 :
Started HV ramp up on TM3 service
tray about 3pm today. Had to bypass TCS:BIAS |
 |
1095
|
Tuesday, October 06, 2015, 21:12 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | | TM3 service cap inspection in target hall | David Wang and I did the service cap inspection
in target hall: see WP I2015-10-06-10.<br>
Signs of sparking were seen underneath |
|
2520
|
Thursday, January 11, 2024, 13:54 |
David Wang | Conditioning Station | Development | TM3 | | TM3 servic cap air to vacumm seals leak check. | After Tm3 service tray and service cap
installation, TM3 service cap air to vacuum
seals leak check has been done at TCS. TCS:IG1 |
|
324
|
Friday, April 26, 2013, 14:31 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 refurb E.O.D. | Service tray side of the waterblock jig
is installed and all locking tabs enagaed
save the heat shield circuit. Locking tab |
|
300
|
Wednesday, April 17, 2013, 09:02 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 ready for conditioning station | The heat shield circuit blank offs have
been re-installed and front cover replaced.
TM3 is ready to move to the conditioning |
|
1504
|
Wednesday, April 26, 2017, 08:28 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 progress and manipulators | containment box was re-installed onto TM3
on Monday, Left manipulator may be showing
signs of eminent handle or tong cable failure. |
|
2562
|
Thursday, April 11, 2024, 06:27 |
David Wang | South Hot-Cell | Development | TM3 | | TM3 new source tray was transferred into SHC on this Tuesday. | TM3 new source tray was transferred into
SHC on this Tuesday. one hook arm of transfer
jig is very close to optic tray tube when |
|
427
|
Monday, August 26, 2013, 18:26 |
Grant Minor | Conditioning Station | Standard Operation | TM3 | | TM3 moved from Hot Cell to Conditioning Station | Target Module 3 with no target, and a partially-installed
Rev-3 source tray (no steerers connected,
no IMG connected, entrance window lines blanked |
|
2720
|
Monday, November 25, 2024, 09:56 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 move - silo to SHC | TM3 was moved from silo to SHC with no
target. Move successful. |
|
2727
|
Tuesday, December 03, 2024, 12:28 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM3 move - TCS to ITE | TM3 was moved with UCx#47 from TCS to ITE.
The move was smooth. |
|
2722
|
Tuesday, November 26, 2024, 13:54 |
Adam Newsome | Conditioning Station | Standard Operation | TM3 | | TM3 move - SHC to TCS | TM3 was moved from SHC to TCS with UCx#47.
The move was smooth. |
|
423
|
Wednesday, August 21, 2013, 20:36 |
Grant Minor | South Hot-Cell | Repair | TM3 | | TM3 module-side water block sealing surface inspection (post polishing) | The water block sealing surfaces on the
module-side of TM3 were polished this week
by Chad Fisher, using his air-ratchet controlled |
 |
2568
|
Friday, April 26, 2024, 08:56 |
David Wang | Conditioning Station | Development | TM3 | | TM3 module top helium spray leak test. | TM3 module top helium spray leak test was
done yesterday. No leak on TM3 module
top @ LD base leak rate 0.0 x E-9 atm.cc/sec. |
|
398
|
Friday, July 05, 2013, 10:02 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No source tray | TM3 module move to TCS | TM3 has been moved from the south hot cell
to the conditioning station. David and I
completed the move. All went well. |
|
401
|
Wednesday, July 17, 2013, 08:29 |
David Wang | Conditioning Station | Development | TM3 | | TM3 leak check in CS without source tray. | Leak checked TM3 without source tray in
CS this morning. The CS and TM3 vacuum: IG1(top
of the TM3 service cap)4.9x E-7Torr, IG2(diagnostic |
|
434
|
Thursday, August 29, 2013, 06:48 |
David Wang | Conditioning Station | Development | TM3 | | TM3 leak check in CS with new source tray. | A huge leak had been found on HS circuit
during 60 psi helium pressurize test. Other
circuits are free of obvious major leak at |
|
1351
|
Wednesday, September 14, 2016, 11:54 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 is disconnected at TCS. | TM3 is disconnected at TCS and ready
to be moved to silo. |
|
1792
|
Tuesday, September 25, 2018, 07:54 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 is connected for HV test at TCS. | water loops are by passed on top. All bias,
EE, and EL are tied together. Started
water system. |
|
349
|
Wednesday, May 15, 2013, 17:32 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | | TM3 in place but not connected | To confirm that the sparking was
coming from the module rather than the conditioning
station TM3 was grounded and the conditioning |
|
2569
|
Friday, April 26, 2024, 08:59 |
David Wang | Conditioning Station | Development | TM3 | | TM3 helium pressure test and electrical check with new source tray at TCS. | TM3 helium pressure test and electrical
check with new source tray at TCS were done
yesterday. The results are excellent. See |
|