  ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  1618   Tuesday, September 19, 2017, 13:53 Travis CaveSouth Hot-CellStandard OperationTM2Ta#53Module move TM#2 with Ta#53 has been moved from
the west target station to the south hot
cell.
  
  1619   Wednesday, September 20, 2017, 13:38 chad fisherSouth Hot-CellRepairTM2 TM2 Insulator replacementBroken insulators ITD0053 and ITD0054 have
been uninstalled from TM2.
 20170920_132813.jpg20170920_132820.jpg20170920_133244.jpg 
  1620   Thursday, September 21, 2017, 10:48 Travis CaveSouth Hot-CellStandard OperationTM2Ta#53Electrical CheckElectrical checks of TM#2 with Ta#53 and
also with out a target.
 TM2_Ta53_elec_chk_shc.PDFTM2_Ta53_elec_chk_post_beam_shc.PDFTM2_notgt_elec_chk_shc_09202017.PDF 
  1621   Thursday, September 21, 2017, 12:07 chad fisherSouth Hot-CellRepairTM2 Insulator ReplacementInsulators ITD0053 and 54 have been replaced.
All fasteners torqued to 56 in lbs.
 
  
  1622   Thursday, September 21, 2017, 16:26 Anders MjosSouth Hot-CellStandard OperationTM2 Inspection of Source TrayChad and Anders inspected the Source Tray
today using the camera in the hot cell. A
dark spot was observed on one of the four
 TM2_Source_Tray_EE_Insulator.pdf 
  1623   Friday, September 22, 2017, 11:00 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical CheckElectrical check of TM#2 after the insulator
change on thursday september 21.
 TM2_notgt_elec_chk_shc_09212017.PDF 
  1624   Friday, September 22, 2017, 12:13 David WangSouth Hot-CellMaintenanceTM2 TM2 service cap inside inspection.Two side panels on TM2 service cap were
removed for TM2 service cap inside inspection.
A piece of cable tie was found inside cap
 TM2_serica_cap_inspection_002.JPGTM2_serica_cap_inspection_003.JPGTM2_serica_cap_inspection_004.JPGTM2_serica_cap_inspection_005.JPGTM2_serica_cap_inspection_008.JPG 
  1625   Friday, September 22, 2017, 14:15 chad fisherSouth Hot-CellRepairTM2 TM2 containment box offTM2 containment box has been removed. Found
a piece of capton tape or tubing under table
(see picture).
 20170922_140546.jpg20170922_140927.jpg 
  1626   Tuesday, September 26, 2017, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54Electrical CheckElectrical check of TM#2 with Ta#54 at
the south hot cell. See attached PDF for
details.
 TM2_Ta54_elec_chk_SHC.PDF 
  1627   Wednesday, September 27, 2017, 08:00 chad fisherSouth Hot-CellStandard OperationTM2Ta#54Ta#54 installedContainment box has been replaced onto
TM2, interior of containment box vacuumed,
and Ta#54 installed with new fasteners (high
  
  1643   Tuesday, October 17, 2017, 10:56 Travis CaveSouth Hot-CellStandard OperationTM4UC#21Module move TM#4 with UC#21 has been moved from
the east target station to the south hot
cell.
  
  1644   Wednesday, October 18, 2017, 10:45 Travis CaveSouth Hot-CellStandard OperationTM4SiC#37Electrical Check The results of the electrical check
of TM#4 with SiC#37, see attached PDF.
 TM4_SIC37_elec_chk_SHC.pdf 
  1654   Tuesday, November 07, 2017, 10:11 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54Module move TM#2 with Ta#54 has been moved from
the west target station to the south hot
cell.
  
  1659   Monday, November 13, 2017, 13:39 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54 and #55Electrical Check The results of the various electrical
check done on the target module on November
7th and 8th of 2017. Checks were done with
 TM2-Ta54-_Electrical_Check_SHC_Post_Beam.pdfTM2-no_target-_Electrical_Check_SHC_Nov_2017.pdfTM2-Ta55_Electrical_Check_SHC.pdf 
  1698   Monday, April 09, 2018, 09:57 Travis CaveSouth Hot-CellStandard OperationTM2Ta#55Module move TM#2 with Ta#55 has been moved from
the west target station to the south hot
cell.
  
  1699   Tuesday, April 10, 2018, 10:43 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move TM#2 has been moved from the south
hot cell to the south west silo.
  
  1707   Tuesday, May 01, 2018, 13:40 Travis CaveSouth Hot-CellStandard OperationTM4SiC#37Electrical Check Electrical check of TM#4 with SiC#37
attached post beam. A short was found between
the Einzel Lens and Chassis. See attached
 TM4_electrical_check_SiC37_post_beam.pdf 
  1708   Thursday, May 03, 2018, 08:24 Travis CaveSouth Hot-CellStandard OperationTM4no targetElectrical Check The results of yesterdays electrical
check of TM#4 with no target attached. See
the attached PDF for details.
 TM4_Electrical_Check_notarget_May_2_2018.pdf 
  1709   Thursday, May 03, 2018, 13:26 Anders MjosSouth Hot-CellRepairTM4 EZL short troubleshootingYesterday Aaron, Isaac and Anders inspected
the EZL connection from the service chase
to the optics tray using the goose neck camera
  
  1711   Friday, May 04, 2018, 15:46 Anders MjosSouth Hot-CellRepairTM4 EZL short troubleshooting


   
        
            
  